school: Lincoln Elementary School
level: ES
category: Replacement
marker: orange_circle
description: Built in 1955
cumulative_total:
estimated_cost:
target_year: 2017
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.215369, -115.112115
longitude: -115.112115
existing_portables:
school: Bell Elementary School
level: ES
category: Replacement
marker: orange_circle
description: Built in 1963
cumulative_total:
estimated_cost:
target_year: 2017
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.140705, -115.180643
longitude: -115.180643
existing_portables:
school: Ullom Elementary School
level: ES
category: Replacement
marker: orange_circle
description: Built in 1962
cumulative_total:
estimated_cost:
target_year: 2018
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.10401, -115.066458
longitude: -115.066458
existing_portables:
school: Smith Middle School
level: MS
category: Replacement
marker: orange_circle
description: Built in 1952
cumulative_total:
estimated_cost:
target_year: 2018
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.191087, -115.123593
longitude: -115.123593
existing_portables:
school: Fremont Middle School
level: MS
category: Replacement
marker: orange_circle
description: Built in 1955, the middle school is planned to be replaced with John C. Fremont Elementary.
cumulative_total:
estimated_cost:
target_year: 2019
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.146954, -115.138954
longitude: -115.138954
existing_portables:
school: Ira Earl Elementary School
level: ES
category: Replacement
marker: orange_circle
description: Built in 1964
cumulative_total:
estimated_cost:
target_year: 2019
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.185681, -115.072049
longitude: -115.072049
existing_portables:
school: Mackey Elementary School
level: ES
category: Replacement
marker: orange_circle
description: Built in 1964
cumulative_total:
estimated_cost:
target_year: 2020
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.209286, -115.146597
longitude: -115.146597
existing_portables:
school: Thomas Elementary School
level: ES
category: Replacement
marker: orange_circle
description: Built in 1963
cumulative_total:
estimated_cost:
target_year: 2020
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.125352, -115.130534
longitude: -115.130534
existing_portables:
school: Wasden Elementary School
level: ES
category: Replacement
marker: orange_circle
description: Built in 1955
cumulative_total:
estimated_cost:
target_year: 2020
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.162393,-115.179876
longitude: -115.179876
existing_portables:
school: Griffith Elementary School
level: ES
category: Replacement
marker: orange_circle
description: Built in 1962
cumulative_total:
estimated_cost:
target_year: 2021
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.168887, -115.200895
longitude: -115.200895
existing_portables:
school: Sandy Valley Elementary School, Middle and High schools
level:
category: Phased replacement
marker: orange_circle
description: Phase 1 is in progress in the 2017 school year
cumulative_total:
estimated_cost:
target_year: Phase 2 is in 2018
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 35.813289, -115.609615
longitude: -115.609615
existing_portables:
school: Southeast Career and Technical Academy
level: HS
category: Phased replacement
marker: orange_circle
description: Phase 1 is completed
cumulative_total:
estimated_cost:
target_year: Phase 2 is in 2019
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.081527, -115.069961
longitude: -115.069961
existing_portables:
school: Hoggard Elementary School
level: ES
category: Phased replacement
marker: orange_circle
description: Phase 1 is completed
cumulative_total:
estimated_cost:
target_year: Phase 2 is in 2021
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.18283, -115.169209
longitude: -115.169209
existing_portables:
school: Twin Lakes Elementary School
level: ES
category: Phased replacement
marker: orange_circle
description: Phase 1 is completed
cumulative_total:
estimated_cost:
target_year: Phase 2 is in 2021
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.18424, -115.186148
longitude: -115.186148
existing_portables:
school: Boulder City High School
level: HS
category: Phased replacement
marker: orange_circle
description: Phase 1 is completed and phase 2 is in progress in the 2017 school year
cumulative_total:
estimated_cost:
target_year: Phase 3 and 4 are in 2018
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 35.978222, -114.834512
longitude: -114.834512
existing_portables:
school: Elementary school at Lamb and Kell
level: ES
category: New school in the city of North Las Vegas
marker: ylw_circle
description: Planned relief schools: Lincoln and Craig
cumulative_total:
estimated_cost:
target_year: Opening 2017-18 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.1916193, -115.0808426
longitude: -115.0808426
existing_portables:
school: Elementary school at La Madre and Lawrence
level: ES
category: New school in the city of North Las Vegas
marker: ylw_circle
description: Planned relief schools: Elizondo, Scott and Watson
cumulative_total:
estimated_cost:
target_year: Opening 2019-20 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.2505999, -115.1235352
longitude: -115.1235352
existing_portables:
school: Elementary school at Antelope Ridge
level: ES
category: New school in the city of Las Vegas
marker: ylw_circle
description: Planned relief schools: Bell
cumulative_total:
estimated_cost:
target_year: Opening 2017-18 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.1760851, -115.3681532
longitude: -115.3681532
existing_portables:
school: Elementary school at Farm and Jensen
level: ES
category: New school in the city of Las Vegas
marker: ylw_circle
description: Planned relief schools: Bozarth, Thompson, Darnell
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.2987737, -115.3152937
longitude: -115.3152937
existing_portables:
school: Elementary school at Galleria and Dave Wood Circle
level: ES
category: New school in Henderson
marker: ylw_circle
description: Planned relief schools: Sewell, Hinman, Treem and Thorpe
cumulative_total:
estimated_cost:
target_year: Opening 2017-18 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.0851222, -114.9617513
longitude: -114.9617513
existing_portables:
school: Elementary school at Beltrada and Via Italia
level: ES
category: New school in Henderson
marker: ylw_circle
description: Planned relief schools: Wallin, Wolff, Schorr
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 35.949085, -115.1290744
longitude: -115.1290744
existing_portables:
school: Elementary school at Chapata and Cassady Hollow
level: ES
category: New school in Henderson
marker: ylw_circle
description: Planned relief schools: Vanderburg, Twitchell, Kesterson
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.0267337, -115.04445
longitude: -115.04445
existing_portables:
school: Elementary school East of Treem and Thorpe (site acquisition pending)
level: ES
category: New school in Henderson
marker: ylw_circle
description: Planned relief schools: Treem, Thorpe, Hinman and Galleria and Dave Wood
cumulative_total:
estimated_cost:
target_year: Opening 2019-20 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.0761979, -115.0590101
longitude: -115.0590101
existing_portables:
school: Elementary school at Maule and Grand Canyon
level: ES
category: New school in Clark County
marker: ylw_circle
description: Planned relief schools: Tanaka and Batterman
cumulative_total:
estimated_cost:
target_year: Opening 2017-18 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.062788, -115.3242717
longitude: -115.3242717
existing_portables:
school: Elementary school at Arville and Mesa Verde
level: ES
category: New school in Clark County
marker: ylw_circle
description: Planned relief schools: Ries, Fine, Wiener and Hill
cumulative_total:
estimated_cost:
target_year: Opening 2017-18 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.0430326,-115.1941881
longitude: -115.1941881
existing_portables:
school: Elementary school at Chartan and Pioneer
level: ES
category: New school in Clark County
marker: ylw_circle
description: Planned relief schools: Reedom and Wright
cumulative_total:
estimated_cost:
target_year: Opening 2017-18 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 35.9876971, -115.2591726
longitude: -115.2591726
existing_portables:
school: Elementary school at Spencer and Pyle
level: ES
category: New school in Clark County
marker: ylw_circle
description: Planned relief schools: Schorr, Bass, Hummel, Cartwright, Beatty, Roberts
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.005447,-115.1264497
longitude: -115.1300291
existing_portables:
school: Elementary school at Dean Martin and I-15
level: ES
category: New school in Clark County
marker: ylw_circle
description: Planned relief schools: Ries, Frias, Stuckey
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.0458295, -115.19011
longitude: -115.19011
existing_portables:
school: Elementary school at Ford and Riley
level: ES
category: New school in Clark County
marker: ylw_circle
description: Planned relief schools: Forbuss, Steele, Fine
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.0299067, -115.2878147
longitude: -115.2878147
existing_portables:
school: Elementary school at El Capitan and Gomer
level: ES
category: New school in Clark County
marker: ylw_circle
description: Wright
cumulative_total:
estimated_cost:
target_year: Opening 2019-20 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.0101509, -115.2912615
longitude: -115.2912615
existing_portables:
school: Elementary school at Vegas Valley and Hollywood
level: ES
category: New school in Clark County
marker: ylw_circle
description: Planned relief schools: Iverson, Hal Smith and Mendoza
cumulative_total:
estimated_cost:
target_year: Opening 2019-20 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.1381251,-115.0353129
longitude: -115.0353129
existing_portables:
school: Elementary school at Tompkins and El Conquistador
level: ES
category: New school in Clark County
marker: ylw_circle
description: Planned relief schools: Batterman, Rogers and Hayes
cumulative_total:
estimated_cost:
target_year: Opening 2019-20 school year
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude:
longitude:
existing_portables:
school: Chaparral High School
level: HS
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component Replacement
cumulative_total: 37,045,000
estimated_cost: 11,900,000
target_year: Available funds 2015-17
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.12031, -115.085724
longitude: -115.085724
existing_portables:
school: Las Vegas Academy High School
level: HS
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC, Roof, LAN, Electrical, Low Voltage
cumulative_total: 131,785,000
estimated_cost: 25,410,000
target_year: Available funds 2017-19
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.164882, -115.139375
longitude: -115.139375
existing_portables:
school: Palo Verde High School
level: HS
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component and Roof Replacement
cumulative_total: 89,715,000
estimated_cost: 11,400,000
target_year: Available funds 2017-19
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.171999, -115.334707
longitude: -115.334707
existing_portables:
school: Bonanza High School
level: HS
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component and Roof Replacement
cumulative_total: 106,375,000
estimated_cost: 11,100,000
target_year: Available funds 2017-19
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.153561, -115.236683
longitude: -115.236683
existing_portables:
school: Cartwright Elementary School
level: ES
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component Replacement
cumulative_total: 95,275,000
estimated_cost: 2,795,000
target_year: Available funds 2017-19
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.015996, -115.139953
longitude: -115.139953
existing_portables:
school: Cambeiro Elementary School
level: ES
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component and Roof Replacement
cumulative_total: 92,480,000
estimated_cost: 2,765,000
target_year: Available funds 2017-19
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.178426, -115.110856
longitude: -115.110856
existing_portables:
school: Lyon Middle School
level: MS
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component Replacement
cumulative_total: 133,905,000
estimated_cost: 2,120,000
target_year: Available funds 2017-19
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.584875, -114.447239
longitude: -114.447239
existing_portables:
school: Moapa Valley High School
level: HS
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component and Roof Replacement
cumulative_total: 158,410,000
estimated_cost: 13,500,000
target_year: Available funds 2019-20
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.584971, -114.459613
longitude: -114.459613
existing_portables:
school: Desert Pines High School
level: HS
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component and Roof Replacement
cumulative_total: 189,195,000
estimated_cost: 10,590,000
target_year: Available funds 2019-20
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.178238, -115.092901
longitude: -115.092901
existing_portables:
school: Eldorado High School
level: HS
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component and Roof Replacement
cumulative_total: 144,910,000
estimated_cost: 9,870,000
target_year: Available funds 2019-20
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.180364, -115.048421
longitude: -115.048421
existing_portables:
school: Garside Middle School
level: MS
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component and Roof Replacement
cumulative_total: 166,110,000
estimated_cost: 7,700,000
target_year: Available funds 2019-20
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.169222, -115.234206
longitude: -115.234206
existing_portables:
school: Keller Middle School
level: MS
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component and Roof Replacement
cumulative_total: 178,605,000
estimated_cost: 7,085,000
target_year: Available funds 2019-20
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.165077, -115.036437
longitude: -115.036437
existing_portables:
school: Gibson Middle School
level: MS
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component and Roof Replacement
cumulative_total: 196,410,000
estimated_cost: 6,135,000
target_year: Available funds 2019-20
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.182265, -115.196562
longitude: -115.196562
existing_portables:
school: Richard Bryan Elementary School
level: ES
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component and Roof Replacement
cumulative_total: 168,885,000
estimated_cost: 2,775,000
target_year: Available funds 2019-20
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.194298, -115.268148
longitude: -115.268148
existing_portables:
school: Robison Middle School
level: MS
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component Replacement
cumulative_total: 171,520,000
estimated_cost: 2,635,000
target_year: Available funds 2019-20
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.178683, -115.070172
longitude: -115.070172
existing_portables:
school: Keller Elementary School
level: ES
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component
cumulative_total: 198,280,000
estimated_cost: 1,400,000
target_year: Available funds 2019-20
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.169539, -115.054332
longitude: -115.054332
existing_portables:
school: McCall Elementary School
level: ES
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component Replacement
cumulative_total: 135,040,000
estimated_cost: 1,135,000
target_year: Available funds 2019-20
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.204036, -115.130712
longitude: -115.130712
existing_portables:
school: Hancock Elementary School
level: ES
category: Mechanical system upgrades
marker: ltblu_circle
description: HVAC Component Replacement
cumulative_total: 190,275,000
estimated_cost: 1,080,000
target_year: Available funds 2019-20
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.152643, -115.215625
longitude: -115.215625
existing_portables:
school: Las Vegas High School
level: HS
category: Mechanical system upgrades
marker: ltblu_circle
description: Boilers
cumulative_total: 196,880,000
estimated_cost: 470,000
target_year: Available funds 2019-20
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.146395, -115.03139
longitude: -115.03139
existing_portables:
school: Fyfe Elementary School
level: ES
category: Closure
marker: red_circle
description: Built in 1963
cumulative_total:
estimated_cost:
target_year:
classroom_addition:
current_rooms:
program_capacity:
total_enrolled:
latitude: 36.177357, -115.194915
longitude: -115.194915
existing_portables:
school: Tate Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition: 18 and a multipurpose room
current_rooms: 36
program_capacity: 509
total_enrolled: 826
latitude: 36.20407, -115.084706
longitude: -115.084706
existing_portables: 14
school: Bonner Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition: 22
current_rooms: 31
program_capacity: 584
total_enrolled: 883
latitude: 36.18105, -115.323783
longitude: -115.323783
existing_portables: 17
school: Crestwood Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition: 22
current_rooms: 31
program_capacity: 437
total_enrolled: 703
latitude: 36.154797, -115.12801
longitude: -115.12801
existing_portables: 10
school: Cunningham Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition: 18
current_rooms: 35
program_capacity: 532
total_enrolled: 840
latitude: 36.113792, -115.052571
longitude: -115.052571
existing_portables: 14
school: Detwiler Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition: 14
current_rooms: 531
program_capacity: 514
total_enrolled: 782
latitude: 36.194718, -115.180696
longitude: -115.180696
existing_portables: 10
school: Fong Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition: 18
current_rooms: 34
program_capacity: 494
total_enrolled: 873
latitude: 36.200546, -115.236411
longitude: -115.236411
existing_portables: 17
school: Harris Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition: 18 and a multipurpose room
current_rooms: 36
program_capacity: 514
total_enrolled: 722
latitude: 36.123474, -115.090927
longitude: -115.090927
existing_portables: 10
school: Hewetson Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition: 14
current_rooms: 40
program_capacity: 633
total_enrolled: 1002
latitude: 36.176503, -115.122417
longitude: -115.122417
existing_portables: 19
school: Lowman Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition: 22
current_rooms: 32
program_capacity: 525
total_enrolled: 887
latitude: 36.237285, -115.066686
longitude: -115.066686
existing_portables: 17
school: Squires Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition: 14
current_rooms: 37
program_capacity: 530
total_enrolled: 736
latitude: 36.192687, -115.122316
longitude: -115.122316
existing_portables: 13
school: Beckley Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Mid-year 2017-18
classroom_addition: 18
current_rooms: 36
program_capacity: 561
total_enrolled: 903
latitude: 36.131623, -115.100104
longitude: -115.100104
existing_portables: 19
school: Clyde Cox Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Mid-year 2017-18
classroom_addition: 22
current_rooms: 33
program_capacity: 492
total_enrolled: 790
latitude: 36.230556, -115.095199
longitude: -115.095199
existing_portables: 22
school: Craig Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Mid-year 2017-18
classroom_addition: 14
current_rooms: 37
program_capacity: 519
total_enrolled: 794
latitude: 36.224047, -115.113353
longitude: -115.113353
existing_portables: 17
school: Culley Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Mid-year 2017-18
classroom_addition: 18
current_rooms: 36
program_capacity: 570
total_enrolled: 864
latitude: 36.183818, -115.221401
longitude: -115.221401
existing_portables: 18
school: Dearing Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Mid-year 2017-18
classroom_addition: 18
current_rooms: 36
program_capacity: 530
total_enrolled: 840
latitude: 36.134653, -115.078412
longitude: -115.078412
existing_portables: 18
school: Dondero Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Mid-year 2017-18
classroom_addition: 14 and a multipurpose room
current_rooms: 34
program_capacity: 523
total_enrolled: 801
latitude: 36.108054, -115.228311
longitude: -115.228311
existing_portables: 9
school: Herr Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Mid-year 2017-18
classroom_addition: 14
current_rooms: 38
program_capacity: 526
total_enrolled: 721
latitude: 36.20193, -115.031997
longitude: -115.031997
existing_portables: 11
school: Lake Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Mid-year 2017-18
classroom_addition: 14
current_rooms: 38
program_capacity: 516
total_enrolled: 889
latitude: 36.139273, -115.12868
longitude: -115.12868
existing_portables: 20
school: Long Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Mid-year 2017-18
classroom_addition: 22
current_rooms: 32
program_capacity: 413
total_enrolled: 848
latitude: 36.150061, -115.088754
longitude: -115.088754
existing_portables: 21
school: Ronzone Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Mid-year 2017-18
classroom_addition: 18
current_rooms: 36
program_capacity: 535
total_enrolled: 952
latitude: 36.196786, -115.217734
longitude: -115.217734
existing_portables:
school: Hal Smith Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Mid-year 2017-18
classroom_addition: 22
current_rooms: 31
program_capacity: 535
total_enrolled: 936
latitude: 36.130508, -115.062865
longitude: -115.062865
existing_portables: 16
school: Woolley Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Mid-year 2017-18
classroom_addition: 22
current_rooms: 31
program_capacity: 407
total_enrolled: 792
latitude: 36.231462,-115.094626
longitude: -115.094626
existing_portables:
school: Wynn Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Mid-year 2017-18
classroom_addition: 18
current_rooms: 32
program_capacity: 459
total_enrolled: 871
latitude: 36.13592,-115.219241
longitude: -115.219241
existing_portables:
school: Bunker Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition: 22
current_rooms: 31
program_capacity: 537
total_enrolled: 843
latitude: 36.21166, -115.232964
longitude: -115.232964
existing_portables: 10
school: Edwards Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition: 18 and a multipurpose room
current_rooms: 34
program_capacity: 492
total_enrolled: 819
latitude: 36.170912, -115.074663
longitude: -115.074663
existing_portables: 9
school: Katz Elementary School
level: ES
category: Classroom additions
marker: grn_circle
description:
cumulative_total:
estimated_cost:
target_year: Opening 2018-19 school year
classroom_addition: 18
current_rooms: 32
program_capacity: 474
total_enrolled: 741
latitude: 36.191344, -115.247892
longitude: -115.247892
existing_portables: 12