incident year: 2013 site location name: Forcados Terminal SPM2 at Ogulagha estimated quantity spilled: 1 estimated spill area: latitude: 3.6669277 longitude: 7.3278809 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: terrain: Water delay: |
incident year: 2011 site location name: Cawthorne Channel Well 21L Flowline estimated quantity spilled: 2 estimated spill area: 0.000029 latitude: 4.554172 longitude: 7.010778 cause: sabotage cause detail: cleanup / recovery duratiom: 20 terrain: Swamp delay: |
incident year: 2011 site location name: 28' Trans Niger Pipeline at Bodo Creek estimated quantity spilled: 233 estimated spill area: 0.001115 latitude: 4.591639 longitude: 7.257083 cause: sabotage cause detail: cleanup / recovery duratiom: 12 terrain: Swamp delay: |
incident year: 2011 site location name: Ubie Well 9S Flowline at Ubie estimated quantity spilled: 399 estimated spill area: 0.0005 latitude: 5.111833 longitude: 6.540083 cause: sabotage cause detail: cleanup / recovery duratiom: 41 terrain: Land delay: |
incident year: 2011 site location name: 28' Trans Niger Pipeline at Bodo estimated quantity spilled: 118.4 estimated spill area: 0.007944 latitude: 4.594639 longitude: 7.257556 cause: sabotage cause detail: cleanup / recovery duratiom: 11 terrain: Swamp / Water delay: |
incident year: 2011 site location name: Nun River Well 15 Flowline at Nun River estimated quantity spilled: 8.6 estimated spill area: 0.000436 latitude: 4.786056 longitude: 6.080639 cause: sabotage cause detail: cleanup / recovery duratiom: 40 terrain: Swamp / Land delay: |
incident year: 2011 site location name: 28' Bomu-Bonny Pipeline at BodoWest estimated quantity spilled: 100.2 estimated spill area: 0.0062 latitude: 4.573139 longitude: 7.253833 cause: sabotage cause detail: cleanup / recovery duratiom: 15 terrain: Swamp / Water delay: |
incident year: 2011 site location name: 24' Bomu-Bonny Pipeline at Moghor estimated quantity spilled: 78 estimated spill area: 0.000024 latitude: 4.648806 longitude: 7.277278 cause: sabotage cause detail: cleanup / recovery duratiom: 30 terrain: Land delay: |
incident year: 2011 site location name: 28' Bomu-Bonny Pipeline at BodoWest estimated quantity spilled: 77 estimated spill area: 0.006833 latitude: 4.602167 longitude: 7.2585 cause: sabotage cause detail: cleanup / recovery duratiom: 17 terrain: Swamp delay: |
incident year: 2011 site location name: 20' KoloCreek-Rumuekpe Pipeline at Ogbogolo estimated quantity spilled: 67.5 estimated spill area: 0.067917 latitude: 4.947222 longitude: 6.558194 cause: sabotage cause detail: cleanup / recovery duratiom: 252 terrain: Land delay: security |
incident year: 2011 site location name: 24' Bomu-Bonny Pipeline at K-Dere estimated quantity spilled: 144.6 estimated spill area: 0.0005 latitude: 4.659111 longitude: 7.276556 cause: sabotage cause detail: cleanup / recovery duratiom: 125 terrain: Land delay: community |
incident year: 2011 site location name: 24'/28' Trans Niger Pipeline at BodoWest estimated quantity spilled: 162.1 estimated spill area: 0.013661 latitude: 4.564528 longitude: 7.252833 cause: sabotage cause detail: cleanup / recovery duratiom: 16 terrain: Swamp delay: |
incident year: 2011 site location name: 8' Obigbo North Pipeline at Umuare estimated quantity spilled: 1.2 estimated spill area: 0.000123 latitude: 4.851806 longitude: 7.124222 cause: sabotage cause detail: cleanup / recovery duratiom: 16 terrain: Land delay: |
incident year: 2012 site location name: SPM 3 Bonny Crude Loading Platform Offshore estimated quantity spilled: 14 estimated spill area: latitude: 4.109444 longitude: 7.125833 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: terrain: Water delay: |
incident year: 2011 site location name: 28' and 24' Bomu-Bonny Pipelines at BodoWest estimated quantity spilled: 165.1 estimated spill area: 0.008653 latitude: 4.597083 longitude: 7.257806 cause: sabotage cause detail: cleanup / recovery duratiom: 12 terrain: Swamp delay: |
incident year: 2011 site location name: Adibawa North East Well 4L Flowline at Biseni estimated quantity spilled: 429 estimated spill area: 0.0012 latitude: 5.255361 longitude: 6.523694 cause: sabotage cause detail: cleanup / recovery duratiom: 34 terrain: Land delay: |
incident year: 2011 site location name: 12' Imo 2 - Ogale Pipeline at Owaza estimated quantity spilled: 4.7 estimated spill area: 0.0034 latitude: 4.980222 longitude: 7.175667 cause: sabotage cause detail: cleanup / recovery duratiom: 23 terrain: Land delay: |
incident year: 2012 site location name: Oroni Well-1 Flowline at Okpole-Enwhen estimated quantity spilled: 0.1 estimated spill area: latitude: 4.170556 longitude: 6.133083 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 102 terrain: Land delay: |
incident year: 2011 site location name: KoloCreek Well 21T flowline at KoloCreek estimated quantity spilled: 3 estimated spill area: 0.000242 latitude: 4.893306 longitude: 6.380333 cause: sabotage cause detail: cleanup / recovery duratiom: 15 terrain: Swamp delay: |
incident year: 2011 site location name: 18' Assa - Rumuekpe Pipeline at Egbeda estimated quantity spilled: 5 estimated spill area: 0.0003 latitude: 5.230944 longitude: 6.767861 cause: sabotage cause detail: cleanup / recovery duratiom: 63 terrain: Land delay: |
incident year: 2011 site location name: Apara Well 3 Location at Apara. estimated quantity spilled: 1.5 estimated spill area: 0.0002 latitude: 4.834306 longitude: 6.999583 cause: sabotage cause detail: cleanup / recovery duratiom: 2 terrain: Land delay: |
incident year: 2011 site location name: 12' Imo River Pipeline at Owaza estimated quantity spilled: 26.5 estimated spill area: 0.0006 latitude: 4.980639 longitude: 7.174639 cause: sabotage cause detail: cleanup / recovery duratiom: 7 terrain: Land delay: |
incident year: 2011 site location name: 36' Rumuekpe - Nkpoku Pipeline at Rumuekpe estimated quantity spilled: 7 estimated spill area: 0.001283 latitude: 4.977833 longitude: 6.698778 cause: sabotage cause detail: cleanup / recovery duratiom: 22 terrain: Land delay: |
incident year: 2011 site location name: 18' Assa - Rumuekpe Pipeline @ Egbeda estimated quantity spilled: 2.6 estimated spill area: 0.0006 latitude: 5.225889 longitude: 6.766694 cause: sabotage cause detail: cleanup / recovery duratiom: 54 terrain: Land delay: |
incident year: 2012 site location name: Bonny Terminal Crude Loading Platform at Bonny estimated quantity spilled: 20 estimated spill area: latitude: 4.201889 longitude: 7.275972 cause: operational cause detail: (operational and maintenance error ) cleanup / recovery duratiom: terrain: Water delay: |
incident year: 2011 site location name: 12' Imo River 1 Ogale Pipeline at Owaza estimated quantity spilled: 4.5 estimated spill area: 0.0005 latitude: 4.951722 longitude: 7.184917 cause: sabotage cause detail: cleanup / recovery duratiom: 35 terrain: Land delay: |
incident year: 2011 site location name: 24' Bomu-Bonny Pipeline at & Bodo / Mogho estimated quantity spilled: 15 estimated spill area: 0.0029 latitude: 4.639 longitude: 7.277861 cause: sabotage cause detail: cleanup / recovery duratiom: 17 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2011 site location name: 28' Bomu-Bonny Pipeline at Bodo / Mogho estimated quantity spilled: 16 estimated spill area: 0.0029 latitude: 4.645778 longitude: 7.277528 cause: sabotage cause detail: cleanup / recovery duratiom: 17 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2011 site location name: 24' Nkpoku - Bomu Pipeline at Biara estimated quantity spilled: 195 estimated spill area: 0.0003 latitude: 4.703556 longitude: 7.279556 cause: sabotage cause detail: cleanup / recovery duratiom: 16 terrain: Land delay: |
incident year: 2011 site location name: 24' Nkpoku - Bomu Pipeline at Bera estimated quantity spilled: 31 estimated spill area: 0.0027 latitude: 4.6859728 longitude: 7.27775 cause: sabotage cause detail: cleanup / recovery duratiom: 17 terrain: Land delay: |
incident year: 2011 site location name: Obigbo Well 28 Flowline at Obigbo estimated quantity spilled: 5.2 estimated spill area: 0.0001 latitude: 4.911889 longitude: 7.088833 cause: sabotage cause detail: cleanup / recovery duratiom: 19 terrain: Land delay: |
incident year: 2011 site location name: 6' Imo River Well 59 Flowline at Well Head estimated quantity spilled: 9.2 estimated spill area: 0.000707 latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: 126 terrain: Land delay: |
incident year: 2011 site location name: 12' Imo River 1 Pipeline at Owaza estimated quantity spilled: 6 estimated spill area: 0.0015 latitude: 4.946417 longitude: 7.184722 cause: sabotage cause detail: cleanup / recovery duratiom: 29 terrain: Land delay: |
incident year: 2011 site location name: Imo River Well 55 S Flowline at Igiriukwu estimated quantity spilled: 3 estimated spill area: 0.006 latitude: 4.9905 longitude: 7.182444 cause: sabotage cause detail: cleanup / recovery duratiom: 46 terrain: Land delay: |
incident year: 2014 site location name: 6' Belema Pipeline at Belema estimated quantity spilled: 0.8 estimated spill area: 0.0025 latitude: 4.4014167 longitude: 6.6491389 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 288 terrain: Water delay: contracting |
incident year: 2011 site location name: 36' Rumuekpe-Nkpoku Pipeline at Aluu estimated quantity spilled: 7 estimated spill area: 0.0011 latitude: 4.949028 longitude: 6.940472 cause: sabotage cause detail: cleanup / recovery duratiom: 34 terrain: Land delay: |
incident year: 2011 site location name: 14' Okordia-Rumuekpe Pipeline and Akalamini Riser at Akalamini estimated quantity spilled: 4.68 estimated spill area: 0.00458 latitude: 5.120222 longitude: 6.483083 cause: sabotage cause detail: cleanup / recovery duratiom: 8 terrain: Land delay: |
incident year: 2012 site location name: Nembe 1 Flow Line at Nembe Creek estimated quantity spilled: 16 estimated spill area: latitude: 4.4335 longitude: 6.323472 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 99 terrain: Swamp delay: community |
incident year: 2011 site location name: 20' KoloCreek-Rumuekpe Pipeline at Ogbogolo estimated quantity spilled: 4387.3 estimated spill area: 0.033882 latitude: 4.946889 longitude: 6.554806 cause: sabotage cause detail: cleanup / recovery duratiom: 278 terrain: Swamp / Land delay: other (terrain, floods, ...) |
incident year: 2014 site location name: Nembe 1 Well 23T Flowline at Nembe Creek estimated quantity spilled: 180 estimated spill area: 0.002 latitude: 4.4356944 longitude: 6.322 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 160 terrain: Swamp delay: community |
incident year: 2011 site location name: 12' Imo River 2 Manifold at Odagwa estimated quantity spilled: 164.2 estimated spill area: 0.001 latitude: 4.981222 longitude: 7.169917 cause: sabotage cause detail: cleanup / recovery duratiom: 65 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2012 site location name: Nembe 1 Well 19S Wellhead at Ogbolomabiri estimated quantity spilled: 0.8 estimated spill area: latitude: 4.436972 longitude: 6.318 cause: operational cause detail: (operational and maintenance error ) cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2011 site location name: 10' Diebu Creek - Nun River Pipeline at Onyioma estimated quantity spilled: 197.1 estimated spill area: 0.13 latitude: 4.746806 longitude: 6.102167 cause: sabotage cause detail: cleanup / recovery duratiom: 131 terrain: Swamp delay: |
incident year: 2011 site location name: Chokota Gathering Manifold; Igbo Etche; Obigbo estimated quantity spilled: 26.7 estimated spill area: 0.0061 latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: 44 terrain: Land delay: |
incident year: 2011 site location name: 20''Ughelli Pumping Station -Warri Refinery Pipeline at Ekpan estimated quantity spilled: 6.85 estimated spill area: latitude: 5.573278 longitude: 5.723028 cause: sabotage cause detail: cleanup / recovery duratiom: 27 terrain: Land delay: |
incident year: 2011 site location name: Nembe Well 20L at Nembe Creek estimated quantity spilled: 22 estimated spill area: 0.0254 latitude: 4.451806 longitude: 6.328083 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 151 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2011 site location name: 12' Imo River - Ogale Pipeline at KomKom estimated quantity spilled: 49.5 estimated spill area: 27 latitude: 4.878083 longitude: 7.172611 cause: sabotage cause detail: cleanup / recovery duratiom: 27 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2011 site location name: 8' Isimiri Pipeline at Umuaghala estimated quantity spilled: 303.5 estimated spill area: 0.0084 latitude: 4.876806 longitude: 7.236944 cause: sabotage cause detail: cleanup / recovery duratiom: 188 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2011 site location name: Nembe Creek 2 Flow Station at Nembe estimated quantity spilled: 78.1 estimated spill area: 0 latitude: 4.453528 longitude: 6.324167 cause: operational cause detail: (operational and maintenance error ) cleanup / recovery duratiom: terrain: Water delay: |
incident year: 2011 site location name: 24' Nembe Creek Pipeline at Tora estimated quantity spilled: 479.49 estimated spill area: 0.0413 latitude: 4.482389 longitude: 6.535167 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 131 terrain: Swamp delay: community |
incident year: 2011 site location name: 16' Egbema-Assa Pipeline at Ekpeagha estimated quantity spilled: 2 estimated spill area: 0.0006 latitude: 5.432556 longitude: 6.781056 cause: sabotage cause detail: cleanup / recovery duratiom: 10 terrain: Land delay: |
incident year: 2011 site location name: Bonny - Oloma Well 2L Flowline at Oloma estimated quantity spilled: 16 estimated spill area: latitude: 4.492833 longitude: 7.218861 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 144 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2011 site location name: Jones Creek Well Head 23S/L at Kokodiagbene estimated quantity spilled: 9.88 estimated spill area: latitude: 5.692472 longitude: 5.372028 cause: sabotage cause detail: cleanup / recovery duratiom: 66 terrain: Swamp delay: |
incident year: 2011 site location name: 18' Assa-Rumuekpe Pipeline at Elele-Amini estimated quantity spilled: 155 estimated spill area: 0.001 latitude: 5.097778 longitude: 6.722278 cause: sabotage cause detail: cleanup / recovery duratiom: 15 terrain: Land delay: |
incident year: 2011 site location name: 12' Adibawa-Okordia Pipeline at Ikarama estimated quantity spilled: 80.7 estimated spill area: 25 latitude: 5.167583 longitude: 6.472861 cause: sabotage cause detail: cleanup / recovery duratiom: 60 terrain: Land delay: |
incident year: 2011 site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama estimated quantity spilled: 127.8 estimated spill area: 15.5 latitude: 5.1465 longitude: 6.458944 cause: sabotage cause detail: cleanup / recovery duratiom: 52 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2013 site location name: Bonny Well 2S Flowline at Oloma estimated quantity spilled: 40 estimated spill area: latitude: 4.493389 longitude: 7.221472 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 102 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2011 site location name: 12' Imo River Pipeline at Uzuaku estimated quantity spilled: 724.6 estimated spill area: 0.0012 latitude: 4.917722 longitude: 7.184444 cause: sabotage cause detail: cleanup / recovery duratiom: 107 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2011 site location name: Imo River 3 Well 1 Flowline at Ipu-West estimated quantity spilled: 11.3 estimated spill area: 0.005 latitude: 4.975833 longitude: 7.195306 cause: sabotage cause detail: cleanup / recovery duratiom: 28 terrain: Land delay: |
incident year: 2012 site location name: 24' Alakiri - Bonny Pipeline (GPHSL) at Fusokiri / Ilomatoru estimated quantity spilled: 9.5 estimated spill area: 0.0098 latitude: 4.500333 longitude: 7.11975 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 383 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2014 site location name: Old 24' Nembe Creek Pipeline at Luckyland estimated quantity spilled: 1 estimated spill area: latitude: 4.5054444 longitude: 6.6814722 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 195 terrain: Swamp delay: |
incident year: 2011 site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama estimated quantity spilled: 64.3 estimated spill area: latitude: 5.141528 longitude: 6.463278 cause: sabotage cause detail: cleanup / recovery duratiom: 61 terrain: Land delay: |
incident year: 2011 site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama estimated quantity spilled: 128.6 estimated spill area: 0.0085 latitude: 5.153389 longitude: 6.453 cause: sabotage cause detail: cleanup / recovery duratiom: 101 terrain: Land delay: community |
incident year: 2012 site location name: 10' Ekulama 2 Pipeline at Sanbarth estimated quantity spilled: 13 estimated spill area: 0.0146 latitude: 4.505472 longitude: 6.687944 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 121 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2011 site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama estimated quantity spilled: 85.9 estimated spill area: latitude: 5.135333 longitude: 6.472861 cause: sabotage cause detail: cleanup / recovery duratiom: 62 terrain: Land delay: |
incident year: 2011 site location name: 12' Adibawa-Okordia Pipeline at Ikarama estimated quantity spilled: 120 estimated spill area: 0.0015 latitude: 5.167306 longitude: 6.472556 cause: sabotage cause detail: cleanup / recovery duratiom: 43 terrain: Land delay: |
incident year: 2011 site location name: Cawthorne Channel Well 43S Flowline at Cawthorne Channel estimated quantity spilled: 1.8 estimated spill area: 0.0007 latitude: 4.550833 longitude: 6.975556 cause: sabotage cause detail: cleanup / recovery duratiom: 30 terrain: Swamp delay: |
incident year: 2011 site location name: 12' Egbema-Oguta Pipeline at Eziosu estimated quantity spilled: 0.3 estimated spill area: 0.0001 latitude: 5.644631 longitude: 6.753333 cause: sabotage cause detail: cleanup / recovery duratiom: 5 terrain: Land delay: |
incident year: 2011 site location name: Nun River Well 15 Flowline at Onyonma estimated quantity spilled: 3.5 estimated spill area: 0.006858 latitude: 4.786056 longitude: 6.080656 cause: sabotage cause detail: cleanup / recovery duratiom: 101 terrain: Swamp delay: community |
incident year: 2011 site location name: 28'' Trans Forcados Pipeline at Batan axis estimated quantity spilled: 134.28 estimated spill area: latitude: 5.544222 longitude: 5.515889 cause: sabotage cause detail: cleanup / recovery duratiom: 153 terrain: Swamp delay: |
incident year: 2011 site location name: 6' Obigbo - North Pipeline at Ogale estimated quantity spilled: 1.73 estimated spill area: 0.0007 latitude: 4.822139 longitude: 7.1545 cause: sabotage cause detail: cleanup / recovery duratiom: 51 terrain: Land delay: |
incident year: 2011 site location name: 8' Umuechem - Nkpoku Pipeline at Igwuruta estimated quantity spilled: 3.26 estimated spill area: 0.0012 latitude: 4.981722 longitude: 7.024097 cause: sabotage cause detail: cleanup / recovery duratiom: 104 terrain: Land delay: |
incident year: 2011 site location name: 4' Imo River 1 Well 30 S Flowline at Igiriukwu estimated quantity spilled: 6.6 estimated spill area: 0.000506 latitude: 4.9845 longitude: 7.178583 cause: sabotage cause detail: cleanup / recovery duratiom: 20 terrain: Land delay: |
incident year: 2011 site location name: 20” Buguma–Alakiri Trunk line at Bakana estimated quantity spilled: 52.5 estimated spill area: latitude: 4.582889 longitude: 6.956861 cause: sabotage cause detail: cleanup / recovery duratiom: 7 terrain: Swamp delay: community |
incident year: 2012 site location name: 10' Ekulama 2 Pipeline at Sanbarth / Luckyland estimated quantity spilled: 5.5 estimated spill area: latitude: 4.506306 longitude: 6.687417 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 70 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2011 site location name: 24' Alakiri-Bonny Pipeline at Illomatoru estimated quantity spilled: 152 estimated spill area: 0.1611 latitude: 4.527389 longitude: 7.094111 cause: sabotage cause detail: cleanup / recovery duratiom: 111 terrain: Swamp delay: |
incident year: 2011 site location name: 12' Adibawa-Okordia Pipeline at Ikarama estimated quantity spilled: 30 estimated spill area: latitude: 5.157444 longitude: 6.460056 cause: sabotage cause detail: cleanup / recovery duratiom: 113 terrain: Land delay: |
incident year: 2011 site location name: 6' Obigbo North - Ogale Pipeline at Ogale estimated quantity spilled: 24.88 estimated spill area: 0.0009 latitude: 4.828972 longitude: 7.155306 cause: sabotage cause detail: cleanup / recovery duratiom: 29 terrain: Land delay: |
incident year: 2011 site location name: 10'' Ogini-Eriemu delivery line at Ovrode estimated quantity spilled: 1 estimated spill area: latitude: 5.571583 longitude: 6.299889 cause: sabotage cause detail: cleanup / recovery duratiom: 6 terrain: Land delay: |
incident year: 2011 site location name: 10' Ekulama-Sanbarth Pipeline at Sanbarth estimated quantity spilled: 0.93 estimated spill area: 0.0007 latitude: 4.506333 longitude: 6.68775 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 67 terrain: Swamp delay: community |
incident year: 2011 site location name: 6' Obigbo North - OgalePipeline at Ogale estimated quantity spilled: 6.8 estimated spill area: 0.0002 latitude: 4.835636 longitude: 7.156089 cause: sabotage cause detail: cleanup / recovery duratiom: 17 terrain: Land delay: |
incident year: 2011 site location name: 14' Okordia - Rumuekpe Trunkline at Ikarama estimated quantity spilled: 84.7 estimated spill area: 0.0117 latitude: 5.153194 longitude: 6.453056 cause: sabotage cause detail: cleanup / recovery duratiom: 126 terrain: Land delay: community |
incident year: 2011 site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama estimated quantity spilled: 91.9 estimated spill area: 0.0125 latitude: 5.138806 longitude: 6.465639 cause: sabotage cause detail: cleanup / recovery duratiom: 116 terrain: Land delay: |
incident year: 2013 site location name: 24' Alakiri - Bonny Pipeline (disused GPHSL) at Ilomatoru estimated quantity spilled: 41 estimated spill area: latitude: 4.518667 longitude: 7.106111 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 311 terrain: Swamp delay: |
incident year: 2011 site location name: 14' Okordia - Rumuekpe Pipeline at Ikarama estimated quantity spilled: 67.96 estimated spill area: 0.0009 latitude: 5.135361 longitude: 6.468833 cause: sabotage cause detail: cleanup / recovery duratiom: 57 terrain: Land delay: community |
incident year: 2011 site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama estimated quantity spilled: 68.7 estimated spill area: 0.0013 latitude: 5.136528 longitude: 6.467667 cause: sabotage cause detail: cleanup / recovery duratiom: 104 terrain: Land delay: |
incident year: 2014 site location name: 24' Nkpoku - Bomu Trans Niger Pipeline at Freetown estimated quantity spilled: 2 estimated spill area: 0.0006 latitude: 4.5192778 longitude: 7.2365278 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 291 terrain: Swamp delay: |
incident year: 2012 site location name: 24' Bomu - Bonny Trunkline at Freetown estimated quantity spilled: 7.7 estimated spill area: 0.0018 latitude: 4.519306 longitude: 7.236472 cause: operational cause detail: (sabotage) cleanup / recovery duratiom: 285 terrain: Swamp delay: community |
incident year: 2011 site location name: 12' Adibawa - Okordia Pipeline at Ikarama. estimated quantity spilled: 345.75 estimated spill area: 0.0006 latitude: 5.16575 longitude: 6.4705 cause: sabotage cause detail: cleanup / recovery duratiom: 67 terrain: Land delay: community |
incident year: 2011 site location name: 12' Imo River - Ogale Pipeline at Komkom estimated quantity spilled: 167.12 estimated spill area: latitude: 4.878806 longitude: 7.172556 cause: sabotage cause detail: cleanup / recovery duratiom: 132 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2011 site location name: Oroni Well 7S Flowline estimated quantity spilled: 9 estimated spill area: latitude: 5.355972 longitude: 6.166806 cause: sabotage cause detail: cleanup / recovery duratiom: 42 terrain: Land delay: |
incident year: 2011 site location name: 24' Nembe Creek Pipeline at Tora estimated quantity spilled: 245.2 estimated spill area: 1.0014 latitude: 4.476722 longitude: 6.477083 cause: sabotage cause detail: cleanup / recovery duratiom: 128 terrain: Swamp delay: |
incident year: 2012 site location name: 8' Cawthorne Channel II Pipeline at Tigerkiri estimated quantity spilled: 3.6 estimated spill area: 0.0054 latitude: 4.577278 longitude: 6.984472 cause: sabotage cause detail: cleanup / recovery duratiom: 32 terrain: Swamp delay: |
incident year: 2012 site location name: 36' Nkpoku - Bomu Pipeline at Eneka estimated quantity spilled: 13 estimated spill area: 0.000057 latitude: 4.896639 longitude: 7.053583 cause: sabotage cause detail: cleanup / recovery duratiom: 23 terrain: Land delay: |
incident year: 2012 site location name: 8' Umuechem - Nkpoku Pipeline at Omunwei; Igwuruta estimated quantity spilled: 2.4 estimated spill area: 0.0012 latitude: 4.981694 longitude: 7.024139 cause: sabotage cause detail: cleanup / recovery duratiom: 14 terrain: Land delay: |
incident year: 2012 site location name: 16' Egbema-Assa Trunk line at Assa estimated quantity spilled: 4.7 estimated spill area: 0.0002 latitude: 5.380611 longitude: 6.796083 cause: sabotage cause detail: cleanup / recovery duratiom: 41 terrain: Land delay: |
incident year: 2012 site location name: Etelebou Well 11T at Etelebou estimated quantity spilled: 98.5 estimated spill area: 0.003 latitude: 5.005028 longitude: 6.368306 cause: sabotage cause detail: cleanup / recovery duratiom: 34 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2012 site location name: 6'Obigbo North Pipeline at Ogale estimated quantity spilled: 120 estimated spill area: 0.0017 latitude: 4.820361 longitude: 7.154222 cause: sabotage cause detail: cleanup / recovery duratiom: 42 terrain: Land delay: |
incident year: 2011 site location name: Awoba Well 5 L Flowline ROW at Awoba estimated quantity spilled: 2.6 estimated spill area: latitude: 4.525556 longitude: 6.826278 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 15 terrain: Swamp delay: |
incident year: 2012 site location name: 10'' Kokori-Eriemu Pipeline at Kokori estimated quantity spilled: 529.5 estimated spill area: latitude: 5.628972 longitude: 6.069556 cause: sabotage cause detail: cleanup / recovery duratiom: 103 terrain: Land delay: |
incident year: 2012 site location name: 12' Imo River 2 Pipeline at Owaza estimated quantity spilled: 2.1 estimated spill area: 0.001 latitude: 4.980694 longitude: 7.1745 cause: sabotage cause detail: cleanup / recovery duratiom: 33 terrain: Land delay: |
incident year: 2012 site location name: Ubie Well 9S flowline at Idu/Edrass estimated quantity spilled: 7.3 estimated spill area: latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: 47 terrain: Land delay: |
incident year: 2012 site location name: 6' Obigbo North - Ogale pipeline at Komkom estimated quantity spilled: 103.2 estimated spill area: latitude: 4.84575 longitude: 7.157333 cause: sabotage cause detail: cleanup / recovery duratiom: 23 terrain: Land delay: |
incident year: 2011 site location name: 10' Diebu creek Pipeline at Oporoma estimated quantity spilled: 3.2 estimated spill area: 0.0006 latitude: 4.843333 longitude: 6.128806 cause: sabotage cause detail: cleanup / recovery duratiom: 90 terrain: Swamp delay: |
incident year: 2011 site location name: 16' Nun-River - Kolo Creek Pipeline at Aguobiri estimated quantity spilled: 41.2 estimated spill area: 0.00124 latitude: 4.823806 longitude: 6.062917 cause: sabotage cause detail: cleanup / recovery duratiom: 135 terrain: Swamp delay: |
incident year: 2011 site location name: 10' Diebu creek Pipeline at Oporoma estimated quantity spilled: 103.7 estimated spill area: 0.0118 latitude: 4.800056 longitude: 6.108083 cause: sabotage cause detail: cleanup / recovery duratiom: 131 terrain: Swamp delay: |
incident year: 2012 site location name: 12' Oguta - Egbema Pipeline at Obiakpu estimated quantity spilled: 2025.6 estimated spill area: 0.0349 latitude: 5.573111 longitude: 6.76075 cause: sabotage cause detail: cleanup / recovery duratiom: 75 terrain: Land delay: |
incident year: 2014 site location name: 6” Awoba Flowstation - Manifold Pipeline at Awoba estimated quantity spilled: 2 estimated spill area: 0.0002 latitude: 4.5316389 longitude: 6.8197778 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 292 terrain: Swamp delay: |
incident year: 2012 site location name: 36' Rumuekpe - Nkpoku Pipeline at Omuigwe-Aluu estimated quantity spilled: 291.3 estimated spill area: 0.0111 latitude: 4.9435 longitude: 6.94075 cause: sabotage cause detail: cleanup / recovery duratiom: 65 terrain: Land delay: |
incident year: 2012 site location name: 36' Nkpoku - Bomu Trunkline at Agbonchia estimated quantity spilled: 156.8 estimated spill area: 0.0032 latitude: 4.83175 longitude: 7.129417 cause: sabotage cause detail: cleanup / recovery duratiom: 71 terrain: Land delay: |
incident year: 2012 site location name: 36' Rumuekpe - Nkpoku Trunkline at Mbodo-Aluu estimated quantity spilled: 52.8 estimated spill area: 0.006 latitude: 4.941442 longitude: 6.948065 cause: sabotage cause detail: cleanup / recovery duratiom: 54 terrain: Land delay: |
incident year: 2012 site location name: 8' Nkali pipeline at Odagwa estimated quantity spilled: 0.67 estimated spill area: 0.00007 latitude: 4.987306 longitude: 7.158944 cause: sabotage cause detail: cleanup / recovery duratiom: 41 terrain: Land delay: |
incident year: 2012 site location name: 8' Isimiri - Imo Gate delivery line at Isimiri. estimated quantity spilled: 14 estimated spill area: 0.001 latitude: 4.885806 longitude: 7.194667 cause: sabotage cause detail: cleanup / recovery duratiom: 38 terrain: Land delay: |
incident year: 2012 site location name: 28' Nkpoku -Bomu Pipeline at Aleto-Nchia-Eleme estimated quantity spilled: 2755 estimated spill area: 0.0041 latitude: 4.812417 longitude: 7.101528 cause: sabotage cause detail: cleanup / recovery duratiom: 86 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2012 site location name: 12' Kokori-Eriemu Delivery line at Oteri/Agbarha. estimated quantity spilled: 306.1 estimated spill area: latitude: 5.569667 longitude: 6.059972 cause: sabotage cause detail: cleanup / recovery duratiom: 39 terrain: Land delay: |
incident year: 2012 site location name: 24' Nkpoku - Bomu Trunkline at Bera estimated quantity spilled: 2.1 estimated spill area: 0.000003 latitude: 4.686028 longitude: 7.277722 cause: sabotage cause detail: cleanup / recovery duratiom: 129 terrain: Land delay: |
incident year: 2012 site location name: 8' Umuechem - Nkpoku delivery line at Umuechem estimated quantity spilled: 9.1 estimated spill area: 0.0007 latitude: 5.001944 longitude: 7.021194 cause: sabotage cause detail: cleanup / recovery duratiom: 36 terrain: Land delay: |
incident year: 2013 site location name: 6'' Awoba Pipeline at Awoba estimated quantity spilled: 5 estimated spill area: 0.0001 latitude: 4.5316389 longitude: 6.8200833 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 368 terrain: Swamp delay: |
incident year: 2012 site location name: 28' Nkpoku - Bomu Pipeline at B-Dere estimated quantity spilled: 112.2 estimated spill area: 0.0223 latitude: 4.691028 longitude: 7.254417 cause: sabotage cause detail: cleanup / recovery duratiom: 114 terrain: Land delay: |
incident year: 2011 site location name: Awoba Well 2T Flowline Riser at Awoba estimated quantity spilled: 0.13 estimated spill area: latitude: 4.531667 longitude: 6.81925 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2012 site location name: 12' Imo-River - Ogale Pipeilne at Owaza. estimated quantity spilled: 493.2 estimated spill area: 0.003 latitude: 4.95175 longitude: 7.184917 cause: sabotage cause detail: cleanup / recovery duratiom: 28 terrain: Land delay: |
incident year: 2012 site location name: KoloCreek Well 3T Flowline at Otuasega estimated quantity spilled: 3.9 estimated spill area: 0.0003 latitude: 4.89475 longitude: 6.367028 cause: sabotage cause detail: cleanup / recovery duratiom: 49 terrain: Land delay: |
incident year: 2012 site location name: 12' Imo-River - Ogale Pipeilne at Owaza. estimated quantity spilled: 0.52 estimated spill area: 0.0001 latitude: 4.980694 longitude: 7.174472 cause: sabotage cause detail: cleanup / recovery duratiom: 21 terrain: Land delay: |
incident year: 2012 site location name: 18' Assa - Rumuekpe Pipeline at Awara. estimated quantity spilled: 40.1 estimated spill area: 0.0005 latitude: 5.288389 longitude: 6.781278 cause: sabotage cause detail: cleanup / recovery duratiom: 14 terrain: Land delay: |
incident year: 2011 site location name: Awoba Well 8 T Flowline at Bille estimated quantity spilled: 0.5 estimated spill area: latitude: 4.531667 longitude: 6.819278 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2012 site location name: 16’’ Nun River-Kolocreek Trunkline at Angiama-Gbeni estimated quantity spilled: 74 estimated spill area: 0.0059 latitude: 4.819417 longitude: 6.133056 cause: sabotage cause detail: cleanup / recovery duratiom: 62 terrain: Swamp delay: |
incident year: 2011 site location name: 6' Awoba Pipeline at Awoba estimated quantity spilled: 0.001 estimated spill area: latitude: 4.532444 longitude: 6.819917 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2012 site location name: Oroni Well-1 Flowline at Enhwe estimated quantity spilled: 0.04 estimated spill area: latitude: 5.363556 longitude: 6.136444 cause: sabotage cause detail: cleanup / recovery duratiom: 31 terrain: Land delay: |
incident year: 2012 site location name: 12' Imo River 2 Pipeline at Odagwa estimated quantity spilled: 0.79 estimated spill area: 0.0002 latitude: 4.980806 longitude: 7.170944 cause: sabotage cause detail: cleanup / recovery duratiom: 8 terrain: Land delay: |
incident year: 2012 site location name: 24' Bomu - Bonny Trans Niger Pipeline at Mogho estimated quantity spilled: 67.9 estimated spill area: 0.0006 latitude: 4.645222 longitude: 7.2775 cause: sabotage cause detail: cleanup / recovery duratiom: 122 terrain: Land delay: |
incident year: 2011 site location name: 10' Pipeline at Ekulama estimated quantity spilled: 229 estimated spill area: latitude: 4.53335 longitude: 6.683361 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 96 terrain: Swamp delay: |
incident year: 2012 site location name: 4' Agbada II Well 48S Flowline at Omuohia estimated quantity spilled: 34.7 estimated spill area: 0.0003 latitude: 4.938306 longitude: 7.009444 cause: sabotage cause detail: cleanup / recovery duratiom: 82 terrain: Land delay: |
incident year: 2012 site location name: 12” Imo River Pipeline at Uzuaku estimated quantity spilled: 5.8 estimated spill area: 0.000066 latitude: 4.905861 longitude: 7.178889 cause: sabotage cause detail: cleanup / recovery duratiom: 44 terrain: Land delay: |
incident year: 2012 site location name: 12” Imo River Pipeline at Uzuaku estimated quantity spilled: 0.89 estimated spill area: 0.000012 latitude: 4.922611 longitude: 7.219194 cause: sabotage cause detail: cleanup / recovery duratiom: 43 terrain: Land delay: |
incident year: 2012 site location name: 10' Ekulama Pipeline at Ekulama estimated quantity spilled: 49.4 estimated spill area: 0.0839 latitude: 4.55575 longitude: 6.706861 cause: sabotage cause detail: cleanup / recovery duratiom: 12 terrain: Swamp delay: |
incident year: 2012 site location name: 16'' Eriemu - UPS Pipeline at Ekrejebor estimated quantity spilled: 1251.7 estimated spill area: latitude: 5.522611 longitude: 6.031972 cause: sabotage cause detail: cleanup / recovery duratiom: 22 terrain: Land delay: |
incident year: 2012 site location name: 16' Egbema - Assa Trunkline at Obile estimated quantity spilled: 2.4 estimated spill area: latitude: 5.404111 longitude: 6.786083 cause: sabotage cause detail: cleanup / recovery duratiom: 7 terrain: Land delay: |
incident year: 2012 site location name: 24' Nembe Creek - Cawthorne Channel Pipeline behind Sego manifold estimated quantity spilled: 86.7 estimated spill area: 0.0726 latitude: 4.499417 longitude: 6.613917 cause: sabotage cause detail: cleanup / recovery duratiom: 149 terrain: Swamp delay: |
incident year: 2012 site location name: 16'' Uzere - Eriemu Pipeline at Iyede estimated quantity spilled: 0.83 estimated spill area: latitude: 5.493944 longitude: 6.090111 cause: sabotage cause detail: cleanup / recovery duratiom: 44 terrain: Land delay: |
incident year: 2012 site location name: 18' Assa - Rumuekpe Pipeline at Egbeda estimated quantity spilled: 1.3 estimated spill area: 0.0002 latitude: 5.225917 longitude: 6.766667 cause: sabotage cause detail: cleanup / recovery duratiom: 12 terrain: Land delay: |
incident year: 2012 site location name: 24' Nembecreek - Cawthorne channel Pipeline near Tora Manifold estimated quantity spilled: 118.5 estimated spill area: 0.0024 latitude: 4.476611 longitude: 6.482333 cause: sabotage cause detail: cleanup / recovery duratiom: 124 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2012 site location name: Agbada Well 34S Flowline At Omuohia / Omueke estimated quantity spilled: 7.7 estimated spill area: 0.0021 latitude: 4.928583 longitude: 7.025222 cause: sabotage cause detail: cleanup / recovery duratiom: 108 terrain: Swamp delay: |
incident year: 2012 site location name: 18' Assa - Rumuekpe Trunkline at Omudioga. estimated quantity spilled: 2 estimated spill area: latitude: 5.156972 longitude: 6.749528 cause: sabotage cause detail: cleanup / recovery duratiom: 75 terrain: Land delay: |
incident year: 2012 site location name: 24” Nkpoku-Bomu Pipeline at Bera. estimated quantity spilled: 34.3 estimated spill area: 0.0004 latitude: 4.686 longitude: 7.277722 cause: sabotage cause detail: cleanup / recovery duratiom: 78 terrain: Land delay: |
incident year: 2012 site location name: Benisede Well 11S estimated quantity spilled: 15.3 estimated spill area: latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: 35 terrain: Swamp delay: |
incident year: 2012 site location name: 24' Nembe Creek - Cawthorne Channel Pipeline at Sego manifold estimated quantity spilled: 561.2 estimated spill area: 0.1322 latitude: 4.500333 longitude: 6.605333 cause: sabotage cause detail: cleanup / recovery duratiom: 80 terrain: Swamp delay: |
incident year: 2012 site location name: Agbada 2 Well 69S Flowline at Umuokwa estimated quantity spilled: 1.3 estimated spill area: 0.0002 latitude: 4.9335 longitude: 7.053139 cause: sabotage cause detail: cleanup / recovery duratiom: 95 terrain: Land delay: |
incident year: 2012 site location name: 14' Okordia - Rumuekpe Trunkline at Ikarama estimated quantity spilled: 13.1 estimated spill area: 0.0039 latitude: 5.134556 longitude: 6.4695 cause: sabotage cause detail: cleanup / recovery duratiom: 109 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2012 site location name: Oroni Well 7L ;3L & 3S Flowline estimated quantity spilled: 2.1 estimated spill area: latitude: 5.360333 longitude: 6.152611 cause: sabotage cause detail: cleanup / recovery duratiom: 67 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2012 site location name: 24' Nkpoku - Bomu Pipeline at Nonwa estimated quantity spilled: 326.5 estimated spill area: 0.0016 latitude: 4.743917 longitude: 7.244917 cause: sabotage cause detail: cleanup / recovery duratiom: 74 terrain: Land delay: |
incident year: 2012 site location name: 24' Nkpoku - Bomu Pipeline at Botem estimated quantity spilled: 0.64 estimated spill area: 0.0001 latitude: 4.722 longitude: 7.274222 cause: sabotage cause detail: cleanup / recovery duratiom: 2 terrain: Land delay: |
incident year: 2012 site location name: 28' Nkpoku -Bomu Pipeline at Gio estimated quantity spilled: 158.2 estimated spill area: 0.039484 latitude: 4.694056 longitude: 7.243861 cause: sabotage cause detail: cleanup / recovery duratiom: 301 terrain: Land delay: |
incident year: 2012 site location name: 10' Diebu Creek Pipeline at Onyoma estimated quantity spilled: 55.4 estimated spill area: 0.0168 latitude: 4.757111 longitude: 6.103306 cause: sabotage cause detail: cleanup / recovery duratiom: 189 terrain: Swamp delay: community |
incident year: 2011 site location name: 10' Ekulama 1 Pipeline at Free Town estimated quantity spilled: 150 estimated spill area: 0.7077 latitude: 4.533528 longitude: 6.683611 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 173 terrain: Swamp / Water delay: community |
incident year: 2012 site location name: 28' Nkpoku - Bomu Pipeline at Gio estimated quantity spilled: 9.8 estimated spill area: 0.00076 latitude: 4.69975 longitude: 7.246472 cause: sabotage cause detail: cleanup / recovery duratiom: 289 terrain: Land delay: |
incident year: 2012 site location name: 18' Assa - Rumuekpe Trunkline at Egbeda estimated quantity spilled: 4.2 estimated spill area: 0.000889 latitude: 5.256972 longitude: 6.773972 cause: sabotage cause detail: cleanup / recovery duratiom: 78 terrain: Land delay: |
incident year: 2012 site location name: 36' Rumuekpe - Nkpoku Pipeline at Mgbodo Aluu estimated quantity spilled: 379.1 estimated spill area: 0.0447 latitude: 4.926917 longitude: 6.974667 cause: sabotage cause detail: cleanup / recovery duratiom: 81 terrain: Land delay: |
incident year: 2012 site location name: 8' Umuechem - Nkpoku delivery line at Umuechem estimated quantity spilled: 10.9 estimated spill area: 0.0006 latitude: 5.001972 longitude: 7.021194 cause: sabotage cause detail: cleanup / recovery duratiom: 59 terrain: Land delay: |
incident year: 2012 site location name: Cawthorne Channel 2 Well 51 T at Mbiama estimated quantity spilled: 1.8 estimated spill area: 0.0009 latitude: 4.554556 longitude: 7.005611 cause: sabotage cause detail: cleanup / recovery duratiom: 64 terrain: Swamp delay: |
incident year: 2012 site location name: Ekulama 2 Well 38L Flowline at Freetown estimated quantity spilled: 9 estimated spill area: 0.0273 latitude: 4.536889 longitude: 6.663528 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 131 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2012 site location name: 8' Umuechem - Nkpoku Pipeline at Omusele estimated quantity spilled: 5.6 estimated spill area: 0.0013 latitude: 4.971028 longitude: 7.025667 cause: sabotage cause detail: cleanup / recovery duratiom: 55 terrain: Land delay: |
incident year: 2012 site location name: 36' Nkpoku - Bomu Trunkline at Eneka. estimated quantity spilled: 88 estimated spill area: 0.0031 latitude: 4.896389 longitude: 7.053889 cause: sabotage cause detail: cleanup / recovery duratiom: 100 terrain: Land delay: |
incident year: 2012 site location name: 36' Nkpoku-Bomu Trunkline at Atali estimated quantity spilled: 60 estimated spill area: 0.009 latitude: 4.887 longitude: 7.064778 cause: sabotage cause detail: cleanup / recovery duratiom: 96 terrain: Land delay: |
incident year: 2012 site location name: 20' Rumuekpe – Nkpoku Trunkline at Ibaa estimated quantity spilled: 200.2 estimated spill area: 0.0223 latitude: 4.95375 longitude: 6.832972 cause: sabotage cause detail: cleanup / recovery duratiom: 81 terrain: Land delay: |
incident year: 2014 site location name: 28'' Nembe Creek Pipeline at Boro (Kula) estimated quantity spilled: 75 estimated spill area: 0.022 latitude: 4.5370556 longitude: 6.7549861 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 248 terrain: Swamp delay: |
incident year: 2014 site location name: Santa Barbara Mobile Production Facility at Nembe-Bassambiri estimated quantity spilled: 0.2 estimated spill area: 0.000001 latitude: 4.5386389 longitude: 6.5031667 cause: operational cause detail: (operational and maintenance error ) cleanup / recovery duratiom: 177 terrain: Swamp delay: |
incident year: 2012 site location name: 8' Umuechem - Nkpoku Delivery Line at Umusele estimated quantity spilled: 22.4 estimated spill area: 0.00343 latitude: 4.970528 longitude: 7.02625 cause: sabotage cause detail: cleanup / recovery duratiom: 41 terrain: Land delay: |
incident year: 2012 site location name: 8' Umuechem - Nkpoku Delivery Line at Umuechem estimated quantity spilled: 33.5 estimated spill area: 0.000861 latitude: 5.002889 longitude: 7.021056 cause: sabotage cause detail: cleanup / recovery duratiom: 33 terrain: Land delay: |
incident year: 2012 site location name: 24' Alakiri - Bonny Trunkline at Kalaibiama estimated quantity spilled: 24.3 estimated spill area: 0.0001 latitude: 4.49675 longitude: 7.140444 cause: sabotage cause detail: cleanup / recovery duratiom: 140 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2012 site location name: 28' Nkpoku - Bomu Trunkline at Ejamah estimated quantity spilled: 1076 estimated spill area: 0.047 latitude: 4.758528 longitude: 7.163167 cause: sabotage cause detail: cleanup / recovery duratiom: 15 terrain: Land delay: |
incident year: 2012 site location name: 24' Nkpoku - Bomu Trunkline at Kira estimated quantity spilled: 45 estimated spill area: 0.001046 latitude: 4.644889 longitude: 7.277528 cause: sabotage cause detail: cleanup / recovery duratiom: 343 terrain: Land delay: |
incident year: 2012 site location name: 8' Isimiri - Imo Gate delivery line at Obiakpu estimated quantity spilled: 55.5 estimated spill area: 0.001145 latitude: 4.887028 longitude: 7.188472 cause: sabotage cause detail: cleanup / recovery duratiom: 31 terrain: Land delay: |
incident year: 2012 site location name: Imo River Well 48L Flowline at Imo River estimated quantity spilled: 32 estimated spill area: latitude: 4.995056 longitude: 7.176083 cause: sabotage cause detail: cleanup / recovery duratiom: 246 terrain: Land delay: |
incident year: 2012 site location name: 12' Imo River-Ogale Trunk line at Owaza estimated quantity spilled: 87.7 estimated spill area: 0.0026 latitude: 4.980083 longitude: 7.175722 cause: sabotage cause detail: cleanup / recovery duratiom: 239 terrain: Land delay: |
incident year: 2012 site location name: 28' Nkpoku - Bomu Pipeline at Gio estimated quantity spilled: 35.8 estimated spill area: 0.0013 latitude: 4.699833 longitude: 7.246389 cause: sabotage cause detail: cleanup / recovery duratiom: 5 terrain: Land delay: |
incident year: 2012 site location name: 24'/28' Bomu - Bonny Terminal Right of Way at Mogho estimated quantity spilled: 398 estimated spill area: 0.011767 latitude: 4.640861 longitude: 7.27775 cause: sabotage cause detail: cleanup / recovery duratiom: 440 terrain: Land delay: community |
incident year: 2011 site location name: Krakama Well 13 at Bille estimated quantity spilled: 22.7 estimated spill area: latitude: 4.538639 longitude: 6.917028 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 78 terrain: Swamp delay: community |
incident year: 2012 site location name: Nembe 1 Well 19S at Nembe estimated quantity spilled: 4.9 estimated spill area: latitude: 4.436944 longitude: 6.317972 cause: sabotage cause detail: cleanup / recovery duratiom: 32 terrain: Swamp delay: cause of spill dispute |
incident year: 2012 site location name: 28' Nkpoku - Bomu Pipeline at Gio. estimated quantity spilled: 67 estimated spill area: 0.0006 latitude: 4.700083 longitude: 7.246167 cause: sabotage cause detail: cleanup / recovery duratiom: 5 terrain: Land delay: |
incident year: 2012 site location name: Imo River Well 44S Flow line Right of Way (ROW) behind Imo River Well 5 at Igiriukwu / Owaza estimated quantity spilled: 76 estimated spill area: 0.0054 latitude: 4.984472 longitude: 7.178194 cause: sabotage cause detail: cleanup / recovery duratiom: 43 terrain: Land delay: |
incident year: 2012 site location name: 4' Obelle - Ibaa Delivery Line at Ibaa estimated quantity spilled: 95.7 estimated spill area: 0.00812 latitude: 4.971806 longitude: 6.804306 cause: sabotage cause detail: cleanup / recovery duratiom: 29 terrain: Land delay: |
incident year: 2012 site location name: Agbada 2 Well 41/42/43 Wellheads at Umuohia estimated quantity spilled: 15.05 estimated spill area: 0.0008 latitude: 4.931139 longitude: 7.021694 cause: sabotage cause detail: cleanup / recovery duratiom: 81 terrain: Land delay: |
incident year: 2012 site location name: Cawthorne Channel 1 Well 49L at Cawthorne Channel estimated quantity spilled: 16.89 estimated spill area: 0.0008 latitude: 4.557167 longitude: 7.036306 cause: sabotage cause detail: cleanup / recovery duratiom: 82 terrain: Swamp delay: |
incident year: 2013 site location name: 10' Ekulama Pipeline at Ekulama estimated quantity spilled: 194 estimated spill area: 0.0883 latitude: 4.5405278 longitude: 6.6906389 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 369 terrain: Swamp delay: |
incident year: 2012 site location name: 28' Trans Niger Pipeline at Okolo estimated quantity spilled: 88.4 estimated spill area: 0.10626 latitude: 4.504694 longitude: 7.223 cause: sabotage cause detail: cleanup / recovery duratiom: 252 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2012 site location name: 28' Nkpoku - Bomu Trans Niger Pipeline at Aleto estimated quantity spilled: 4 estimated spill area: 0.000066 latitude: 4.808722 longitude: 7.104056 cause: sabotage cause detail: cleanup / recovery duratiom: 59 terrain: Land delay: |
incident year: 2012 site location name: 8'' Obigbo North - Elelenwa Pipeline at Umusia estimated quantity spilled: 511.6 estimated spill area: 0.0015 latitude: 4.859806 longitude: 7.135667 cause: sabotage cause detail: cleanup / recovery duratiom: 271 terrain: Land delay: |
incident year: 2012 site location name: 12” Imo River 2 Pipeline at Odagwa estimated quantity spilled: 26 estimated spill area: 0.001589 latitude: 4.981944 longitude: 7.169139 cause: sabotage cause detail: cleanup / recovery duratiom: 13 terrain: Land delay: |
incident year: 2012 site location name: 10' Diebu - Nun-River Delivery line at Ekowe estimated quantity spilled: 26 estimated spill area: 0.0483 latitude: 4.740528 longitude: 6.101444 cause: sabotage cause detail: cleanup / recovery duratiom: 91 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2012 site location name: 8' Obigbo North - Komkom Pipeline at Umuokolobo estimated quantity spilled: 20 estimated spill area: 0.0004 latitude: 4.869417 longitude: 7.135472 cause: sabotage cause detail: cleanup / recovery duratiom: 133 terrain: Land delay: |
incident year: 2012 site location name: 28' Nkpoku - Bomu Pipeline at Gio estimated quantity spilled: 111 estimated spill area: 0.001188 latitude: 4.703778 longitude: 7.243222 cause: sabotage cause detail: cleanup / recovery duratiom: 366 terrain: Land delay: community |
incident year: 2012 site location name: 24' Bomu-Bonny Pipeline at Mogho estimated quantity spilled: 14 estimated spill area: 0.000379 latitude: 4.644889 longitude: 7.277528 cause: sabotage cause detail: cleanup / recovery duratiom: 6 terrain: Land delay: |
incident year: 2012 site location name: 12'' Imo River - Oghale Pipeline at Uzuaku estimated quantity spilled: 33 estimated spill area: 0.002 latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: 33 terrain: Land delay: |
incident year: 2012 site location name: Imo River 1 Well 25S Flowline at Owaza estimated quantity spilled: 7 estimated spill area: 0.000033 latitude: 4.979917 longitude: 7.175694 cause: sabotage cause detail: cleanup / recovery duratiom: 35 terrain: Land delay: |
incident year: 2013 site location name: 10' Ekulama-1 Delivery Line at Ekulama estimated quantity spilled: 92 estimated spill area: 0.1329 latitude: 4.543722 longitude: 6.693806 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 436 terrain: Swamp delay: |
incident year: 2014 site location name: 10' Ekulama 1 - Sanbarth Pipeline at SanBarth / Ekulama estimated quantity spilled: 143 estimated spill area: 0.098 latitude: 4.5439444 longitude: 6.6941111 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 235 terrain: Swamp delay: |
incident year: 2012 site location name: Imo River 1 Well 18 Flow Line at Owaza estimated quantity spilled: 366 estimated spill area: 0.0028 latitude: 4.981167 longitude: 7.17325 cause: sabotage cause detail: cleanup / recovery duratiom: 36 terrain: Land delay: |
incident year: 2012 site location name: 6' Obigbo North - New Elelenwo Pipeline at Umusonya estimated quantity spilled: 721 estimated spill area: 0.0011 latitude: 4.854694 longitude: 7.140528 cause: sabotage cause detail: cleanup / recovery duratiom: 222 terrain: Land delay: |
incident year: 2012 site location name: 12' Imo River 1 and 2 - Ogale Pipeline at komkom estimated quantity spilled: 4689 estimated spill area: 0.4651 latitude: 4.876833 longitude: 7.172583 cause: sabotage cause detail: cleanup / recovery duratiom: 210 terrain: Land delay: |
incident year: 2012 site location name: 4' Otamiri Well 8L Flowline at Umuechem estimated quantity spilled: 23 estimated spill area: 0.000467 latitude: 5.023056 longitude: 7.006333 cause: sabotage cause detail: cleanup / recovery duratiom: 202 terrain: Land delay: |
incident year: 2012 site location name: 24' Nkpoku - Bomu Trunkline at Kira estimated quantity spilled: 242 estimated spill area: 0.02385 latitude: 4.730917 longitude: 7.262111 cause: sabotage cause detail: cleanup / recovery duratiom: 142 terrain: Land delay: |
incident year: 2012 site location name: 8' Ubie Pipeline at Ukpeliede Manifold estimated quantity spilled: 170.6 estimated spill area: 0.002623 latitude: 5.085222 longitude: 6.53925 cause: sabotage cause detail: cleanup / recovery duratiom: 104 terrain: Land delay: cause of spill dispute |
incident year: 2011 site location name: 10' Ekulama 2 Pipeline at Ekulama estimated quantity spilled: 15 estimated spill area: 0.086839 latitude: 4.549472 longitude: 6.667889 cause: operational cause detail: (sabotage) cleanup / recovery duratiom: 142 terrain: Swamp / Water delay: other (terrain, floods, ...) |
incident year: 2012 site location name: Santa Barbara Well 11 T at Santa Barbara estimated quantity spilled: 1 estimated spill area: latitude: 4.549611 longitude: 6.534083 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 81 terrain: Swamp delay: |
incident year: 2011 site location name: Awoba North West Well1 L/S Flowline at Awoba estimated quantity spilled: 10 estimated spill area: 0.01 latitude: 4.550056 longitude: 6.770528 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 68 terrain: Swamp delay: |
incident year: 2014 site location name: Ekulama 2 Well 36L Flowline at FreeTown (Kula) estimated quantity spilled: 8 estimated spill area: latitude: 4.5500833 longitude: 6.6727778 cause: operational cause detail: cleanup / recovery duratiom: 281 terrain: Swamp delay: community |
incident year: 2012 site location name: 8' Isimiri Pipeline at Obiakpu estimated quantity spilled: 312 estimated spill area: 0.0011 latitude: 4.887028 longitude: 7.188611 cause: sabotage cause detail: cleanup / recovery duratiom: 178 terrain: Land delay: |
incident year: 2012 site location name: Imo River Well 64S Flowline at Imo River estimated quantity spilled: 603 estimated spill area: 0.0258 latitude: 4.980056 longitude: 7.179306 cause: sabotage cause detail: cleanup / recovery duratiom: 38 terrain: Land delay: |
incident year: 2013 site location name: 24' Nkpoku - Bomu Pipeline at Sime estimated quantity spilled: 5 estimated spill area: 0.0002 latitude: 4.773778 longitude: 7.207389 cause: sabotage cause detail: cleanup / recovery duratiom: 5 terrain: Swamp delay: |
incident year: 2013 site location name: 8' Isimiri Pipeline at Uzuakwu estimated quantity spilled: 201 estimated spill area: 0.001 latitude: 4.889861 longitude: 7.175611 cause: sabotage cause detail: cleanup / recovery duratiom: 686 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2011 site location name: 12” Cawthorne channel I Pipeline at Cawthorne Channel estimated quantity spilled: 3.1 estimated spill area: 0.0031 latitude: 4.550614 longitude: 7.060639 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 180 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2013 site location name: 10' Diebu Creek - Nun River Pipeline at Onyoma estimated quantity spilled: 65 estimated spill area: 0.0079 latitude: 4.767694 longitude: 6.104528 cause: sabotage cause detail: cleanup / recovery duratiom: 127 terrain: Swamp delay: |
incident year: 2013 site location name: 24' Bomu - Bonny Pipeline at Mogho estimated quantity spilled: 18 estimated spill area: 0.0014 latitude: 4.648861 longitude: 7.277222 cause: sabotage cause detail: cleanup / recovery duratiom: 28 terrain: Land delay: |
incident year: 2013 site location name: 10' Santa Barbara Pipeline at Santa Barbara estimated quantity spilled: 22 estimated spill area: 0.0215 latitude: 4.52925 longitude: 6.499194 cause: sabotage cause detail: cleanup / recovery duratiom: 118 terrain: Land delay: |
incident year: 2013 site location name: 8' Umuechem - Nkpoku Pipeline at Omunwei near Igwuruta estimated quantity spilled: 5 estimated spill area: 0.000251 latitude: 4.982667 longitude: 7.023944 cause: sabotage cause detail: cleanup / recovery duratiom: 237 terrain: Land delay: |
incident year: 2013 site location name: 10' Ekulama-Sanbarth Pipeline at New Town estimated quantity spilled: 20 estimated spill area: 0.0855 latitude: 4.558722 longitude: 6.708889 cause: sabotage cause detail: cleanup / recovery duratiom: 166 terrain: Swamp delay: cause of spill dispute |
incident year: 2013 site location name: 12' Imo River - Ogale Pipeline at Uzuaku estimated quantity spilled: 105 estimated spill area: 0.0002 latitude: 4.894667 longitude: 7.177056 cause: sabotage cause detail: cleanup / recovery duratiom: 99 terrain: Land delay: |
incident year: 2011 site location name: Cawthorne Channel 2 F/S Well 51T Flowline RoW estimated quantity spilled: 2.6 estimated spill area: 0.0011 latitude: 4.553333 longitude: 7.005556 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 40 terrain: Swamp delay: |
incident year: 2013 site location name: 8' Umuechem - Nkpoku Delivery Line at Umuwenye estimated quantity spilled: 47 estimated spill area: 0.00157 latitude: 4.98075 longitude: 7.024222 cause: sabotage cause detail: cleanup / recovery duratiom: 215 terrain: Land delay: |
incident year: 2013 site location name: 12' Imo River 2 Pipeline at Odagwa estimated quantity spilled: 7 estimated spill area: 0.0002 latitude: 4.982083 longitude: 7.169028 cause: sabotage cause detail: cleanup / recovery duratiom: 162 terrain: Land delay: |
incident year: 2013 site location name: 2' Imo River 1 Well 13 Gas Lift Line at Igiriukwu / Isi-Etitioha estimated quantity spilled: 6 estimated spill area: 0.00021 latitude: 4.979139 longitude: 7.179778 cause: sabotage cause detail: cleanup / recovery duratiom: 170 terrain: Land delay: |
incident year: 2011 site location name: Cawthorne Channel Well 29T Flowline at Cawthorne Channel estimated quantity spilled: 6.97 estimated spill area: latitude: 4.553917 longitude: 7.005611 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2011 site location name: Well 29T flowline at Cawthorne Channel estimated quantity spilled: 0.7 estimated spill area: 0.0011 latitude: 4.554056 longitude: 7.005611 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 78 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2013 site location name: 30' Nembe Creek Trunkline near Awoba estimated quantity spilled: 634 estimated spill area: 0.1099 latitude: 4.567889 longitude: 6.861417 cause: sabotage cause detail: cleanup / recovery duratiom: 173 terrain: Swamp delay: |
incident year: 2013 site location name: 12” Oguta - Egbema Pipeline at Obiakpu estimated quantity spilled: 310 estimated spill area: 0.006017 latitude: 5.573028 longitude: 6.76075 cause: sabotage cause detail: cleanup / recovery duratiom: 8 terrain: Land delay: |
incident year: 2013 site location name: 4' Imo River Well 64L Flow line at Igiriukwu estimated quantity spilled: 38 estimated spill area: latitude: 4.980694 longitude: 7.178556 cause: sabotage cause detail: cleanup / recovery duratiom: 579 terrain: Land delay: |
incident year: 2013 site location name: 12' Oguta - Egbema Pipeline at Opuoma Oguta estimated quantity spilled: 33 estimated spill area: 0.0008 latitude: 5.592333 longitude: 6.759694 cause: sabotage cause detail: cleanup / recovery duratiom: 144 terrain: Land delay: |
incident year: 2013 site location name: 8' Nkali Pipeline at Umuedeokwara (Odagwa) estimated quantity spilled: 52 estimated spill area: 0.0003 latitude: 4.98725 longitude: 7.160972 cause: sabotage cause detail: cleanup / recovery duratiom: 97 terrain: Land delay: |
incident year: 2013 site location name: 4' Adibawa Well 8S Flowline at Edagberi estimated quantity spilled: 2 estimated spill area: latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: 171 terrain: Land delay: |
incident year: 2013 site location name: 4' Adibawa Well 8S Flowline at Edagberi estimated quantity spilled: 7 estimated spill area: 0.0001 latitude: 5.1978333 longitude: 6.5436944 cause: sabotage cause detail: cleanup / recovery duratiom: 599 terrain: Land delay: |
incident year: 2011 site location name: Cawthorne Channel Well 29T Flowline at Cawthorne Channel estimated quantity spilled: 2.4 estimated spill area: 0.0035 latitude: 4.554083 longitude: 7.005583 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 58 terrain: Swamp delay: |
incident year: 2013 site location name: 24” Nembe Creek Pipeline at Aberedo-a Owuangai estimated quantity spilled: 38 estimated spill area: 0.01123 latitude: 4.488722 longitude: 6.589167 cause: sabotage cause detail: cleanup / recovery duratiom: 162 terrain: Swamp delay: |
incident year: 2013 site location name: 12' Imo River 2 - Ogale Pipeline at Kom Kom estimated quantity spilled: 658 estimated spill area: 0.0165 latitude: 4.876667 longitude: 7.172611 cause: sabotage cause detail: cleanup / recovery duratiom: 31 terrain: Land delay: |
incident year: 2013 site location name: 30' Nembe Creek Pipeline at Bille estimated quantity spilled: 5 estimated spill area: latitude: 4.561278 longitude: 6.845611 cause: sabotage cause detail: cleanup / recovery duratiom: 86 terrain: Swamp delay: |
incident year: 2013 site location name: 24'' Nkpoku - Bomu Pipeline at Elelenwa estimated quantity spilled: 442 estimated spill area: 0.0005 latitude: 4.857083 longitude: 7.099722 cause: sabotage cause detail: cleanup / recovery duratiom: 121 terrain: Land delay: |
incident year: 2013 site location name: 6' Adibawa North East 6 Bulk line at Biseni estimated quantity spilled: 2 estimated spill area: latitude: 5.212917 longitude: 6.517611 cause: sabotage cause detail: cleanup / recovery duratiom: 149 terrain: Land delay: |
incident year: 2013 site location name: 24' Nembe Creek Pipeline at Kalibiama estimated quantity spilled: 62 estimated spill area: latitude: 4.498917 longitude: 7.135778 cause: sabotage cause detail: cleanup / recovery duratiom: 99 terrain: Swamp delay: |
incident year: 2013 site location name: 30' Nembe Creek Pipeline at Bille estimated quantity spilled: 124 estimated spill area: 0.000172 latitude: 4.56475 longitude: 6.845611 cause: sabotage cause detail: cleanup / recovery duratiom: 318 terrain: Swamp delay: |
incident year: 2013 site location name: 4' Adibawa Well 2S Flowline at Adibawa estimated quantity spilled: 7 estimated spill area: latitude: 5.193694 longitude: 6.493083 cause: sabotage cause detail: cleanup / recovery duratiom: 15 terrain: Land delay: |
incident year: 2013 site location name: 30' Nembe Creek Pipeline (Awoba North-East) @ Boro (Kula) estimated quantity spilled: 17 estimated spill area: 0.0023 latitude: 4.551333 longitude: 6.780861 cause: sabotage cause detail: cleanup / recovery duratiom: 172 terrain: Swamp delay: |
incident year: 2013 site location name: 4' Adibawa North East Well 1L Flowline at Biseni estimated quantity spilled: 11 estimated spill area: latitude: 5.256583 longitude: 6.523222 cause: sabotage cause detail: cleanup / recovery duratiom: 147 terrain: Land delay: |
incident year: 2013 site location name: 8' Ubie-Ukpeliede Pipeline at Idu-Ekpeye estimated quantity spilled: 49 estimated spill area: 0.0021 latitude: 5.095472 longitude: 6.546083 cause: sabotage cause detail: cleanup / recovery duratiom: 421 terrain: Land delay: |
incident year: 2013 site location name: 12' Oguta - Egbema Pipeline at Obiakpu estimated quantity spilled: 2 estimated spill area: 0.0003 latitude: 5.573111 longitude: 6.76075 cause: sabotage cause detail: cleanup / recovery duratiom: 86 terrain: Land delay: |
incident year: 2013 site location name: 12' Imo River II Pipeline at Umuedeokwara Odagwa estimated quantity spilled: 8 estimated spill area: latitude: 4.981889 longitude: 7.169139 cause: sabotage cause detail: cleanup / recovery duratiom: 88 terrain: Land delay: cause of spill dispute |
incident year: 2013 site location name: 24' Nkpoku - Bomu Pipeline at Egbalor estimated quantity spilled: 0.2 estimated spill area: 0.00001 latitude: 4.784278 longitude: 7.189389 cause: sabotage cause detail: cleanup / recovery duratiom: 1 terrain: Land delay: |
incident year: 2013 site location name: 6' Obigbo North - Komkom Pipeline at Komkom estimated quantity spilled: 46 estimated spill area: 0.00071 latitude: 4.856639 longitude: 7.15125 cause: sabotage cause detail: cleanup / recovery duratiom: 7 terrain: Land delay: |
incident year: 2013 site location name: 24' Nkpoku - Bomu Pipeline at Egbalor estimated quantity spilled: 13 estimated spill area: latitude: 4.782194 longitude: 7.192944 cause: sabotage cause detail: cleanup / recovery duratiom: 6 terrain: Land delay: |
incident year: 2013 site location name: 28' Bomu - Bonny Trans Niger Pipeline at Bodo West estimated quantity spilled: 24 estimated spill area: 0.0026 latitude: 4.579861 longitude: 7.252889 cause: sabotage cause detail: cleanup / recovery duratiom: 564 terrain: Swamp delay: community |
incident year: 2013 site location name: 12' Adibawa-Okordia Pipeline at Ikarama estimated quantity spilled: 10 estimated spill area: 0.0001 latitude: 5.154972 longitude: 6.457 cause: sabotage cause detail: cleanup / recovery duratiom: 117 terrain: Land delay: |
incident year: 2013 site location name: 24' Nembe Creek Pipeline at Adamakiri estimated quantity spilled: 38 estimated spill area: 0.000559 latitude: 4.517333 longitude: 7.10675 cause: sabotage cause detail: cleanup / recovery duratiom: 545 terrain: Swamp delay: |
incident year: 2013 site location name: 12' Imo River II - Ogale TNP at Odagwa estimated quantity spilled: 35 estimated spill area: 0.0004 latitude: 4.980778 longitude: 7.170417 cause: sabotage cause detail: cleanup / recovery duratiom: 132 terrain: Land delay: |
incident year: 2013 site location name: 24' Bomu - Bonny Pipeline at Bodo West estimated quantity spilled: 27 estimated spill area: 0.005 latitude: 4.564417 longitude: 7.252778 cause: sabotage cause detail: cleanup / recovery duratiom: 762 terrain: Swamp delay: community |
incident year: 2013 site location name: 24' Nembe Creek Pipeline at Adamakiri estimated quantity spilled: 16 estimated spill area: 0.000024 latitude: 4.527778 longitude: 7.09325 cause: sabotage cause detail: cleanup / recovery duratiom: 329 terrain: Swamp delay: |
incident year: 2013 site location name: 8' Ubie-Ukpeliede Pipeline at Idu-Ekpeye estimated quantity spilled: 54 estimated spill area: 0.002372 latitude: 5.092222 longitude: 6.543917 cause: sabotage cause detail: cleanup / recovery duratiom: 287 terrain: Land delay: |
incident year: 2011 site location name: Cawthorne Channel Well 24T FL ROW at Cawthorne Channel estimated quantity spilled: 0.9 estimated spill area: latitude: 4.554111 longitude: 7.005583 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2013 site location name: 20’’ Opukushi – Brass Creek Pipeline at Tamogbene estimated quantity spilled: 102 estimated spill area: latitude: 4.949139 longitude: 5.669186 cause: sabotage cause detail: cleanup / recovery duratiom: 71 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2013 site location name: 20'' Otumara-Saghara Pipeline at Otumara estimated quantity spilled: 135 estimated spill area: latitude: 5.615472 longitude: 5.172833 cause: sabotage cause detail: cleanup / recovery duratiom: 33 terrain: Swamp delay: |
incident year: 2013 site location name: 28' Bomu - Bonny Trans Niger Pipeline at Bodo West estimated quantity spilled: 508 estimated spill area: latitude: 4.584778 longitude: 7.256222 cause: sabotage cause detail: cleanup / recovery duratiom: 751 terrain: Swamp delay: |
incident year: 2013 site location name: 28' Bomu - Bonny Trans Niger Pipeline at Bodo City estimated quantity spilled: 2699 estimated spill area: latitude: 4.574694 longitude: 7.254139 cause: sabotage cause detail: cleanup / recovery duratiom: 741 terrain: Swamp delay: |
incident year: 2013 site location name: 28' Bomu - Bonny Trans Niger Pipeline at Bodo City estimated quantity spilled: 166 estimated spill area: 0.0008 latitude: 4.587028 longitude: 7.256472 cause: sabotage cause detail: cleanup / recovery duratiom: 732 terrain: Land delay: |
incident year: 2013 site location name: 6' Obigbo North _Ogale Pipeline at Ogale estimated quantity spilled: 3 estimated spill area: 0.0003 latitude: 4.830722 longitude: 7.155472 cause: sabotage cause detail: cleanup / recovery duratiom: 103 terrain: Land delay: |
incident year: 2013 site location name: 12' Oguta - Egbema Pipeline at Obiakpu estimated quantity spilled: 63 estimated spill area: 0.0007 latitude: 5.558639 longitude: 6.761583 cause: sabotage cause detail: cleanup / recovery duratiom: 8 terrain: Land delay: |
incident year: 2013 site location name: 36' Rumuekpe - Nkpoku Pipeline at Ibaa estimated quantity spilled: 17 estimated spill area: 0.000568 latitude: 4.9548056 longitude: 6.7934167 cause: sabotage cause detail: cleanup / recovery duratiom: 15 terrain: Land delay: |
incident year: 2013 site location name: 4' Cawthorne Channel 2 well 29T at Mbiama estimated quantity spilled: 7.8 estimated spill area: 0.0003 latitude: 4.554222 longitude: 7.005583 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 255 terrain: Swamp delay: |
incident year: 2013 site location name: 10' Diebu Creek - Nun River Pipeline at Onyoma /Eniwari estimated quantity spilled: 110 estimated spill area: 0.0078 latitude: 4.767972 longitude: 6.104556 cause: sabotage cause detail: cleanup / recovery duratiom: 45 terrain: Swamp delay: |
incident year: 2013 site location name: 6' Imo River Pipeline at Ogale estimated quantity spilled: 71 estimated spill area: latitude: 4.820278 longitude: 7.154222 cause: sabotage cause detail: cleanup / recovery duratiom: 126 terrain: Land delay: |
incident year: 2013 site location name: 20' Otumara - Escravos Pipeline at Ajudaibo estimated quantity spilled: 10 estimated spill area: latitude: 5.566806 longitude: 5.204389 cause: sabotage cause detail: cleanup / recovery duratiom: 286 terrain: Swamp delay: |
incident year: 2013 site location name: 20' Otumara-Escravos Pipeline at Otumara axis estimated quantity spilled: 3 estimated spill area: latitude: 5.633306 longitude: 5.158083 cause: sabotage cause detail: cleanup / recovery duratiom: 252 terrain: Swamp delay: |
incident year: 2013 site location name: 12' Imo River 2 - Ogale Pipeline at Umuedeokwara Odagwa estimated quantity spilled: 47 estimated spill area: 0.0009 latitude: 4.980806 longitude: 7.170278 cause: sabotage cause detail: cleanup / recovery duratiom: 75 terrain: Land delay: |
incident year: 2013 site location name: 6' Cawthorne Channel 3 Well 4S Flowline at Krakrama estimated quantity spilled: 3 estimated spill area: 0.0006 latitude: 4.52725 longitude: 6.958361 cause: sabotage cause detail: cleanup / recovery duratiom: 191 terrain: Swamp delay: |
incident year: 2013 site location name: 14' Okordia-Rumuekpe Pipeline at Akaramini estimated quantity spilled: 9 estimated spill area: 0.00064 latitude: 5.119 longitude: 6.487167 cause: sabotage cause detail: cleanup / recovery duratiom: 284 terrain: Land delay: |
incident year: 2013 site location name: 24' Nkpoku-Bomu Trans Niger Pipeline at Biara estimated quantity spilled: 8 estimated spill area: 0.0001 latitude: 4.686917 longitude: 7.277833 cause: sabotage cause detail: cleanup / recovery duratiom: 5 terrain: Land delay: |
incident year: 2013 site location name: 8' Isimiri - Imo Gate Delivery line at Obiakpu estimated quantity spilled: 47 estimated spill area: latitude: 4.88575 longitude: 7.194889 cause: sabotage cause detail: cleanup / recovery duratiom: 154 terrain: Land delay: |
incident year: 2013 site location name: 28' Bomu Bonny Pipeline at Freetown estimated quantity spilled: 196 estimated spill area: 0.1092 latitude: 4.513389 longitude: 7.231056 cause: sabotage cause detail: cleanup / recovery duratiom: 250 terrain: Swamp delay: |
incident year: 2013 site location name: 4' Imo River Well 55S Flowline at Igiriukwu estimated quantity spilled: 5 estimated spill area: 0.00063 latitude: 4.994972 longitude: 7.176139 cause: sabotage cause detail: cleanup / recovery duratiom: 233 terrain: Land delay: |
incident year: 2013 site location name: 12'' Imo River - Ogale Pipeline at Umuedeokwara (Odagwa) estimated quantity spilled: 54 estimated spill area: latitude: 4.980806 longitude: 7.170333 cause: sabotage cause detail: cleanup / recovery duratiom: 63 terrain: Land delay: |
incident year: 2013 site location name: 14' Adibawa-Okordia Pipeline at Ikarama estimated quantity spilled: 447 estimated spill area: 0.0098 latitude: 5.1531947 longitude: 6.4531669 cause: sabotage cause detail: cleanup / recovery duratiom: 286 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2013 site location name: 24' Nkpoku - Bomu Pipeline at Bera estimated quantity spilled: 9 estimated spill area: 0.00003 latitude: 4.68075 longitude: 7.276889 cause: sabotage cause detail: cleanup / recovery duratiom: 296 terrain: Land delay: |
incident year: 2013 site location name: Imo River Well 22S Flowline at Igiriukwu estimated quantity spilled: 112 estimated spill area: latitude: 4.980139 longitude: 7.183444 cause: sabotage cause detail: cleanup / recovery duratiom: 295 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2013 site location name: 6'' Obigbo North - Ogale Pipeline at Ogale estimated quantity spilled: 52 estimated spill area: latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2013 site location name: 12' Imo River - Ogale Pipeline at Owaza estimated quantity spilled: 734 estimated spill area: 0.0023 latitude: 4.945056 longitude: 7.184806 cause: sabotage cause detail: cleanup / recovery duratiom: 181 terrain: Land delay: |
incident year: 2013 site location name: 20' Rumuekpe - Nkpoku Pipeline at Ibaa estimated quantity spilled: 1070 estimated spill area: latitude: 4.95375 longitude: 6.833 cause: sabotage cause detail: cleanup / recovery duratiom: 235 terrain: Land delay: |
incident year: 2011 site location name: Cawthorne Channel Well 21L ROW at Mbiama estimated quantity spilled: 0.93 estimated spill area: latitude: 4.55425 longitude: 7.010806 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 91 terrain: Swamp delay: community |
incident year: 2013 site location name: 36' Nkpoku-Bomu Pipeline at Rumuolukwu Eneka estimated quantity spilled: 2058 estimated spill area: 0.00318 latitude: 4.898833 longitude: 7.051028 cause: sabotage cause detail: cleanup / recovery duratiom: 582 terrain: Land delay: |
incident year: 2013 site location name: Etelebou Wells 1 & 2 Wellheads at Ogboloma estimated quantity spilled: 386 estimated spill area: 0.0041 latitude: ND longitude: ND cause: other cause detail: cleanup / recovery duratiom: 481 terrain: Land delay: community |
incident year: 2013 site location name: 20” Otumara - Escravos Pipeline at Ajudaibo estimated quantity spilled: 6 estimated spill area: latitude: 5.567417 longitude: 5.204611 cause: sabotage cause detail: cleanup / recovery duratiom: 206 terrain: Swamp delay: |
incident year: 2012 site location name: Cawthorne Channel 3 Well 41S Flowline at Cawthorne Channel estimated quantity spilled: 3 estimated spill area: latitude: 4.556 longitude: 6.97575 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 94 terrain: Swamp delay: community |
incident year: 2014 site location name: 28'' Cawthorne Channel II - Nembe Creek Trunkline at Akiele-Ama / Kengama-kiri estimated quantity spilled: 61 estimated spill area: 0.0053 latitude: 4.5560833 longitude: 7.0439444 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 219 terrain: Swamp delay: |
incident year: 2013 site location name: 6' Imo River Well 1 30L Flow line estimated quantity spilled: 9 estimated spill area: 0.0008 latitude: 4.9866944 longitude: 7.1766111 cause: sabotage cause detail: cleanup / recovery duratiom: 247 terrain: Land delay: |
incident year: 2013 site location name: 30' Nembe Creek Pipeline at Krakama estimated quantity spilled: 9 estimated spill area: 0.000052 latitude: 4.566222 longitude: 6.902889 cause: sabotage cause detail: cleanup / recovery duratiom: 324 terrain: Swamp delay: |
incident year: 2013 site location name: 28' Bomu-Bonny Pipeline at Oloma estimated quantity spilled: 648 estimated spill area: 0.0179 latitude: 4.481889 longitude: 7.198889 cause: sabotage cause detail: cleanup / recovery duratiom: 188 terrain: Swamp delay: |
incident year: 2013 site location name: 28' Bomu - Bonny Pipeline at Bodo West estimated quantity spilled: 1330 estimated spill area: 0.0005 latitude: 4.592417 longitude: 7.257194 cause: sabotage cause detail: cleanup / recovery duratiom: 658 terrain: Swamp delay: community |
incident year: 2013 site location name: 24' Nkpoku - Bomu Pipeline at B-Dere estimated quantity spilled: 19 estimated spill area: 0.0005 latitude: 4.692194 longitude: 7.276639 cause: sabotage cause detail: cleanup / recovery duratiom: 1 terrain: Land delay: |
incident year: 2011 site location name: Ekulama 1 Well 35 ROW at Ekulama estimated quantity spilled: 5.9 estimated spill area: latitude: 4.556167 longitude: 6.706889 cause: operational cause detail: cleanup / recovery duratiom: 120 terrain: Swamp delay: community |
incident year: 2013 site location name: 28” Trans Niger Pipeline near Patrick Waterside Manifold at Bodocity estimated quantity spilled: 23 estimated spill area: 0.0004 latitude: 4.609694 longitude: 7.263333 cause: sabotage cause detail: cleanup / recovery duratiom: 625 terrain: Land delay: |
incident year: 2013 site location name: 20' Otumara - Escravos Pipeline at Ajudaibo estimated quantity spilled: 64 estimated spill area: latitude: 5.5607333 longitude: 5.2026833 cause: sabotage cause detail: cleanup / recovery duratiom: 189 terrain: Swamp delay: |
incident year: 2014 site location name: 4'' Ekulama Well 35S Flowline at Sanbath / Ekulama estimated quantity spilled: 121 estimated spill area: 0.09 latitude: 4.557 longitude: 6.706 cause: operational cause detail: (operational and maintenance error ) cleanup / recovery duratiom: 232 terrain: Swamp delay: |
incident year: 2013 site location name: 12' Imo River 2 - Ogale Pipeline at Umuololo Owaza estimated quantity spilled: 235 estimated spill area: 0.00273 latitude: 4.9464444 longitude: 7.1848333 cause: sabotage cause detail: cleanup / recovery duratiom: 120 terrain: Land delay: |
incident year: 2013 site location name: 24' Nkpoku - Bomu Trans Niger Pipeline at Biara / Kpite estimated quantity spilled: 7 estimated spill area: 0.00045 latitude: 4.713306 longitude: 7.2805 cause: sabotage cause detail: cleanup / recovery duratiom: 179 terrain: Land delay: |
incident year: 2013 site location name: 4' Imo River Well 53L and 56L Flowlines at Etitioha-Ipu estimated quantity spilled: 7 estimated spill area: 0.001 latitude: 4.969611 longitude: 7.177361 cause: sabotage cause detail: cleanup / recovery duratiom: 182 terrain: Land delay: |
incident year: 2013 site location name: 20'' Otumara - Escravos Pipeline at Ogidigben estimated quantity spilled: 11 estimated spill area: latitude: 5.5484722 longitude: 5.1996667 cause: sabotage cause detail: cleanup / recovery duratiom: 172 terrain: Swamp delay: |
incident year: 2013 site location name: 20' Otumara - Escravos Pipeline at Ugboegungun estimated quantity spilled: 76 estimated spill area: latitude: 5.6278333 longitude: 5.1624722 cause: sabotage cause detail: cleanup / recovery duratiom: 149 terrain: Swamp delay: |
incident year: 2013 site location name: Cawthorne Channel Mani Fold at Adamakiri estimated quantity spilled: 8 estimated spill area: 0.007 latitude: 4.557056 longitude: 7.061556 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 414 terrain: Swamp delay: |
incident year: 2011 site location name: Cawthorne Channel 2 Well 45T Flowline at Cawthorne Channel estimated quantity spilled: 4 estimated spill area: 0.0024 latitude: 4.557278 longitude: 7.118833 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 100 terrain: Swamp delay: |
incident year: 2013 site location name: 14'Okordia - Rumuekpe Akinima Riser at Akinima estimated quantity spilled: 96 estimated spill area: latitude: 5.120194 longitude: 6.483056 cause: sabotage cause detail: cleanup / recovery duratiom: 159 terrain: Land delay: |
incident year: 2013 site location name: 12' Imo River - Ogale Pipeline at Okohia estimated quantity spilled: 18 estimated spill area: 0.0012 latitude: 4.930028 longitude: 7.184583 cause: sabotage cause detail: cleanup / recovery duratiom: 125 terrain: Land delay: |
incident year: 2013 site location name: 36' Rumuekpe - Nkpoku Trans Niger Pipeline @ Omuigwe-Aluu estimated quantity spilled: 6 estimated spill area: 0.0045 latitude: 4.944778 longitude: 6.939667 cause: sabotage cause detail: cleanup / recovery duratiom: 264 terrain: Land delay: |
incident year: 2013 site location name: 24' Nkpoku - Bomu Pipeline at Kpite estimated quantity spilled: 10 estimated spill area: 0.0006 latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: 5 terrain: Land delay: |
incident year: 2013 site location name: 28' Bomu-Bonny Trans Niger Pipeline at Bodo City estimated quantity spilled: 48 estimated spill area: latitude: 4.629306 longitude: 7.276806 cause: sabotage cause detail: cleanup / recovery duratiom: 602 terrain: Swamp delay: community |
incident year: 2013 site location name: 28' Bomu-Bonny Pipeline at B-Dere estimated quantity spilled: 12 estimated spill area: 0.00003 latitude: 4.688472 longitude: 7.257167 cause: sabotage cause detail: cleanup / recovery duratiom: 136 terrain: Land delay: |
incident year: 2013 site location name: 6' Obigbo North - Ogale Pipeline at Ogale estimated quantity spilled: 55 estimated spill area: 0.0004 latitude: 4.845806 longitude: 7.157333 cause: sabotage cause detail: cleanup / recovery duratiom: 14 terrain: Land delay: |
incident year: 2013 site location name: 28' Nkpoku - Bomu Pipeline at Gio estimated quantity spilled: 67 estimated spill area: 0.00054 latitude: 4.71 longitude: 7.234417 cause: sabotage cause detail: cleanup / recovery duratiom: 174 terrain: Land delay: |
incident year: 2013 site location name: 24' Nkpoku - Bomu Trans Niger Pipeline at Egbalor estimated quantity spilled: 15 estimated spill area: 0.0004 latitude: 4.785056 longitude: 7.188083 cause: sabotage cause detail: cleanup / recovery duratiom: 8 terrain: Land delay: |
incident year: 2013 site location name: 14' Okordia - Rumuekpe Pipeline at Akaramini estimated quantity spilled: 169 estimated spill area: 0.0056 latitude: 5.119 longitude: 6.487167 cause: sabotage cause detail: cleanup / recovery duratiom: 149 terrain: Land delay: |
incident year: 2013 site location name: 16' Nun River - Kolo Creek Pipeline at Igeibiri estimated quantity spilled: 82 estimated spill area: 0.0018 latitude: 4.831639 longitude: 6.189167 cause: sabotage cause detail: cleanup / recovery duratiom: 99 terrain: Swamp delay: |
incident year: 2013 site location name: 6' Obigbo North - Ogale Pipeline at Ogale estimated quantity spilled: 315 estimated spill area: 0.0042 latitude: 4.838389 longitude: 7.156389 cause: sabotage cause detail: cleanup / recovery duratiom: 16 terrain: Land delay: |
incident year: 2013 site location name: 24' Bomu-Bonny Pipeline at Kpor / K-Dere estimated quantity spilled: 399 estimated spill area: 0.0115 latitude: 4.655639 longitude: 7.276833 cause: sabotage cause detail: cleanup / recovery duratiom: 360 terrain: Land delay: |
incident year: 2013 site location name: 20'' Otumara - Escravos Pipeline at Ajudaibo estimated quantity spilled: 13 estimated spill area: latitude: 5.576667 longitude: 5.206944 cause: sabotage cause detail: cleanup / recovery duratiom: 347 terrain: Swamp delay: |
incident year: 2013 site location name: 28' Bomu - Bonny Pipeline at Kpor; K-Dere estimated quantity spilled: 332 estimated spill area: latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: 347 terrain: Land delay: |
incident year: 2013 site location name: 14' Okordia - Rumuekpe Pipeline at Akaramini estimated quantity spilled: 16 estimated spill area: latitude: 5.1184444 longitude: 6.6683056 cause: sabotage cause detail: cleanup / recovery duratiom: 174 terrain: Land delay: |
incident year: 2013 site location name: 8'' Obigbo North-Ogale Pipeline at Umusoanya estimated quantity spilled: 6 estimated spill area: 0.00004 latitude: 4.8545 longitude: 7.1358333 cause: sabotage cause detail: cleanup / recovery duratiom: 154 terrain: Land delay: |
incident year: 2013 site location name: 28' Nkpoku - Bomu TNP at Gio estimated quantity spilled: 97 estimated spill area: 0.0072 latitude: 4.709972 longitude: 7.234333 cause: sabotage cause detail: cleanup / recovery duratiom: 148 terrain: Land delay: |
incident year: 2013 site location name: 14' Okordia - Rumuekpe Pipeline at Ikarama estimated quantity spilled: 101 estimated spill area: 0.0064 latitude: 5.153694 longitude: 6.452722 cause: sabotage cause detail: cleanup / recovery duratiom: 116 terrain: Land delay: |
incident year: 2013 site location name: 6'' Awoba -Manifold Pipeline at Awoba estimated quantity spilled: 163 estimated spill area: 0.0186 latitude: 4.5502778 longitude: 6.8141667 cause: sabotage cause detail: cleanup / recovery duratiom: 216 terrain: Land delay: |
incident year: 2012 site location name: Cawthorne Channel 2 Well 28T Flowline at Owame-ama / Okpoama estimated quantity spilled: 25 estimated spill area: 0.0033 latitude: 4.560333 longitude: 7.001778 cause: operational cause detail: (operational and maintenance error ) cleanup / recovery duratiom: 174 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2013 site location name: Cawthorne Channel 2 Well 45T flowline estimated quantity spilled: 22 estimated spill area: 0.009 latitude: 4.5625833 longitude: 7.0007778 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 372 terrain: Swamp delay: |
incident year: 2011 site location name: Cawthorne Channel Well 45T flowline at Mbiama estimated quantity spilled: 6.71 estimated spill area: 0.0015 latitude: 4.563611 longitude: 6.998889 cause: operational cause detail: (operational and maintenance error ) cleanup / recovery duratiom: 51 terrain: Swamp delay: community |
incident year: 2013 site location name: Seibou Bulkline3 at Azargbene estimated quantity spilled: 59 estimated spill area: 0.11146304 latitude: 4.88425 longitude: 5.8514167 cause: sabotage cause detail: cleanup / recovery duratiom: 156 terrain: Swamp delay: |
incident year: 2013 site location name: Ubie Well4S Wellhead estimated quantity spilled: 7 estimated spill area: 0 latitude: 5.0986111 longitude: 6.5461111 cause: sabotage cause detail: cleanup / recovery duratiom: 144 terrain: Land delay: |
incident year: 2013 site location name: 20'' Opukushi - Brass Creek Trunkline at Tamogbene estimated quantity spilled: 72 estimated spill area: latitude: 4.943056 longitude: 5.682194 cause: sabotage cause detail: cleanup / recovery duratiom: 338 terrain: Swamp delay: |
incident year: 2013 site location name: 20''Otumara-Escravos Pipeline at Adjudaibo estimated quantity spilled: 53 estimated spill area: latitude: 5.5748611 longitude: 5.2073333 cause: sabotage cause detail: cleanup / recovery duratiom: 320 terrain: Swamp delay: |
incident year: 2013 site location name: 24' Nkpoku - Bomu Pipeline at Kpite estimated quantity spilled: 14 estimated spill area: 0.0009 latitude: 4.714 longitude: 7.2808056 cause: sabotage cause detail: cleanup / recovery duratiom: 111 terrain: Land delay: |
incident year: 2013 site location name: 20''Otumara-Escravos Pipeline at Ugboegungun estimated quantity spilled: 87 estimated spill area: latitude: 5.6298333 longitude: 5.1611667 cause: sabotage cause detail: cleanup / recovery duratiom: 318 terrain: Swamp delay: |
incident year: 2013 site location name: 24' Bomu – Bonny Pipeline at Mogho estimated quantity spilled: 12 estimated spill area: 0.0001 latitude: 4.6413056 longitude: 7.2776667 cause: sabotage cause detail: cleanup / recovery duratiom: 335 terrain: Land delay: |
incident year: 2011 site location name: Agbada 2 Flowstation Well 2T ROW estimated quantity spilled: 2 estimated spill area: 0.0008 latitude: 4.591639 longitude: 7.031111 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 86 terrain: Land delay: |
incident year: 2014 site location name: 24' Nkpoku - Bomu Pipeline at B-Dere estimated quantity spilled: 14 estimated spill area: 0.0002 latitude: 4.6755 longitude: 7.2766111 cause: sabotage cause detail: cleanup / recovery duratiom: 2 terrain: Land delay: |
incident year: 2013 site location name: 16' Nun-River - Kolo Creek TNP @ Oporoma estimated quantity spilled: 313 estimated spill area: 0.0088 latitude: 4.8063611 longitude: 6.1019444 cause: sabotage cause detail: cleanup / recovery duratiom: 134 terrain: Swamp delay: |
incident year: 2014 site location name: 28' Nkpoku - Bomu Pipeline at Kporghor estimated quantity spilled: 11 estimated spill area: 0 latitude: 4.7189444 longitude: 7.2248333 cause: sabotage cause detail: cleanup / recovery duratiom: 173 terrain: Land delay: |
incident year: 2014 site location name: 28' Nkpoku - Bomu Pipeline at Ekporo estimated quantity spilled: 276 estimated spill area: 0.0005 latitude: 4.7234722 longitude: 7.2197778 cause: sabotage cause detail: cleanup / recovery duratiom: 318 terrain: Land delay: |
incident year: 2014 site location name: 28' Nkpoku - Bomu Pipeline at Ekporo estimated quantity spilled: 234 estimated spill area: 0.0004 latitude: 4.7218056 longitude: 7.2216667 cause: sabotage cause detail: cleanup / recovery duratiom: 316 terrain: Land delay: |
incident year: 2014 site location name: Otumara Well 34 L/S Flowline at Ugboegungun estimated quantity spilled: 2 estimated spill area: latitude: 5.7094444 longitude: 5.3197222 cause: sabotage cause detail: cleanup / recovery duratiom: 55 terrain: Swamp delay: |
incident year: 2014 site location name: 20' Buguma - Alakiri GPHSL Pipeline at Abbiama estimated quantity spilled: 59 estimated spill area: 0.0004 latitude: 4.7458333 longitude: 6.8676667 cause: sabotage cause detail: cleanup / recovery duratiom: 104 terrain: Swamp delay: |
incident year: 2014 site location name: 8' Cawthorne Channel 2 Pipeline at New Calabar River Tigerkiri estimated quantity spilled: 29 estimated spill area: 0.005 latitude: 4.5773056 longitude: 6.9983889 cause: sabotage cause detail: cleanup / recovery duratiom: 169 terrain: Swamp delay: |
incident year: 2014 site location name: 30' Nembe Creek Pipeline at Elem-Kalabari estimated quantity spilled: 236 estimated spill area: 0.0228 latitude: 4.5770833 longitude: 6.9745556 cause: sabotage cause detail: cleanup / recovery duratiom: 154 terrain: Swamp delay: |
incident year: 2014 site location name: 20' Otumara - Escravos Pipeline at Ajudaibo estimated quantity spilled: 5 estimated spill area: latitude: 5.56 longitude: 5.2026389 cause: sabotage cause detail: cleanup / recovery duratiom: 59 terrain: Swamp delay: |
incident year: 2014 site location name: 20'' Otumara - Escravos Pipeline at Ugboegungun. estimated quantity spilled: 10 estimated spill area: latitude: 5.6143889 longitude: 5.1738056 cause: sabotage cause detail: cleanup / recovery duratiom: 264 terrain: Swamp delay: |
incident year: 2014 site location name: Santa Barbara Well 4L/S Flowline at Nembe Bassambiri estimated quantity spilled: 11 estimated spill area: 0.0098 latitude: 4.5401667 longitude: 6.5158889 cause: sabotage cause detail: cleanup / recovery duratiom: 123 terrain: Swamp delay: |
incident year: 2014 site location name: 20'' Otumara - Escravos Pipeline at Ajudiabo. estimated quantity spilled: 26 estimated spill area: latitude: 5.57675 longitude: 5.2069444 cause: sabotage cause detail: cleanup / recovery duratiom: 52 terrain: Swamp delay: |
incident year: 2014 site location name: 28' Nkpoku - Bomu Pipeline at B-Dere estimated quantity spilled: 88 estimated spill area: latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: 160 terrain: Land delay: |
incident year: 2014 site location name: Okordia Manifold at Okordia-Ikarama estimated quantity spilled: 302 estimated spill area: 0.0074 latitude: 5.1541944 longitude: 6.4522778 cause: sabotage cause detail: cleanup / recovery duratiom: 25 terrain: Land delay: |
incident year: 2014 site location name: 12' Imo River II - Ogale Pipeline at Umuedokwara Odagwa. estimated quantity spilled: 8 estimated spill area: 0.0003 latitude: 4.9818056 longitude: 7.1693333 cause: sabotage cause detail: cleanup / recovery duratiom: 95 terrain: Land delay: |
incident year: 2014 site location name: 18' Assa - Rumuekpe Pipeline at Elele Alimini / Ihuaba estimated quantity spilled: 210 estimated spill area: 0.0057 latitude: 5.0535833 longitude: 6.7029167 cause: sabotage cause detail: cleanup / recovery duratiom: 155 terrain: Land delay: |
incident year: 2014 site location name: Diebu Creek Flow Station at Peremabiri estimated quantity spilled: 0.3 estimated spill area: 0.000014 latitude: 4.6599167 longitude: 6.0787778 cause: operational cause detail: (operational and maintenance error ) cleanup / recovery duratiom: 286 terrain: Water delay: other (terrain, floods, ...) |
incident year: 2014 site location name: 24' Nkpoku - Bomu Pipeline at Biara estimated quantity spilled: 16 estimated spill area: 0.0003 latitude: 4.6951667 longitude: 7.2786667 cause: sabotage cause detail: cleanup / recovery duratiom: 171 terrain: Land delay: |
incident year: 2014 site location name: 24' Nkpoku - Bomu Pipeline at Biara estimated quantity spilled: 10 estimated spill area: 0.0004 latitude: 4.6951111 longitude: 7.2781389 cause: sabotage cause detail: cleanup / recovery duratiom: 173 terrain: Land delay: |
incident year: 2014 site location name: Imo River 2 well 28L Well Head Umuedokwara Odagwa estimated quantity spilled: 30 estimated spill area: 0.0018 latitude: 4.9924167 longitude: 7.1636111 cause: sabotage cause detail: cleanup / recovery duratiom: 161 terrain: Land delay: |
incident year: 2012 site location name: 28' Bomu - Bonny Trunklines at K-Dere estimated quantity spilled: 10.1 estimated spill area: 0.0009 latitude: 4.660417 longitude: 7.276833 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 937 terrain: Land delay: community |
incident year: 2014 site location name: 24' Bomu - Bonny Pipeline at Bodo West estimated quantity spilled: 2 estimated spill area: 0 latitude: 4.6065556 longitude: 7.2613056 cause: sabotage cause detail: cleanup / recovery duratiom: 269 terrain: Swamp delay: community |
incident year: 2014 site location name: 20' Otumara - Escravos Pipeline at Adjudiabo estimated quantity spilled: 29 estimated spill area: latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: 36 terrain: Swamp delay: |
incident year: 2014 site location name: 28' Nkpoku - Bomu Trans Niger Pipeline at B-Dere estimated quantity spilled: 646 estimated spill area: latitude: 4.6943611 longitude: 7.2529167 cause: sabotage cause detail: cleanup / recovery duratiom: 261 terrain: Land delay: |
incident year: 2014 site location name: 12' Imo River 2 - Ogale Pipeline at Kom-Kom estimated quantity spilled: 32 estimated spill area: 0.001 latitude: 4.85425 longitude: 7.1611389 cause: sabotage cause detail: cleanup / recovery duratiom: 255 terrain: Land delay: |
incident year: 2014 site location name: 28' Nkpoku - Bomu Trans Niger Pipeline at Kpoghor estimated quantity spilled: 14 estimated spill area: 0.0001 latitude: 4.7185 longitude: 7.2252222 cause: sabotage cause detail: cleanup / recovery duratiom: 109 terrain: Land delay: |
incident year: 2014 site location name: 10' Diebu Creek - Nun River DL at Peremabiri estimated quantity spilled: 275 estimated spill area: 0.3897 latitude: 4.6612222 longitude: 6.0784722 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 352 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2014 site location name: 8' Obigbo North - Komkom Pipeline at Oyigbo estimated quantity spilled: 2 estimated spill area: 0 latitude: 4.8694167 longitude: 7.1354167 cause: sabotage cause detail: cleanup / recovery duratiom: 97 terrain: Land delay: |
incident year: 2014 site location name: 10' Diebu Creek Manifold - Nun River Manifold Pipeline at Premabiri estimated quantity spilled: 106 estimated spill area: 0.0155 latitude: 4.6613611 longitude: 6.0786111 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 339 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2014 site location name: 4' Obelle - Ibaa Pipeline at Omueze - Ibaa estimated quantity spilled: 20 estimated spill area: latitude: 4.9708889 longitude: 6.8042222 cause: sabotage cause detail: cleanup / recovery duratiom: 131 terrain: Land delay: |
incident year: 2014 site location name: 20'' Rumuekpe-Nkpoku Pipeline at Omusunu-Ibaa. estimated quantity spilled: 17 estimated spill area: latitude: 4.9535556 longitude: 6.8373611 cause: sabotage cause detail: cleanup / recovery duratiom: 257 terrain: Land delay: |
incident year: 2014 site location name: Old 24'' Nembe Creek Pipeline at Twoni estimated quantity spilled: 2 estimated spill area: 0.0015 latitude: 4.4811944 longitude: 6.5813333 cause: sabotage cause detail: cleanup / recovery duratiom: 229 terrain: Swamp delay: |
incident year: 2014 site location name: KoloCreek Well 3T Flowline at Otuasega estimated quantity spilled: 18 estimated spill area: latitude: 4.8934167 longitude: 6.3703611 cause: sabotage cause detail: cleanup / recovery duratiom: 240 terrain: Swamp delay: |
incident year: 2012 site location name: Bomu Manifold at K-dere estimated quantity spilled: 5.8 estimated spill area: 0.002 latitude: 4.662889 longitude: 7.277278 cause: operational cause detail: (operational and maintenance error ) cleanup / recovery duratiom: 197 terrain: Land delay: community |
incident year: 2014 site location name: 36' Nkpoku - Bomu Pipeline at Atali estimated quantity spilled: 54 estimated spill area: 0.0014 latitude: 4.8821944 longitude: 7.0704444 cause: sabotage cause detail: cleanup / recovery duratiom: 96 terrain: Land delay: |
incident year: 2013 site location name: 14' Okordia - Rumuekpe Pipeline at Imogu estimated quantity spilled: 210 estimated spill area: 0.0143 latitude: 4.9943611 longitude: 6.6683056 cause: sabotage cause detail: cleanup / recovery duratiom: 226 terrain: Swamp delay: |
incident year: 2013 site location name: 24' Nkpoku - Bomu Pipeline at Nonwa / Bunu estimated quantity spilled: 2249 estimated spill area: 0.0981 latitude: 4.744722 longitude: 7.244 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 223 terrain: Land delay: |
incident year: 2012 site location name: Ebubu Ejema Well 5/9 Flow Line at Ejama estimated quantity spilled: 0.001 estimated spill area: 0 latitude: 4.778444 longitude: 7.152194 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2013 site location name: 6' Ogale -Ebubu Pipeline at Obolo estimated quantity spilled: 5 estimated spill area: latitude: 4.783861 longitude: 7.146778 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 2 terrain: Land delay: |
incident year: 2014 site location name: 4'' NunRiver Well 10T Flowline at Oporoma estimated quantity spilled: 5 estimated spill area: 0.0004 latitude: 4.7967222 longitude: 6.0995556 cause: sabotage cause detail: cleanup / recovery duratiom: 222 terrain: Land delay: |
incident year: 2014 site location name: 28' Nkpoku - Bomu Pipeline at B-Dere estimated quantity spilled: 221 estimated spill area: latitude: 4.6943611 longitude: 7.2528889 cause: sabotage cause detail: cleanup / recovery duratiom: 216 terrain: Land delay: |
incident year: 2014 site location name: 28' Nkpoku - Bomu Trans Niger Pipeline at B-Dere. estimated quantity spilled: 29 estimated spill area: 0 latitude: 4.6903056 longitude: 7.2550556 cause: sabotage cause detail: cleanup / recovery duratiom: 3 terrain: Land delay: |
incident year: 2013 site location name: 6'' Obigbo North - Ebubu Pipeline at Obolo estimated quantity spilled: 9 estimated spill area: 0.0002 latitude: 4.783889 longitude: 7.146778 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 306 terrain: Land delay: |
incident year: 2014 site location name: 30'' Nembe Creek Pipeline at Bille estimated quantity spilled: 5605 estimated spill area: 0.0914 latitude: 4.5678056 longitude: 6.8721111 cause: sabotage cause detail: cleanup / recovery duratiom: 221 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2014 site location name: 28' Nkpoku - Bomu TNP at Ekporo estimated quantity spilled: 157 estimated spill area: 0.0001 latitude: 4.7220278 longitude: 7.2213889 cause: sabotage cause detail: cleanup / recovery duratiom: 164 terrain: Land delay: |
incident year: 2014 site location name: Yokri Well head-79 at Sokebolou estimated quantity spilled: 607 estimated spill area: latitude: 5.42975 longitude: 5.2707222 cause: sabotage cause detail: cleanup / recovery duratiom: 178 terrain: Swamp delay: |
incident year: 2014 site location name: 28' Nkpoku - Bomu TNP at Ekporo estimated quantity spilled: 657 estimated spill area: latitude: 4.7206667 longitude: 7.2228611 cause: sabotage cause detail: cleanup / recovery duratiom: 194 terrain: Land delay: |
incident year: 2014 site location name: 10' Santa Barbara Pipeline at Nembe Bassambiri estimated quantity spilled: 13 estimated spill area: 0.0023 latitude: 4.5044167 longitude: 6.49 cause: sabotage cause detail: cleanup / recovery duratiom: 158 terrain: Swamp delay: |
incident year: 2013 site location name: 6'' Obigbo North - Ebubu pipeline at Obolo estimated quantity spilled: 90 estimated spill area: 0.0039 latitude: 4.7840556 longitude: 7.1474444 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 263 terrain: Land delay: |
incident year: 2014 site location name: Imo River Well1T Flowline at Igiriukwu (Owaza) estimated quantity spilled: 3 estimated spill area: latitude: 4.9808611 longitude: 7.1940833 cause: sabotage cause detail: cleanup / recovery duratiom: 139 terrain: Land delay: |
incident year: 2014 site location name: 10' Diebu Creek Pipeline at Oporoma estimated quantity spilled: 251 estimated spill area: latitude: 4.7956389 longitude: 6.1075278 cause: sabotage cause detail: cleanup / recovery duratiom: 162 terrain: Land delay: |
incident year: 2014 site location name: 28' Bomu - Bonny Pipeline at Owokiri estimated quantity spilled: 166 estimated spill area: 0.003 latitude: 4.5510833 longitude: 7.2486111 cause: sabotage cause detail: cleanup / recovery duratiom: 160 terrain: Land delay: |
incident year: 2014 site location name: 24' CAWC Loop Line at Adamakiri estimated quantity spilled: 43 estimated spill area: 0.02 latitude: 4.541 longitude: 7.0716111 cause: sabotage cause detail: cleanup / recovery duratiom: 164 terrain: Swamp delay: |
incident year: 2014 site location name: 16' Nun River - Kolo Creek Pipeline at Angiama estimated quantity spilled: 296 estimated spill area: 0.0079 latitude: 4.8216944 longitude: 6.1397778 cause: sabotage cause detail: cleanup / recovery duratiom: 269 terrain: Land delay: |
incident year: 2014 site location name: 12”Adibawa-Okordia (Okordia Manifold) estimated quantity spilled: 629 estimated spill area: latitude: 5.1544167 longitude: 6.4521111 cause: sabotage cause detail: cleanup / recovery duratiom: 172 terrain: Land delay: |
incident year: 2011 site location name: 24'' Trans Ramos Pipeline Right of Way at Odimodi estimated quantity spilled: 0 estimated spill area: latitude: 5.217861 longitude: 5.388444 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2011 site location name: Nun River Well 15S Flowline ROW at Onyoma estimated quantity spilled: 2.5 estimated spill area: 0.0006 latitude: 4.786028 longitude: 6.080639 cause: operational cause detail: (operational and maintenance error ) cleanup / recovery duratiom: 65 terrain: Swamp delay: |
incident year: 2011 site location name: Bonny Flow Station at Oloma estimated quantity spilled: 3 estimated spill area: latitude: 4.786056 longitude: 6.080639 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 30 terrain: Water delay: other (terrain, floods, ...) |
incident year: 2012 site location name: 10” Diebu Creek delivery line at Oporoma estimated quantity spilled: 176 estimated spill area: 0.0151 latitude: 4.791333 longitude: 6.107083 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 79 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2012 site location name: Bukuma Well 8 at Bukuma estimated quantity spilled: 0.03 estimated spill area: latitude: 4.736278 longitude: 6.883278 cause: sabotage cause detail: cleanup / recovery duratiom: 304 terrain: Water delay: community |
incident year: 2012 site location name: 24' Nkpoku - Bomu Pipeline at Ogale estimated quantity spilled: 0.92 estimated spill area: 0.00136 latitude: 4.822056 longitude: 7.140639 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 900 terrain: Land delay: community |
incident year: 2012 site location name: 36' Nkpoku-Ogale Pipeline at Akpajo estimated quantity spilled: 136 estimated spill area: 0.0004 latitude: 4.842639 longitude: 7.116583 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 5 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2011 site location name: 24' Alakiri-Bonny GPHSL at Creek 6 and Kalibiama estimated quantity spilled: 0.1 estimated spill area: 0.0003 latitude: 4.50025 longitude: 7.120528 cause: sabotage cause detail: cleanup / recovery duratiom: 66 terrain: Swamp delay: |
incident year: 2011 site location name: Oguta Well 17L at Oguta estimated quantity spilled: 0.1 estimated spill area: 0.000004 latitude: 5.641583 longitude: 6.820667 cause: sabotage cause detail: cleanup / recovery duratiom: 24 terrain: Land delay: |
incident year: 2012 site location name: 28'' Trans Forcados Pipeline at Ugbokodo estimated quantity spilled: 0.1 estimated spill area: latitude: 5.57475 longitude: 5.648667 cause: sabotage cause detail: cleanup / recovery duratiom: 31 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2012 site location name: Obigbo Well 28 L/S Flowline at Umuebulu estimated quantity spilled: 0.1 estimated spill area: 0.000006 latitude: 4.910306 longitude: 7.090944 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: 24' Nkpoku - Bomu Pipeline at Akpajo estimated quantity spilled: 862.6 estimated spill area: 0.0173 latitude: 4.843194 longitude: 7.115889 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 132 terrain: Land delay: |
incident year: 2011 site location name: 8' Obigbo - New Elelenwo Delivery line at Akpajo estimated quantity spilled: 28 estimated spill area: 0.001254 latitude: 4.849806 longitude: 7.113028 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 59 terrain: Land delay: community |
incident year: 2013 site location name: 8' Umuechem - Nkpoku Pipeline at Omusele (Omunwei) estimated quantity spilled: 0.1 estimated spill area: 0.0002 latitude: 4.971167 longitude: 7.025667 cause: sabotage cause detail: cleanup / recovery duratiom: 407 terrain: Land delay: |
incident year: 2013 site location name: 4' Adibawa North East (ADNE) Well 2L Flowline at Biseni estimated quantity spilled: 0.1 estimated spill area: 0.0013 latitude: 5.257194 longitude: 6.5225 cause: sabotage cause detail: cleanup / recovery duratiom: 237 terrain: Land delay: |
incident year: 2013 site location name: Elelenwo Well 9LS wellhead at Elelenwo estimated quantity spilled: 7 estimated spill area: 0.0004 latitude: 4.8563889 longitude: 7.0987222 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 374 terrain: Land delay: |
incident year: 2013 site location name: 20''Otumara-Escravos Pipeline at Ugboegungun estimated quantity spilled: 0.1 estimated spill area: latitude: 5.6136667 longitude: 5.1746389 cause: sabotage cause detail: cleanup / recovery duratiom: 327 terrain: Swamp delay: |
incident year: 2014 site location name: 20'' Otumara - Escravos Pipeline at Ugboegungun estimated quantity spilled: 0.1 estimated spill area: latitude: 5.6148667 longitude: 5.17345 cause: sabotage cause detail: cleanup / recovery duratiom: 43 terrain: Swamp delay: |
incident year: 2014 site location name: 20” Opukushi – Brass Creek Pipeline at Tamogbene estimated quantity spilled: 0.1 estimated spill area: latitude: 4.9410278 longitude: 5.6907222 cause: sabotage cause detail: cleanup / recovery duratiom: 168 terrain: Swamp delay: |
incident year: 2014 site location name: Belema Well 7L Wellhead at Belema estimated quantity spilled: 0.1 estimated spill area: 0.0002 latitude: 4.3933333 longitude: 6.6610833 cause: sabotage cause detail: cleanup / recovery duratiom: 158 terrain: Swamp delay: |
incident year: 2011 site location name: 28' Bomu-Bonny Pipeline at Mogho estimated quantity spilled: 2 estimated spill area: 0.0002 latitude: 4.639778 longitude: 7.277889 cause: sabotage cause detail: cleanup / recovery duratiom: 34 terrain: Land delay: |
incident year: 2011 site location name: Kolo Creek 3T Flowline at Kolo Creek estimated quantity spilled: 0.16 estimated spill area: 0.003 latitude: 4.894944 longitude: 6.361778 cause: sabotage cause detail: cleanup / recovery duratiom: 19 terrain: Land delay: |
incident year: 2012 site location name: 24' Nkpoku - Bomu Trunkline at Egballor estimated quantity spilled: 0.2 estimated spill area: latitude: 4.790583 longitude: 7.178528 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2014 site location name: 28' Nkpoku-Bomu Pipeline at Akpajo estimated quantity spilled: 0.2 estimated spill area: 0.000001 latitude: 4.8313333 longitude: 7.0894167 cause: sabotage cause detail: cleanup / recovery duratiom: 211 terrain: Land delay: |
incident year: 2013 site location name: Kanbo Well 7S Flowline at Egbemodangarabiri / Agbidiama estimated quantity spilled: 4 estimated spill area: latitude: 4.885417 longitude: 5.629 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 228 terrain: Swamp delay: |
incident year: 2011 site location name: Imo River1 Well 59T Flowline at ImoRiver 1 estimated quantity spilled: 0.22 estimated spill area: 0 latitude: 4.99075 longitude: 7.198444 cause: sabotage cause detail: cleanup / recovery duratiom: 3 terrain: Land delay: |
incident year: 2011 site location name: 18” Assa–Rumuekpe Trunkline at Awara estimated quantity spilled: 0.72 estimated spill area: 0.0025 latitude: 5.348611 longitude: 6.795222 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: Cawthorne Channel 2 Well 32S Flowline at Cawthorne Channel estimated quantity spilled: 3 estimated spill area: latitude: 4.549944 longitude: 7.012083 cause: sabotage cause detail: cleanup / recovery duratiom: 69 terrain: Swamp delay: |
incident year: 2011 site location name: Imo River Well 28L Flowline at Umuedeokware. estimated quantity spilled: 1.05 estimated spill area: latitude: 4.991792 longitude: 7.163333 cause: sabotage cause detail: cleanup / recovery duratiom: 125 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2011 site location name: Ubie Well 4S Flowline at Ubie estimated quantity spilled: 1 estimated spill area: latitude: 5.103778 longitude: 6.555083 cause: sabotage cause detail: cleanup / recovery duratiom: 58 terrain: Land delay: |
incident year: 2011 site location name: Nun River Well 15 Flowline at Nun River estimated quantity spilled: 2.95 estimated spill area: latitude: 4.790333 longitude: 6.083583 cause: sabotage cause detail: cleanup / recovery duratiom: 68 terrain: Swamp / Land delay: |
incident year: 2011 site location name: Obigbo Well 20T Flowline at Umuebule estimated quantity spilled: 1.3 estimated spill area: latitude: 4.886833 longitude: 7.129333 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 25 terrain: Land delay: |
incident year: 2011 site location name: 10'' Ogini-Eriemu delivery line at Ogini estimated quantity spilled: 0.14 estimated spill area: latitude: 5.569944 longitude: 6.750972 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2012 site location name: Obigbo Flowline Gathering Manifold at Umuwalia estimated quantity spilled: 1 estimated spill area: 0.00002 latitude: 4.89225 longitude: 7.121361 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 95 terrain: Land delay: community |
incident year: 2012 site location name: Obigbo Well 3L Flowline at Umuebulu estimated quantity spilled: 0.11 estimated spill area: 0.00002 latitude: 4.892583 longitude: 7.121472 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: Imo River Well 59T Flowline at Igiriukwu estimated quantity spilled: 4.62 estimated spill area: 0.0077 latitude: 4.991556 longitude: 7.195 cause: sabotage cause detail: cleanup / recovery duratiom: 86 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2011 site location name: 4' Obele pipeline at Ibaa estimated quantity spilled: 2.5 estimated spill area: 0.000415 latitude: 4.966722 longitude: 6.803778 cause: sabotage cause detail: cleanup / recovery duratiom: 8 terrain: Land delay: community |
incident year: 2011 site location name: Kanbo Well 5L Right of Way estimated quantity spilled: 17.93 estimated spill area: latitude: 4.904028 longitude: 5.651472 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 175 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2013 site location name: Kanbo Well 5L Flowline Right of Way estimated quantity spilled: 4 estimated spill area: latitude: 4.908778 longitude: 5.663667 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 163 terrain: Swamp delay: |
incident year: 2012 site location name: Opukushi Well 24T Flowline ROW estimated quantity spilled: 106.3 estimated spill area: 0.007167 latitude: 4.908833 longitude: 5.804139 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 111 terrain: Swamp delay: |
incident year: 2011 site location name: Imo River Well 37L Flowline at Igiriukwu Owaza estimated quantity spilled: 0.7 estimated spill area: 0.0012 latitude: 4.987306 longitude: 7.204056 cause: sabotage cause detail: cleanup / recovery duratiom: 43 terrain: Land delay: |
incident year: 2013 site location name: Opukushi Well 24T Flowline estimated quantity spilled: 11 estimated spill area: latitude: 4.919889 longitude: 5.743556 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 115 terrain: Swamp delay: |
incident year: 2011 site location name: Akaso Well 10L Flowline at Cawthorne Channel estimated quantity spilled: 0.4 estimated spill area: 0.0001 latitude: 4.548611 longitude: 7.047056 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2013 site location name: 4' Abada 69 S Flowline at Umuokwa estimated quantity spilled: 5 estimated spill area: 0.0001 latitude: 4.9335278 longitude: 7.0531389 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 366 terrain: Land delay: |
incident year: 2011 site location name: 20' Buguma-Alakiri trunkline at Abiama estimated quantity spilled: 0.84 estimated spill area: 0.000046 latitude: 4.746722 longitude: 6.874528 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2013 site location name: Agbada II Well 66L Flowline at Umuokwa estimated quantity spilled: 8 estimated spill area: 0.000075 latitude: 4.936583 longitude: 7.054167 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 447 terrain: Land delay: |
incident year: 2011 site location name: 16' Egbema-Assa Pipeline at Assa estimated quantity spilled: 0.75 estimated spill area: 0.000024 latitude: 5.380667 longitude: 6.796028 cause: sabotage cause detail: cleanup / recovery duratiom: 2 terrain: Land delay: |
incident year: 2012 site location name: 8' Etelebou - Kolo-Creek Pipeline at Biogbolo. estimated quantity spilled: 5.7 estimated spill area: 0.0003 latitude: 4.941222 longitude: 6.357361 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 48 terrain: Swamp delay: community |
incident year: 2011 site location name: 8' Obigbo North Pipeline at Obigbo estimated quantity spilled: 0.8 estimated spill area: 0.00003 latitude: 4.851806 longitude: 7.124194 cause: sabotage cause detail: cleanup / recovery duratiom: 36 terrain: Land delay: |
incident year: 2011 site location name: 20' Kolocreek-Rumuekpe Pipeline at Ogbogolo estimated quantity spilled: 36 estimated spill area: 0.00203 latitude: 4.946783 longitude: 6.555292 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 57 terrain: Land delay: |
incident year: 2011 site location name: Adibawa Well 10 S Flowline at Edagberi estimated quantity spilled: 1 estimated spill area: 0.00015 latitude: 5.198111 longitude: 6.503139 cause: sabotage cause detail: cleanup / recovery duratiom: 66 terrain: Land delay: |
incident year: 2011 site location name: Akaso Well 10S Flowline at Mbiama estimated quantity spilled: 0.81 estimated spill area: 0.0003 latitude: 4.529222 longitude: 7.033028 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2011 site location name: 6' Obigbo North - Ogale Pipeline at Ogale estimated quantity spilled: 0.95 estimated spill area: 0.000001 latitude: 4.8345 longitude: 7.155917 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: 6' Obigbo North Pipeline at Ogale estimated quantity spilled: 0.41 estimated spill area: 0.000001 latitude: 4.834417 longitude: 7.155917 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: 6' Obigbo North Pipeline at Ogale estimated quantity spilled: 0.87 estimated spill area: 0.000047 latitude: 4.834556 longitude: 7.156 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: 6' Obigbo - Ogale Condensate line at Komkom estimated quantity spilled: 0.22 estimated spill area: 0 latitude: 4.845722 longitude: 7.157306 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: 6' Obigbo - North Pipeline at Ogale estimated quantity spilled: 0.6 estimated spill area: 0.0001 latitude: 4.831222 longitude: 7.155583 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: 6' Obigbo North - Ogale Pipeline at Komkom estimated quantity spilled: 0.8 estimated spill area: 0.0002 latitude: 4.842694 longitude: 7.157 cause: sabotage cause detail: cleanup / recovery duratiom: 41 terrain: Land delay: |
incident year: 2011 site location name: 20' Kolocreek-Rumuekpe Pipeline at Ogbogolo estimated quantity spilled: 82.6 estimated spill area: latitude: 4.946806 longitude: 6.555278 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 77 terrain: Land delay: |
incident year: 2011 site location name: Rumuekpe Flow Station at Rumuekpe estimated quantity spilled: 1 estimated spill area: 0.0001 latitude: 4.980194 longitude: 6.687389 cause: operational cause detail: (operational and maintenance error ) cleanup / recovery duratiom: 2 terrain: Land delay: |
incident year: 2011 site location name: Akaso Well 13L Flowline at Akaso estimated quantity spilled: 1 estimated spill area: latitude: 4.54975 longitude: 7.046861 cause: sabotage cause detail: cleanup / recovery duratiom: 34 terrain: Swamp delay: |
incident year: 2011 site location name: Bonny Well 12S Flowline estimated quantity spilled: 1 estimated spill area: latitude: 4.466306 longitude: 7.186333 cause: sabotage cause detail: cleanup / recovery duratiom: 63 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2011 site location name: Imo River Well 56 L Flowline at Isietitioha estimated quantity spilled: 1 estimated spill area: 0.0002 latitude: 4.972972 longitude: 7.181306 cause: sabotage cause detail: cleanup / recovery duratiom: 46 terrain: Land delay: |
incident year: 2011 site location name: 24' Nkpoku - Bomu Pipeline at Biara estimated quantity spilled: 0.23 estimated spill area: 0.000014 latitude: 4.703556 longitude: 7.279528 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: 16' Egbema-Assa Pipeline at Assa estimated quantity spilled: 0.8 estimated spill area: 0.0008 latitude: 5.380694 longitude: 6.796083 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: 8” Nkali – Imo River Pipeline Odagwa estimated quantity spilled: 2.5 estimated spill area: 0.000193 latitude: 4.98725 longitude: 7.160917 cause: sabotage cause detail: cleanup / recovery duratiom: 67 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2011 site location name: 12' Imo River 2 - Ebubu Pipeline at Odagwa estimated quantity spilled: 0.26 estimated spill area: 0 latitude: 4.980861 longitude: 7.170278 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2012 site location name: Imo River 3 Well 5 W/h Location at Igrukwu estimated quantity spilled: 21.5 estimated spill area: latitude: 4.983806 longitude: 7.178583 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 294 terrain: Land delay: |
incident year: 2011 site location name: 12' Imo River 1 - Ogale Pipeline at Owaza estimated quantity spilled: 1.94 estimated spill area: 0.00003 latitude: 4.926528 longitude: 7.184472 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: Saver Pit Oveflow (Obelle FS) estimated quantity spilled: 3.26 estimated spill area: 0.0001 latitude: 5.007639 longitude: 6.809583 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 86 terrain: Land delay: community |
incident year: 2011 site location name: 12' Imo River1 - Ogale Pipeline @ Komkom estimated quantity spilled: 2.2 estimated spill area: 0.000049 latitude: 4.868333 longitude: 7.212861 cause: sabotage cause detail: cleanup / recovery duratiom: 32 terrain: Swamp delay: |
incident year: 2013 site location name: Benisede Well 17S Flowline at Ojobo estimated quantity spilled: 0.1 estimated spill area: latitude: 5.0079167 longitude: 5.6916111 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 195 terrain: Swamp delay: |
incident year: 2011 site location name: Ubefan Well 2 estimated quantity spilled: 85 estimated spill area: 13 latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2011 site location name: Akaso Well 3S FL at Cawthorne Channel estimated quantity spilled: 1.5 estimated spill area: 0.0001 latitude: 4.546528 longitude: 7.046694 cause: sabotage cause detail: cleanup / recovery duratiom: 74 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2011 site location name: Umuechem Well 22T Flowline located at Umuechem estimated quantity spilled: 5.1 estimated spill area: 0.000142 latitude: 5.011806 longitude: 7.017333 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 8 terrain: Land delay: |
incident year: 2011 site location name: 18' Assa-Rumuekpe Pipeline at Awara estimated quantity spilled: 1.4 estimated spill area: 0.0004 latitude: 5.287889 longitude: 6.781222 cause: sabotage cause detail: cleanup / recovery duratiom: 57 terrain: Land delay: |
incident year: 2011 site location name: 24' Nembe Creek Trunkline (old NCTL) Pipeline at Tora-Twenikiri estimated quantity spilled: 1.08 estimated spill area: 0.0146 latitude: 4.482389 longitude: 6.535167 cause: sabotage cause detail: cleanup / recovery duratiom: 20 terrain: Swamp delay: |
incident year: 2012 site location name: 16' Egbema - Assa Trunk line at Obille estimated quantity spilled: 1.3 estimated spill area: 0.0001 latitude: 5.395667 longitude: 6.789667 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: 18' Soku-Ekulama Pipeline at Kirikakiri estimated quantity spilled: 1.3 estimated spill area: 0.004495 latitude: 4.570306 longitude: 6.672278 cause: sabotage cause detail: cleanup / recovery duratiom: 11 terrain: Swamp delay: |
incident year: 2012 site location name: 28' Nkpoku - Bomu Pipelline at B-Dere estimated quantity spilled: 0.22 estimated spill area: 0.000017 latitude: 4.697611 longitude: 7.249083 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2012 site location name: 6' Obigbo North - Ogale delivery line at Ogale estimated quantity spilled: 1.2 estimated spill area: 0.0004 latitude: 4.828917 longitude: 7.156083 cause: sabotage cause detail: cleanup / recovery duratiom: 33 terrain: Land delay: |
incident year: 2012 site location name: Diebu Creek Well 15T Flow Line at Diebu Creek estimated quantity spilled: 2 estimated spill area: latitude: 4.655167 longitude: 6.071806 cause: sabotage cause detail: cleanup / recovery duratiom: 36 terrain: Swamp delay: |
incident year: 2011 site location name: Etelebou Well 8T Flowline at Ogboloma estimated quantity spilled: 4.05 estimated spill area: latitude: 5.022111 longitude: 6.34725 cause: operational cause detail: cleanup / recovery duratiom: 20 terrain: Land delay: |
incident year: 2013 site location name: 14' Okordia - Rumuekpe Pipeline at Ikarama estimated quantity spilled: 6 estimated spill area: 0.000271 latitude: 5.136333 longitude: 6.467833 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 370 terrain: Land delay: |
incident year: 2013 site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama estimated quantity spilled: 3 estimated spill area: 0.000258 latitude: 5.146889 longitude: 6.458611 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 449 terrain: Land delay: |
incident year: 2011 site location name: 12' Adibawa - Okordia Pipeline at Ikarama estimated quantity spilled: 62.2 estimated spill area: 0.0028 latitude: 5.154056 longitude: 6.455889 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 104 terrain: Land delay: |
incident year: 2012 site location name: 24' Bomu - Bonny Pipeline at Mogho estimated quantity spilled: 1.3 estimated spill area: 0.000043 latitude: 4.647167 longitude: 7.277361 cause: sabotage cause detail: cleanup / recovery duratiom: 2 terrain: Land delay: |
incident year: 2011 site location name: Akaso Well 3L Flowline at Akaso estimated quantity spilled: 1.9 estimated spill area: 0.0001 latitude: 4.542611 longitude: 7.045306 cause: sabotage cause detail: cleanup / recovery duratiom: 4 terrain: Swamp delay: |
incident year: 2012 site location name: Ubie Well 9S Flowline at Ubie estimated quantity spilled: 1 estimated spill area: 0.000042 latitude: 5.112472 longitude: 6.541167 cause: sabotage cause detail: cleanup / recovery duratiom: 58 terrain: Land delay: |
incident year: 2012 site location name: 4' Nkali Well 10L Flowline at Odagwa 2 estimated quantity spilled: 3.9 estimated spill area: 0.0047 latitude: 4.978306 longitude: 7.10025 cause: sabotage cause detail: cleanup / recovery duratiom: 214 terrain: Land delay: |
incident year: 2012 site location name: Ahia Well 3S Flowline at Ahia at Umudioga estimated quantity spilled: 0.3 estimated spill area: 0.000009 latitude: 5.195556 longitude: 6.759472 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2012 site location name: 12' Adibawa - Okordia delivery line at Edegbari estimated quantity spilled: 0.3 estimated spill area: 0.0003 latitude: 5.169417 longitude: 6.475444 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 30 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2012 site location name: Imo River 1 Well 26L Flowline at Owaza estimated quantity spilled: 1.3 estimated spill area: 0.00008 latitude: 4.979833 longitude: 7.178639 cause: sabotage cause detail: cleanup / recovery duratiom: 14 terrain: Land delay: |
incident year: 2012 site location name: ImoR-2 Well 28L FLV (Flow line valve) estimated quantity spilled: 0.053 estimated spill area: latitude: 5.404111 longitude: 6.786083 cause: sabotage cause detail: cleanup / recovery duratiom: 68 terrain: Land delay: |
incident year: 2013 site location name: Forcados Crude Loading Platform estimated quantity spilled: 1 estimated spill area: latitude: 5.1706944 longitude: 5.1640833 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: terrain: Water delay: |
incident year: 2012 site location name: Obigbo Well 28L/S Flowline at Obigbo estimated quantity spilled: 0.4 estimated spill area: 0.00005 latitude: 4.920278 longitude: 7.076778 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2013 site location name: Adibawa North East Flowline at Biseni estimated quantity spilled: 8 estimated spill area: 0.0015 latitude: 5.21325 longitude: 6.517583 cause: operational cause detail: (sabotage) cleanup / recovery duratiom: 528 terrain: Land delay: cause of spill dispute |
incident year: 2012 site location name: Imo River 1 Well 59T Flowline at Igiriukwu estimated quantity spilled: 1.4 estimated spill area: 0.000045 latitude: 4.987167 longitude: 7.204194 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2012 site location name: Imo River 1 Well 59T Flowline RoW at Owaza estimated quantity spilled: 4.3 estimated spill area: 0.0001 latitude: 4.987472 longitude: 7.203833 cause: sabotage cause detail: cleanup / recovery duratiom: 89 terrain: Land delay: |
incident year: 2013 site location name: Biseni Remote Manifold estimated quantity spilled: 49 estimated spill area: 0.00022 latitude: 5.257111 longitude: 6.52275 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 474 terrain: Land delay: community |
incident year: 2012 site location name: 18' Assa - Rumuekpe Trunkline at Awara estimated quantity spilled: 48 estimated spill area: 0.0015 latitude: 5.287917 longitude: 6.781167 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 10 terrain: Land delay: |
incident year: 2012 site location name: Umuechem Well 12L Flowline at Umuechem estimated quantity spilled: 1 estimated spill area: 0.0001 latitude: 5.109278 longitude: 7.016472 cause: sabotage cause detail: cleanup / recovery duratiom: 231 terrain: Swamp delay: |
incident year: 2012 site location name: 24' Bomu - Bonny Pipeline at Bodo West estimated quantity spilled: estimated spill area: latitude: 4.577278 longitude: 7.255417 cause: yet to be determined cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2012 site location name: 4' Obele - Ibaa Pipeline at Ibaa. estimated quantity spilled: 6.1 estimated spill area: 0.002 latitude: 4.974389 longitude: 6.804722 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: 6' Imo River Well 59T Flowline at Igiriukwa estimated quantity spilled: 2.7 estimated spill area: 0.000227 latitude: 4.992 longitude: 7.195639 cause: sabotage cause detail: cleanup / recovery duratiom: 49 terrain: Land delay: |
incident year: 2012 site location name: 8” Umuechem – Nkpoku Delivery Line at Umuwenye estimated quantity spilled: 3 estimated spill area: 0.0006 latitude: 4.980361 longitude: 7.024972 cause: sabotage cause detail: cleanup / recovery duratiom: 63 terrain: Land delay: |
incident year: 2012 site location name: 18' Assa - Rumuekpe Trunkline at Awara estimated quantity spilled: 2 estimated spill area: 0.0001 latitude: 5.349528 longitude: 6.795417 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 8 terrain: Land delay: |
incident year: 2012 site location name: 12' Imo River II - Ogale Pipeline at Owaza. estimated quantity spilled: 1 estimated spill area: 0 latitude: 4.936583 longitude: 7.184694 cause: sabotage cause detail: cleanup / recovery duratiom: 52 terrain: Land delay: |
incident year: 2012 site location name: 12' Imo River II - Ogale Pipeline at Owaza. estimated quantity spilled: 1 estimated spill area: 0 latitude: 4.933889 longitude: 7.184639 cause: sabotage cause detail: cleanup / recovery duratiom: 50 terrain: Land delay: |
incident year: 2012 site location name: 8' Cawthorne Channel II Pipeline at Tigerkiri estimated quantity spilled: 7 estimated spill area: 0.2279 latitude: 4.577167 longitude: 6.998389 cause: sabotage cause detail: cleanup / recovery duratiom: 405 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2012 site location name: 24' Alakiri-Bonny GPHSL at Fusokiri estimated quantity spilled: 7 estimated spill area: 0.0059 latitude: 4.500222 longitude: 7.120889 cause: sabotage cause detail: cleanup / recovery duratiom: 70 terrain: Swamp delay: |
incident year: 2012 site location name: Awoba Well 8T at Awoba estimated quantity spilled: estimated spill area: latitude: ND longitude: ND cause: yet to be determined cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2012 site location name: 24' Bomu - Bonny Trans Niger Pipeline at Mogho estimated quantity spilled: 16 estimated spill area: 0.003219 latitude: 4.644889 longitude: 7.277528 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2012 site location name: 36' Nkpoku - Bomu Trunkline at Eneka. estimated quantity spilled: 1 estimated spill area: 0.00003 latitude: 4.917639 longitude: 7.028306 cause: sabotage cause detail: cleanup / recovery duratiom: 72 terrain: Land delay: |
incident year: 2012 site location name: 36' Nkpoku - Bomu Trans Niger Pipeline at Agbonchia estimated quantity spilled: 3.5 estimated spill area: 0.000068 latitude: 4.837056 longitude: 7.123139 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2013 site location name: Assa Manifold estimated quantity spilled: 1.24 estimated spill area: 0.000359 latitude: 5.369194 longitude: 6.800028 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 1 terrain: Land delay: |
incident year: 2012 site location name: Nkali Well 10L flow line Right of Way estimated quantity spilled: 4.1 estimated spill area: 0.0003 latitude: 4.978444 longitude: 7.10025 cause: sabotage cause detail: cleanup / recovery duratiom: 111 terrain: Land delay: |
incident year: 2012 site location name: Imo River 3 Well 33 L Wellhead at Owaza estimated quantity spilled: 0.5 estimated spill area: 0.000088 latitude: 4.979028 longitude: 7.200083 cause: sabotage cause detail: cleanup / recovery duratiom: 41 terrain: Land delay: |
incident year: 2014 site location name: Forcados Estuary Well 15L (JB Well Cluster) at Ogulagha estimated quantity spilled: 5 estimated spill area: latitude: 5.3831944 longitude: 5.29425 cause: operational cause detail: (operational and maintenance error ) cleanup / recovery duratiom: 71 terrain: Water delay: |
incident year: 2011 site location name: 10'' Kokori Pipeline at Idjerhe estimated quantity spilled: 3.5 estimated spill area: latitude: 5.583571 longitude: 6.066698 cause: sabotage cause detail: cleanup / recovery duratiom: 32 terrain: Land delay: |
incident year: 2012 site location name: 20' Buguma - Alakiri TL at Daily Bread (Bukuma) estimated quantity spilled: 2.4 estimated spill area: 0.001 latitude: 4.743056 longitude: 6.90825 cause: sabotage cause detail: cleanup / recovery duratiom: 58 terrain: Swamp delay: |
incident year: 2012 site location name: Ubie Well 5L Flow line at Ubie estimated quantity spilled: 3.8 estimated spill area: latitude: 5.113194 longitude: 6.553472 cause: sabotage cause detail: cleanup / recovery duratiom: 54 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2012 site location name: 16' Egbema - Assa Trunkline at Assa estimated quantity spilled: 0.5 estimated spill area: 0.0001 latitude: 5.39 longitude: 6.792583 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 22 terrain: Land delay: |
incident year: 2012 site location name: 20’’ Otumara – Escravos Trunkline at Adjudaibo estimated quantity spilled: 574 estimated spill area: latitude: 5.568611 longitude: 5.205361 cause: sabotage cause detail: cleanup / recovery duratiom: 137 terrain: Swamp delay: |
incident year: 2011 site location name: 8'' Northbank - Northbank tie-in Manifold estimated quantity spilled: 77.1 estimated spill area: latitude: 5.410361 longitude: 5.322778 cause: operational cause detail: (operational and maintenance error ) cleanup / recovery duratiom: 151 terrain: Swamp delay: |
incident year: 2012 site location name: 24' Nkpoku-Bonny Pipeline at Biara estimated quantity spilled: 3 estimated spill area: 0.00005 latitude: 4.703806 longitude: 7.279639 cause: sabotage cause detail: cleanup / recovery duratiom: 347 terrain: Land delay: |
incident year: 2013 site location name: Awoba Well 3S Flowline at Bille estimated quantity spilled: 2 estimated spill area: latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: 98 terrain: Swamp delay: |
incident year: 2013 site location name: 4' Ubie Well 4S Flowline at Idu Ekpeye estimated quantity spilled: 2 estimated spill area: 0.00345 latitude: 5.104194 longitude: 6.555167 cause: sabotage cause detail: cleanup / recovery duratiom: 105 terrain: Land delay: |
incident year: 2013 site location name: 4' Adibawa North East (ADNE) Well 10S Flowline at Edagberi/Betterland estimated quantity spilled: 0.2 estimated spill area: 0.0002 latitude: 5.203306 longitude: 6.516694 cause: sabotage cause detail: cleanup / recovery duratiom: 125 terrain: Land delay: |
incident year: 2011 site location name: 10'' Utorogu-Ughelli Pumping Station Pipeline at Otu-Jeremi estimated quantity spilled: 0.05 estimated spill area: latitude: 5.438639 longitude: 5.88375 cause: operational cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2013 site location name: 6' Imo River Well 59T Flowline at Igiriukwu estimated quantity spilled: 3 estimated spill area: 0.0002 latitude: 4.99175 longitude: 7.1952222 cause: sabotage cause detail: cleanup / recovery duratiom: 170 terrain: Land delay: |
incident year: 2013 site location name: 4' Ubie Well 5L Flowline at Idu Ekpeye estimated quantity spilled: 3 estimated spill area: 0 latitude: 5.111028 longitude: 6.557417 cause: sabotage cause detail: cleanup / recovery duratiom: 111 terrain: Land delay: |
incident year: 2012 site location name: 28' Nkpoku -Bomu Pipeline at Kpoghor estimated quantity spilled: 4 estimated spill area: 0.0001 latitude: 4.72 longitude: 7.223583 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2013 site location name: 4' Adibawa Well 10S Flowline at Edagberi estimated quantity spilled: 4 estimated spill area: latitude: 5.2045 longitude: 6.549917 cause: sabotage cause detail: cleanup / recovery duratiom: 100 terrain: Land delay: |
incident year: 2011 site location name: 6' Utorogu - Ughelli West Gasline at Iwhrekan estimated quantity spilled: 6.65 estimated spill area: latitude: 5.443889 longitude: 5.885917 cause: operational cause detail: cleanup / recovery duratiom: 99 terrain: Land delay: |
incident year: 2011 site location name: Ogini Well 9T Flowline at Ovrode/Ellu estimated quantity spilled: 4.4 estimated spill area: latitude: 5.572194 longitude: 6.318917 cause: sabotage cause detail: cleanup / recovery duratiom: 27 terrain: Land delay: |
incident year: 2013 site location name: Diebu Creek Well 15T Flowline at Peremabiri estimated quantity spilled: 0.7 estimated spill area: 0.0003 latitude: 4.655167 longitude: 6.071833 cause: sabotage cause detail: cleanup / recovery duratiom: 189 terrain: Land delay: |
incident year: 2013 site location name: Obigbo Well 9L Flow line at Umuebulu estimated quantity spilled: 2 estimated spill area: 0.00001 latitude: 4.890222 longitude: 7.124861 cause: sabotage cause detail: cleanup / recovery duratiom: 166 terrain: Land delay: |
incident year: 2013 site location name: 18' Assa - Rumuekpe Pipeline at Elele-Alimini estimated quantity spilled: 1 estimated spill area: 0.00002 latitude: 5.102139 longitude: 6.724528 cause: sabotage cause detail: cleanup / recovery duratiom: 216 terrain: Land delay: |
incident year: 2013 site location name: 4' Awoba North West Well 1L and 1S Flowlines at Boro estimated quantity spilled: 21 estimated spill area: latitude: 4.561056 longitude: 6.751611 cause: sabotage cause detail: cleanup / recovery duratiom: 117 terrain: Swamp delay: |
incident year: 2013 site location name: 18' Assa - Rumuekpe Trunkline at Awara estimated quantity spilled: 1 estimated spill area: 0.000057 latitude: 5.316278 longitude: 6.78775 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2013 site location name: Ubie Well 4S Flowline at Iduekpeye estimated quantity spilled: 0.4 estimated spill area: 0.000052 latitude: 5.098833 longitude: 6.546778 cause: sabotage cause detail: cleanup / recovery duratiom: 309 terrain: Land delay: |
incident year: 2013 site location name: 36'' Nkpoku-Bomu Pipeline at Agbonchia estimated quantity spilled: 3 estimated spill area: 0.00011 latitude: 4.839444 longitude: 7.120361 cause: sabotage cause detail: cleanup / recovery duratiom: 4 terrain: Land delay: |
incident year: 2013 site location name: 18' Assa - Rumuekpe Trunkline at Egbeda estimated quantity spilled: 0.9 estimated spill area: 0.000002 latitude: 5.240556 longitude: 6.770056 cause: sabotage cause detail: cleanup / recovery duratiom: 139 terrain: Land delay: |
incident year: 2013 site location name: 4' Cawthorne Channel 1 Well 49L Flowline at Mbiama. estimated quantity spilled: 2 estimated spill area: 0.001 latitude: 4.590472 longitude: 7.039333 cause: sabotage cause detail: cleanup / recovery duratiom: 120 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2013 site location name: 24' Nkpoku - Bomu Pipeline at Bera estimated quantity spilled: 2 estimated spill area: 0.000052 latitude: 4.685972 longitude: 7.27775 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2013 site location name: 4' Nembe 1 Well 23T Flowline at Ewesuo estimated quantity spilled: 14 estimated spill area: latitude: 4.456472 longitude: 6.308528 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2013 site location name: 24' Bomu - Bonny Trans Niger Pipeline at Bodo City. estimated quantity spilled: 11 estimated spill area: 0.0016 latitude: 4.570233 longitude: 7.255072 cause: sabotage cause detail: cleanup / recovery duratiom: 804 terrain: Swamp delay: |
incident year: 2013 site location name: 6' Yokri Manifold 7 Low Pressure 1 Line estimated quantity spilled: 1 estimated spill area: latitude: 5.448889 longitude: 5.224556 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2013 site location name: 36' Nkpoku - Bomu Pipeline at Elelenwo estimated quantity spilled: 8 estimated spill area: 0.000013 latitude: 4.857139 longitude: 7.099667 cause: sabotage cause detail: cleanup / recovery duratiom: 75 terrain: Land delay: |
incident year: 2013 site location name: 36' Nkpoku - Bomu Pipeline at Akpajo estimated quantity spilled: 8 estimated spill area: latitude: 4.851472 longitude: 7.106194 cause: sabotage cause detail: cleanup / recovery duratiom: 302 terrain: Land delay: |
incident year: 2013 site location name: 6' Kolo Creek Well 20T Flowline at Otuasega estimated quantity spilled: 2 estimated spill area: latitude: 4.892167 longitude: 6.370389 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: 36' Rumuekpe-Nkpoku Pipeline @ Aluu estimated quantity spilled: 6.6 estimated spill area: 0.004 latitude: 4.944778 longitude: 6.939694 cause: sabotage cause detail: cleanup / recovery duratiom: 34 terrain: Land delay: |
incident year: 2013 site location name: 24' Nkpoku - Bomu Pipeline at Biara estimated quantity spilled: 4 estimated spill area: 0.0002 latitude: 4.690139 longitude: 7.278139 cause: sabotage cause detail: cleanup / recovery duratiom: 311 terrain: Land delay: |
incident year: 2013 site location name: 18' Assa - Rumuekpe Pipeline at Awara estimated quantity spilled: 0.4 estimated spill area: 0.000001 latitude: 5.318889 longitude: 6.788361 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2013 site location name: 36' Rumuekpe-Nkpoku pipeline at Aluu estimated quantity spilled: 4 estimated spill area: 0.0003 latitude: 4.945667 longitude: 6.937389 cause: sabotage cause detail: cleanup / recovery duratiom: 177 terrain: Land delay: |
incident year: 2013 site location name: 24'' Nkpoku - Bomu TNP at Rumuowegwu-Eneka estimated quantity spilled: 6 estimated spill area: 0.000213 latitude: 4.895722 longitude: 7.054806 cause: sabotage cause detail: cleanup / recovery duratiom: 115 terrain: Land delay: |
incident year: 2013 site location name: 24' Bomu - Bonny TNP at Owokiri estimated quantity spilled: 16 estimated spill area: latitude: 4.561083 longitude: 7.252 cause: sabotage cause detail: cleanup / recovery duratiom: 508 terrain: Swamp delay: |
incident year: 2013 site location name: 24' Bomu - Bonny Trans Niger Pipeline at Otokomabie / Oloma estimated quantity spilled: 12 estimated spill area: 0.0154 latitude: 4.478333 longitude: 7.206194 cause: sabotage cause detail: cleanup / recovery duratiom: 133 terrain: Swamp delay: |
incident year: 2013 site location name: 12' Adibawa - Okordia DL at Ikarama (old line) estimated quantity spilled: 1.8 estimated spill area: latitude: 5.16575 longitude: 6.470528 cause: sabotage cause detail: cleanup / recovery duratiom: 71 terrain: Land delay: |
incident year: 2013 site location name: 12' Imo River - Ogale Pipeline at Owaza estimated quantity spilled: 0.8 estimated spill area: 0.00003 latitude: 4.9690833 longitude: 7.1851389 cause: sabotage cause detail: cleanup / recovery duratiom: 168 terrain: Land delay: |
incident year: 2013 site location name: 3' Imo River Well 5L Flowline at Igiriukwu estimated quantity spilled: 10 estimated spill area: 0.00048 latitude: 4.982222 longitude: 7.178556 cause: sabotage cause detail: cleanup / recovery duratiom: 374 terrain: Land delay: |
incident year: 2012 site location name: 16' Egbema - Assa Trunkline at Umudike estimated quantity spilled: 155 estimated spill area: 0.0039 latitude: 5.449778 longitude: 6.766667 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 32 terrain: Land delay: community |
incident year: 2011 site location name: Yokri Well 114S flowline estimated quantity spilled: 3 estimated spill area: latitude: 5.454722 longitude: 5.233278 cause: operational cause detail: cleanup / recovery duratiom: 172 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2012 site location name: 24' Nkpoku - Bomu Pipeline at Egbalor estimated quantity spilled: 5 estimated spill area: 0.001041 latitude: 4.788 longitude: 7.183222 cause: sabotage cause detail: cleanup / recovery duratiom: 184 terrain: Land delay: |
incident year: 2013 site location name: 4' Nun River Well 13T Flowline at Oporoma estimated quantity spilled: 0.7 estimated spill area: 0 latitude: 4.806583 longitude: 6.101694 cause: sabotage cause detail: cleanup / recovery duratiom: 98 terrain: Land delay: |
incident year: 2013 site location name: 24' Nkpoku- Bomu Pipeline at B-Dere estimated quantity spilled: 2 estimated spill area: latitude: 4.675472 longitude: 7.276639 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2013 site location name: 24' Nkpoku - Bomu Trans Niger Pipeline at Eteo estimated quantity spilled: 5 estimated spill area: 0.0003 latitude: 4.779056 longitude: 7.198361 cause: sabotage cause detail: cleanup / recovery duratiom: 102 terrain: Land delay: |
incident year: 2011 site location name: 16'' UPS - Utorogu T/L at Iwhrekan estimated quantity spilled: 9.03 estimated spill area: latitude: 5.454917 longitude: 5.89 cause: operational cause detail: (sabotage) cleanup / recovery duratiom: 176 terrain: Land delay: |
incident year: 2013 site location name: 6' Cawthorne Channel Well 45T Flowline at Mbikiri estimated quantity spilled: 0.7 estimated spill area: 0.0005 latitude: 4.5641944 longitude: 7.0005 cause: sabotage cause detail: cleanup / recovery duratiom: 94 terrain: Swamp delay: |
incident year: 2011 site location name: Well 4T Flowline at Batan estimated quantity spilled: 1.22 estimated spill area: latitude: 5.528417 longitude: 5.534028 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2013 site location name: 28' Old Nembe Creek Pipeline Riser at Ido estimated quantity spilled: 9 estimated spill area: 0.0141 latitude: 4.575972 longitude: 6.975417 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2011 site location name: Batan Well 4T Flowline at Batan estimated quantity spilled: 0 estimated spill area: latitude: 5.532472 longitude: 5.53825 cause: operational cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2013 site location name: Imo River Well 21L Flowline at Igiriukwu / Esi-Etitioha estimated quantity spilled: 7 estimated spill area: 0.000018 latitude: 4.9799444 longitude: 7.1756667 cause: sabotage cause detail: cleanup / recovery duratiom: 177 terrain: Land delay: |
incident year: 2013 site location name: 8'' Cawthorne Channel 2 Pipeline at Mbiama Elem-Kalabari estimated quantity spilled: 0.9 estimated spill area: latitude: 4.5687222 longitude: 7.0002222 cause: sabotage cause detail: cleanup / recovery duratiom: 244 terrain: Swamp delay: |
incident year: 2011 site location name: Ughelli West Well 2L 3'' Flowline estimated quantity spilled: 19.5 estimated spill area: latitude: 5.534694 longitude: 5.896667 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 332 terrain: Land delay: community |
incident year: 2012 site location name: 8'' Ughelli West - UPS Delivery line at Ekakpamre estimated quantity spilled: 150 estimated spill area: latitude: 5.536722 longitude: 5.879944 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 84 terrain: Land delay: |
incident year: 2013 site location name: 20''Otumara-Escravos Pipeline at Ogidigben estimated quantity spilled: 4 estimated spill area: latitude: 5.551972 longitude: 5.202528 cause: sabotage cause detail: cleanup / recovery duratiom: 327 terrain: Swamp delay: |
incident year: 2013 site location name: 36' Nkpoku - Bomu Pipeline at Agbonchia estimated quantity spilled: 3 estimated spill area: 0.0001 latitude: 4.8399444 longitude: 7.1196667 cause: sabotage cause detail: cleanup / recovery duratiom: 201 terrain: Land delay: |
incident year: 2013 site location name: 12” Oguta-Egbema Pipeline at Obiakpu estimated quantity spilled: 12 estimated spill area: 0.0002 latitude: 5.55425 longitude: 6.7617778 cause: sabotage cause detail: cleanup / recovery duratiom: 167 terrain: Land delay: |
incident year: 2013 site location name: 28' Nkpoku - Bomu Pipeline at B-Dere estimated quantity spilled: 4 estimated spill area: 0.0002 latitude: 4.6884722 longitude: 7.2571111 cause: sabotage cause detail: cleanup / recovery duratiom: 83 terrain: Land delay: |
incident year: 2014 site location name: Santa Barbara Well 6T Flowline at Ikegimakiri estimated quantity spilled: 5 estimated spill area: 0.0001 latitude: 4.5523056 longitude: 6.5120556 cause: sabotage cause detail: cleanup / recovery duratiom: 179 terrain: Swamp delay: |
incident year: 2011 site location name: 24' Ughelli Pumping Station -Rapele Pipeline at Uvwiamuge estimated quantity spilled: 4.76 estimated spill area: latitude: 5.543083 longitude: 5.8835 cause: operational cause detail: cleanup / recovery duratiom: 178 terrain: Land delay: |
incident year: 2014 site location name: 20' Opukushi - Brass Creek Pipeline at Tamogbene estimated quantity spilled: 7 estimated spill area: 0.0006 latitude: 4.93735 longitude: 5.7065167 cause: sabotage cause detail: cleanup / recovery duratiom: 155 terrain: Swamp delay: |
incident year: 2012 site location name: 24' UPS-Rapele Pipeline ROW at Ugbokodo estimated quantity spilled: 14.7 estimated spill area: latitude: 5.572694 longitude: 5.675806 cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 318 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2014 site location name: 28' Nkpoku - Bomu Pipeline at Aleto estimated quantity spilled: 0.4 estimated spill area: latitude: 4.8086464 longitude: 7.1042147 cause: sabotage cause detail: cleanup / recovery duratiom: 203 terrain: Land delay: |
incident year: 2011 site location name: Well 4T at Ogini estimated quantity spilled: 0.02 estimated spill area: latitude: 5.574194 longitude: 6.311833 cause: operational cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2014 site location name: 28' Nkpoku - Bomu Pipeline at B-Dere estimated quantity spilled: 0.7 estimated spill area: latitude: 4.6943556 longitude: 7.2862417 cause: sabotage cause detail: cleanup / recovery duratiom: 131 terrain: Swamp delay: |
incident year: 2014 site location name: Otumara Well - 22L Flowline at Ugboegungun estimated quantity spilled: 2 estimated spill area: latitude: 5.633 longitude: 5.1583611 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 236 terrain: Swamp delay: |
incident year: 2011 site location name: Otumara Well 22L Flowline at Otumara estimated quantity spilled: 21.99 estimated spill area: latitude: 5.633 longitude: 5.158389 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 99 terrain: Swamp delay: community |
incident year: 2014 site location name: 6'' Obigbo North - Ogale Pipeline at Ogale estimated quantity spilled: 0.8 estimated spill area: 0 latitude: 4.8220278 longitude: 7.1544167 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2014 site location name: 48” Forcados Export line (circa 8km from the Coastline) estimated quantity spilled: 17 estimated spill area: latitude: ND longitude: ND cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2012 site location name: Imo River 1 Well 57L Flowline at Igiriukwu estimated quantity spilled: 18.7 estimated spill area: latitude: 4.995056 longitude: 7.176056 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2014 site location name: 20' Otumara -Escravos pipelines at Ugboegungun estimated quantity spilled: 0.7 estimated spill area: latitude: 5.6135 longitude: 5.1745833 cause: sabotage cause detail: cleanup / recovery duratiom: 164 terrain: Swamp delay: |
incident year: 2011 site location name: Otumara Well 44S Wellhead flowline riser at Otumara estimated quantity spilled: 1.8 estimated spill area: latitude: 5.659278 longitude: 5.148167 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 11 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2013 site location name: 24' Trans Niger Pipeline at Okolo Launch estimated quantity spilled: 20 estimated spill area: 0.0053 latitude: 4.501917 longitude: 7.221278 cause: sabotage cause detail: cleanup / recovery duratiom: 184 terrain: Swamp delay: |
incident year: 2013 site location name: 4' Oguta Well 6S Flowline at Umuashichi estimated quantity spilled: 0.1 estimated spill area: 0.00000055 latitude: 5.6645 longitude: 6.7040278 cause: operational cause detail: (corrosion) cleanup / recovery duratiom: terrain: Land delay: |
incident year: 2011 site location name: Agbada Well 58L Wellhead at Agbada estimated quantity spilled: 1 estimated spill area: latitude: ND longitude: ND cause: operational cause detail: cleanup / recovery duratiom: 17 terrain: Land delay: |
incident year: 2013 site location name: 24' Bomu - Bonny Trans Niger Pipeline at Bodo West estimated quantity spilled: 24 estimated spill area: 0.0034 latitude: 4.579444 longitude: 7.256028 cause: sabotage cause detail: cleanup / recovery duratiom: 716 terrain: Swamp delay: |
incident year: 2011 site location name: Otamiri Well 7L Flowline at Umuechem estimated quantity spilled: 1 estimated spill area: latitude: ND longitude: ND cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 26 terrain: Land delay: community |
incident year: 2013 site location name: Cawthorne Channel 1 Well 50S Flowline at Cawthorne Channel. estimated quantity spilled: 26 estimated spill area: 0.0115 latitude: 4.556889 longitude: 7.034361 cause: sabotage cause detail: cleanup / recovery duratiom: 186 terrain: Swamp delay: |
incident year: 2013 site location name: Nembe 2 Well17S Flowline at Nembe estimated quantity spilled: 33 estimated spill area: latitude: 4.439639 longitude: 6.320778 cause: sabotage cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2011 site location name: 16'' Uzere-Eriemu Pipeline at Iyede estimated quantity spilled: 36.5 estimated spill area: latitude: 5.492556 longitude: 6.091806 cause: sabotage cause detail: cleanup / recovery duratiom: 70 terrain: Land delay: community |
incident year: 2013 site location name: 4' Cawthorne Channel Well 51T flowline at Mbiama estimated quantity spilled: 1 estimated spill area: 0.0009 latitude: ND longitude: ND cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 267 terrain: Swamp delay: |
incident year: 2011 site location name: 24” Cawthorne Channel – Bonny Block Valve Staion at Kalibiama & 24” Cawthorne Channel – Bonny pipeline at kalibiama estimated quantity spilled: 64.4 estimated spill area: 0.0397 latitude: 4.492444 longitude: 7.149111 cause: sabotage cause detail: cleanup / recovery duratiom: 100 terrain: Swamp delay: |
incident year: 2011 site location name: Belema well 3 at Belema estimated quantity spilled: 69 estimated spill area: 0.007927 latitude: 4.390444 longitude: 6.656167 cause: sabotage cause detail: cleanup / recovery duratiom: 21 terrain: Swamp / Water delay: |
incident year: 2014 site location name: 4'' Adibawa Well 10S Flowline at Adibawa estimated quantity spilled: 1 estimated spill area: latitude: 5.2032778 longitude: 6.5166111 cause: sabotage cause detail: cleanup / recovery duratiom: 206 terrain: Land delay: |
incident year: 2014 site location name: Nembe 1 Well 35L Flowline at Nembe Creek estimated quantity spilled: 2 estimated spill area: latitude: 4.4358056 longitude: 6.324 cause: sabotage cause detail: cleanup / recovery duratiom: 203 terrain: Swamp delay: |
incident year: 2013 site location name: Cawthorne Channel 3 Well 41S Flowline at Sand-Sand estimated quantity spilled: 2 estimated spill area: 0.0008 latitude: ND longitude: ND cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 365 terrain: Swamp delay: |
incident year: 2012 site location name: Bonny Well 2L Right Of Way Flowline at Bonny estimated quantity spilled: 4 estimated spill area: latitude: ND longitude: ND cause: operational cause detail: cleanup / recovery duratiom: terrain: Swamp delay: |
incident year: 2011 site location name: 14' Okordia - Rumuekpe Pipeline at Ikarama estimated quantity spilled: 83.3 estimated spill area: 0.00645 latitude: 5.153361 longitude: 6.453028 cause: sabotage cause detail: cleanup / recovery duratiom: 77 terrain: Land delay: |
incident year: 2014 site location name: Yokri manifold - 8 LP2 bulk line at Yokri estimated quantity spilled: 7 estimated spill area: latitude: ND longitude: ND cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 165 terrain: Swamp delay: |
incident year: 2014 site location name: Opukushi Well 9 Flowline Egbemo-Angalabiri estimated quantity spilled: 23 estimated spill area: latitude: ND longitude: ND cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 253 terrain: Swamp delay: |
incident year: 2014 site location name: 24' Nkpoku - Bomu Trans Niger Pipeline at Biara estimated quantity spilled: 1 estimated spill area: 0.0002 latitude: 4.6951389 longitude: 7.2786667 cause: sabotage cause detail: cleanup / recovery duratiom: 97 terrain: Land delay: |
incident year: 2014 site location name: Opukushi Well 24T Flowline at Egbemo-Angalabiri estimated quantity spilled: 114 estimated spill area: latitude: ND longitude: ND cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 346 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2014 site location name: 28' Nkpoku - Bomu Pipeline at B-Dere estimated quantity spilled: 4 estimated spill area: latitude: 4.6823611 longitude: 7.2635 cause: sabotage cause detail: cleanup / recovery duratiom: 82 terrain: Land delay: |
incident year: 2014 site location name: 28'' Bomu-Bonny Pipeline at Bodo-City estimated quantity spilled: 3 estimated spill area: latitude: 4.5637222 longitude: 7.25175 cause: sabotage cause detail: cleanup / recovery duratiom: 396 terrain: Land delay: |
incident year: 2011 site location name: 12' Imo River 2 Pipeline at Owaza estimated quantity spilled: 138.5 estimated spill area: 0.0009 latitude: 4.980694 longitude: 7.174528 cause: sabotage cause detail: cleanup / recovery duratiom: 36 terrain: Land delay: other (terrain, floods, ...) |
incident year: 2013 site location name: Cawthorne Channel Loop line Tie-in Manifold at Ilomaturu estimated quantity spilled: 166 estimated spill area: latitude: 4.550611 longitude: 7.060583 cause: sabotage cause detail: cleanup / recovery duratiom: 268 terrain: Swamp delay: |
incident year: 2014 site location name: Opukushi Well 24T Flowline at Egbemo-Angalabiri estimated quantity spilled: 116 estimated spill area: latitude: ND longitude: ND cause: operational cause detail: (corrosion) cleanup / recovery duratiom: 358 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2011 site location name: 8' Isimiri Pipeline at Umuaghala estimated quantity spilled: 204 estimated spill area: 0.0084 latitude: 4.876333 longitude: 7.238889 cause: sabotage cause detail: cleanup / recovery duratiom: 79 terrain: Land delay: |
incident year: 2014 site location name: 36'' Nkpoku-Bomu Pipeline at Atali estimated quantity spilled: 4 estimated spill area: latitude: 4.88225 longitude: 7.0704167 cause: sabotage cause detail: cleanup / recovery duratiom: 41 terrain: Land delay: |
incident year: 2012 site location name: 16' Nun-River - Kolo Creek Trunkline at Oporoma estimated quantity spilled: 344.8 estimated spill area: 0.0146 latitude: 4.807694 longitude: 6.101944 cause: sabotage cause detail: cleanup / recovery duratiom: 63 terrain: Swamp delay: other (terrain, floods, ...) |
incident year: 2014 site location name: 10” Diebu Creek-Nun River Pipeline at Onyoma estimated quantity spilled: 367 estimated spill area: latitude: 4.7526944 longitude: 6.1028056 cause: sabotage cause detail: cleanup / recovery duratiom: 190 terrain: Land delay: |
incident year: 2011 site location name: Opukushi Well 34T flowline at Agbidiama / Egbemor-Angalabiri estimated quantity spilled: 134.4 estimated spill area: latitude: ND longitude: ND cause: operational cause detail: (equipment failure) cleanup / recovery duratiom: 49 terrain: Swamp delay: |
incident year: 2014 site location name: 28' Bomu - Bonny Trans Niger Pipeline at Bodo West estimated quantity spilled: 12 estimated spill area: latitude: 4.5749167 longitude: 7.2542222 cause: sabotage cause detail: cleanup / recovery duratiom: 173 terrain: Land delay: |
incident year: 2012 site location name: 20'' Otumara - Escravos Pipeline at Escravos estimated quantity spilled: 611 estimated spill area: latitude: 5.574028 longitude: 5.206306 cause: sabotage cause detail: cleanup / recovery duratiom: 107 terrain: Swamp delay: |
incident year: 2014 site location name: Belema Well 9T Well Head at Belema estimated quantity spilled: 10 estimated spill area: 0.0311 latitude: 4.4154444 longitude: 6.6441389 cause: sabotage cause detail: cleanup / recovery duratiom: 175 terrain: Swamp delay: |
incident year: 2012 site location name: 16' Nun-River - Kolo Creek Pipeline at Aguobiri estimated quantity spilled: 937.3 estimated spill area: 0.224 latitude: 4.822583 longitude: 6.1425 cause: sabotage cause detail: cleanup / recovery duratiom: 106 terrain: Swamp delay: |
incident year: 2014 site location name: Belema Well 2T Well Head at Belema estimated quantity spilled: 15 estimated spill area: 0.0536 latitude: 4.4029722 longitude: 6.6335833 cause: sabotage cause detail: cleanup / recovery duratiom: 174 terrain: Swamp delay: |