incident year: 2013
site location name: Forcados Terminal SPM2 at Ogulagha
estimated quantity spilled: 1
estimated spill area:
latitude: 3.6669277
longitude: 7.3278809
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom:
terrain: Water
delay:
incident year: 2011
site location name: Cawthorne Channel Well 21L Flowline
estimated quantity spilled: 2
estimated spill area: 0.000029
latitude: 4.554172
longitude: 7.010778
cause: sabotage
cause detail:
cleanup / recovery duratiom: 20
terrain: Swamp
delay:
incident year: 2011
site location name: 28' Trans Niger Pipeline at Bodo Creek
estimated quantity spilled: 233
estimated spill area: 0.001115
latitude: 4.591639
longitude: 7.257083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 12
terrain: Swamp
delay:
incident year: 2011
site location name: Ubie Well 9S Flowline at Ubie
estimated quantity spilled: 399
estimated spill area: 0.0005
latitude: 5.111833
longitude: 6.540083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 41
terrain: Land
delay:
incident year: 2011
site location name: 28' Trans Niger Pipeline at Bodo
estimated quantity spilled: 118.4
estimated spill area: 0.007944
latitude: 4.594639
longitude: 7.257556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 11
terrain: Swamp / Water
delay:
incident year: 2011
site location name: Nun River Well 15 Flowline at Nun River
estimated quantity spilled: 8.6
estimated spill area: 0.000436
latitude: 4.786056
longitude: 6.080639
cause: sabotage
cause detail:
cleanup / recovery duratiom: 40
terrain: Swamp / Land
delay:
incident year: 2011
site location name: 28' Bomu-Bonny Pipeline at BodoWest
estimated quantity spilled: 100.2
estimated spill area: 0.0062
latitude: 4.573139
longitude: 7.253833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 15
terrain: Swamp / Water
delay:
incident year: 2011
site location name: 24' Bomu-Bonny Pipeline at Moghor
estimated quantity spilled: 78
estimated spill area: 0.000024
latitude: 4.648806
longitude: 7.277278
cause: sabotage
cause detail:
cleanup / recovery duratiom: 30
terrain: Land
delay:
incident year: 2011
site location name: 28' Bomu-Bonny Pipeline at BodoWest
estimated quantity spilled: 77
estimated spill area: 0.006833
latitude: 4.602167
longitude: 7.2585
cause: sabotage
cause detail:
cleanup / recovery duratiom: 17
terrain: Swamp
delay:
incident year: 2011
site location name: 20' KoloCreek-Rumuekpe Pipeline at Ogbogolo
estimated quantity spilled: 67.5
estimated spill area: 0.067917
latitude: 4.947222
longitude: 6.558194
cause: sabotage
cause detail:
cleanup / recovery duratiom: 252
terrain: Land
delay: security
incident year: 2011
site location name: 24' Bomu-Bonny Pipeline at K-Dere
estimated quantity spilled: 144.6
estimated spill area: 0.0005
latitude: 4.659111
longitude: 7.276556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 125
terrain: Land
delay: community
incident year: 2011
site location name: 24'/28' Trans Niger Pipeline at BodoWest
estimated quantity spilled: 162.1
estimated spill area: 0.013661
latitude: 4.564528
longitude: 7.252833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 16
terrain: Swamp
delay:
incident year: 2011
site location name: 8' Obigbo North Pipeline at Umuare
estimated quantity spilled: 1.2
estimated spill area: 0.000123
latitude: 4.851806
longitude: 7.124222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 16
terrain: Land
delay:
incident year: 2012
site location name: SPM 3 Bonny Crude Loading Platform Offshore
estimated quantity spilled: 14
estimated spill area:
latitude: 4.109444
longitude: 7.125833
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom:
terrain: Water
delay:
incident year: 2011
site location name: 28' and 24' Bomu-Bonny Pipelines at BodoWest
estimated quantity spilled: 165.1
estimated spill area: 0.008653
latitude: 4.597083
longitude: 7.257806
cause: sabotage
cause detail:
cleanup / recovery duratiom: 12
terrain: Swamp
delay:
incident year: 2011
site location name: Adibawa North East Well 4L Flowline at Biseni
estimated quantity spilled: 429
estimated spill area: 0.0012
latitude: 5.255361
longitude: 6.523694
cause: sabotage
cause detail:
cleanup / recovery duratiom: 34
terrain: Land
delay:
incident year: 2011
site location name: 12' Imo 2 - Ogale Pipeline at Owaza
estimated quantity spilled: 4.7
estimated spill area: 0.0034
latitude: 4.980222
longitude: 7.175667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 23
terrain: Land
delay:
incident year: 2012
site location name: Oroni Well-1 Flowline at Okpole-Enwhen
estimated quantity spilled: 0.1
estimated spill area:
latitude: 4.170556
longitude: 6.133083
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 102
terrain: Land
delay:
incident year: 2011
site location name: KoloCreek Well 21T flowline at KoloCreek
estimated quantity spilled: 3
estimated spill area: 0.000242
latitude: 4.893306
longitude: 6.380333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 15
terrain: Swamp
delay:
incident year: 2011
site location name: 18' Assa - Rumuekpe Pipeline at Egbeda
estimated quantity spilled: 5
estimated spill area: 0.0003
latitude: 5.230944
longitude: 6.767861
cause: sabotage
cause detail:
cleanup / recovery duratiom: 63
terrain: Land
delay:
incident year: 2011
site location name: Apara Well 3 Location at Apara.
estimated quantity spilled: 1.5
estimated spill area: 0.0002
latitude: 4.834306
longitude: 6.999583
cause: sabotage
cause detail:
cleanup / recovery duratiom: 2
terrain: Land
delay:
incident year: 2011
site location name: 12' Imo River Pipeline at Owaza
estimated quantity spilled: 26.5
estimated spill area: 0.0006
latitude: 4.980639
longitude: 7.174639
cause: sabotage
cause detail:
cleanup / recovery duratiom: 7
terrain: Land
delay:
incident year: 2011
site location name: 36' Rumuekpe - Nkpoku Pipeline at Rumuekpe
estimated quantity spilled: 7
estimated spill area: 0.001283
latitude: 4.977833
longitude: 6.698778
cause: sabotage
cause detail:
cleanup / recovery duratiom: 22
terrain: Land
delay:
incident year: 2011
site location name: 18' Assa - Rumuekpe Pipeline @ Egbeda
estimated quantity spilled: 2.6
estimated spill area: 0.0006
latitude: 5.225889
longitude: 6.766694
cause: sabotage
cause detail:
cleanup / recovery duratiom: 54
terrain: Land
delay:
incident year: 2012
site location name: Bonny Terminal Crude Loading Platform at Bonny
estimated quantity spilled: 20
estimated spill area:
latitude: 4.201889
longitude: 7.275972
cause: operational
cause detail: (operational and maintenance error )
cleanup / recovery duratiom:
terrain: Water
delay:
incident year: 2011
site location name: 12' Imo River 1 Ogale Pipeline at Owaza
estimated quantity spilled: 4.5
estimated spill area: 0.0005
latitude: 4.951722
longitude: 7.184917
cause: sabotage
cause detail:
cleanup / recovery duratiom: 35
terrain: Land
delay:
incident year: 2011
site location name: 24' Bomu-Bonny Pipeline at & Bodo / Mogho
estimated quantity spilled: 15
estimated spill area: 0.0029
latitude: 4.639
longitude: 7.277861
cause: sabotage
cause detail:
cleanup / recovery duratiom: 17
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2011
site location name: 28' Bomu-Bonny Pipeline at Bodo / Mogho
estimated quantity spilled: 16
estimated spill area: 0.0029
latitude: 4.645778
longitude: 7.277528
cause: sabotage
cause detail:
cleanup / recovery duratiom: 17
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2011
site location name: 24' Nkpoku - Bomu Pipeline at Biara
estimated quantity spilled: 195
estimated spill area: 0.0003
latitude: 4.703556
longitude: 7.279556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 16
terrain: Land
delay:
incident year: 2011
site location name: 24' Nkpoku - Bomu Pipeline at Bera
estimated quantity spilled: 31
estimated spill area: 0.0027
latitude: 4.6859728
longitude: 7.27775
cause: sabotage
cause detail:
cleanup / recovery duratiom: 17
terrain: Land
delay:
incident year: 2011
site location name: Obigbo Well 28 Flowline at Obigbo
estimated quantity spilled: 5.2
estimated spill area: 0.0001
latitude: 4.911889
longitude: 7.088833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 19
terrain: Land
delay:
incident year: 2011
site location name: 6' Imo River Well 59 Flowline at Well Head
estimated quantity spilled: 9.2
estimated spill area: 0.000707
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom: 126
terrain: Land
delay:
incident year: 2011
site location name: 12' Imo River 1 Pipeline at Owaza
estimated quantity spilled: 6
estimated spill area: 0.0015
latitude: 4.946417
longitude: 7.184722
cause: sabotage
cause detail:
cleanup / recovery duratiom: 29
terrain: Land
delay:
incident year: 2011
site location name: Imo River Well 55 S Flowline at Igiriukwu
estimated quantity spilled: 3
estimated spill area: 0.006
latitude: 4.9905
longitude: 7.182444
cause: sabotage
cause detail:
cleanup / recovery duratiom: 46
terrain: Land
delay:
incident year: 2014
site location name: 6' Belema Pipeline at Belema
estimated quantity spilled: 0.8
estimated spill area: 0.0025
latitude: 4.4014167
longitude: 6.6491389
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 288
terrain: Water
delay: contracting
incident year: 2011
site location name: 36' Rumuekpe-Nkpoku Pipeline at Aluu
estimated quantity spilled: 7
estimated spill area: 0.0011
latitude: 4.949028
longitude: 6.940472
cause: sabotage
cause detail:
cleanup / recovery duratiom: 34
terrain: Land
delay:
incident year: 2011
site location name: 14' Okordia-Rumuekpe Pipeline and Akalamini Riser at Akalamini
estimated quantity spilled: 4.68
estimated spill area: 0.00458
latitude: 5.120222
longitude: 6.483083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 8
terrain: Land
delay:
incident year: 2012
site location name: Nembe 1 Flow Line at Nembe Creek
estimated quantity spilled: 16
estimated spill area:
latitude: 4.4335
longitude: 6.323472
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 99
terrain: Swamp
delay: community
incident year: 2011
site location name: 20' KoloCreek-Rumuekpe Pipeline at Ogbogolo
estimated quantity spilled: 4387.3
estimated spill area: 0.033882
latitude: 4.946889
longitude: 6.554806
cause: sabotage
cause detail:
cleanup / recovery duratiom: 278
terrain: Swamp / Land
delay: other (terrain, floods, ...)
incident year: 2014
site location name: Nembe 1 Well 23T Flowline at Nembe Creek
estimated quantity spilled: 180
estimated spill area: 0.002
latitude: 4.4356944
longitude: 6.322
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 160
terrain: Swamp
delay: community
incident year: 2011
site location name: 12' Imo River 2 Manifold at Odagwa
estimated quantity spilled: 164.2
estimated spill area: 0.001
latitude: 4.981222
longitude: 7.169917
cause: sabotage
cause detail:
cleanup / recovery duratiom: 65
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2012
site location name: Nembe 1 Well 19S Wellhead at Ogbolomabiri
estimated quantity spilled: 0.8
estimated spill area:
latitude: 4.436972
longitude: 6.318
cause: operational
cause detail: (operational and maintenance error )
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2011
site location name: 10' Diebu Creek - Nun River Pipeline at Onyioma
estimated quantity spilled: 197.1
estimated spill area: 0.13
latitude: 4.746806
longitude: 6.102167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 131
terrain: Swamp
delay:
incident year: 2011
site location name: Chokota Gathering Manifold; Igbo Etche; Obigbo
estimated quantity spilled: 26.7
estimated spill area: 0.0061
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom: 44
terrain: Land
delay:
incident year: 2011
site location name: 20''Ughelli Pumping Station -Warri Refinery Pipeline at Ekpan
estimated quantity spilled: 6.85
estimated spill area:
latitude: 5.573278
longitude: 5.723028
cause: sabotage
cause detail:
cleanup / recovery duratiom: 27
terrain: Land
delay:
incident year: 2011
site location name: Nembe Well 20L at Nembe Creek
estimated quantity spilled: 22
estimated spill area: 0.0254
latitude: 4.451806
longitude: 6.328083
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 151
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2011
site location name: 12' Imo River - Ogale Pipeline at KomKom
estimated quantity spilled: 49.5
estimated spill area: 27
latitude: 4.878083
longitude: 7.172611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 27
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2011
site location name: 8' Isimiri Pipeline at Umuaghala
estimated quantity spilled: 303.5
estimated spill area: 0.0084
latitude: 4.876806
longitude: 7.236944
cause: sabotage
cause detail:
cleanup / recovery duratiom: 188
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2011
site location name: Nembe Creek 2 Flow Station at Nembe
estimated quantity spilled: 78.1
estimated spill area: 0
latitude: 4.453528
longitude: 6.324167
cause: operational
cause detail: (operational and maintenance error )
cleanup / recovery duratiom:
terrain: Water
delay:
incident year: 2011
site location name: 24' Nembe Creek Pipeline at Tora
estimated quantity spilled: 479.49
estimated spill area: 0.0413
latitude: 4.482389
longitude: 6.535167
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 131
terrain: Swamp
delay: community
incident year: 2011
site location name: 16' Egbema-Assa Pipeline at Ekpeagha
estimated quantity spilled: 2
estimated spill area: 0.0006
latitude: 5.432556
longitude: 6.781056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 10
terrain: Land
delay:
incident year: 2011
site location name: Bonny - Oloma Well 2L Flowline at Oloma
estimated quantity spilled: 16
estimated spill area:
latitude: 4.492833
longitude: 7.218861
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 144
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2011
site location name: Jones Creek Well Head 23S/L at Kokodiagbene
estimated quantity spilled: 9.88
estimated spill area:
latitude: 5.692472
longitude: 5.372028
cause: sabotage
cause detail:
cleanup / recovery duratiom: 66
terrain: Swamp
delay:
incident year: 2011
site location name: 18' Assa-Rumuekpe Pipeline at Elele-Amini
estimated quantity spilled: 155
estimated spill area: 0.001
latitude: 5.097778
longitude: 6.722278
cause: sabotage
cause detail:
cleanup / recovery duratiom: 15
terrain: Land
delay:
incident year: 2011
site location name: 12' Adibawa-Okordia Pipeline at Ikarama
estimated quantity spilled: 80.7
estimated spill area: 25
latitude: 5.167583
longitude: 6.472861
cause: sabotage
cause detail:
cleanup / recovery duratiom: 60
terrain: Land
delay:
incident year: 2011
site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama
estimated quantity spilled: 127.8
estimated spill area: 15.5
latitude: 5.1465
longitude: 6.458944
cause: sabotage
cause detail:
cleanup / recovery duratiom: 52
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2013
site location name: Bonny Well 2S Flowline at Oloma
estimated quantity spilled: 40
estimated spill area:
latitude: 4.493389
longitude: 7.221472
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 102
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2011
site location name: 12' Imo River Pipeline at Uzuaku
estimated quantity spilled: 724.6
estimated spill area: 0.0012
latitude: 4.917722
longitude: 7.184444
cause: sabotage
cause detail:
cleanup / recovery duratiom: 107
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2011
site location name: Imo River 3 Well 1 Flowline at Ipu-West
estimated quantity spilled: 11.3
estimated spill area: 0.005
latitude: 4.975833
longitude: 7.195306
cause: sabotage
cause detail:
cleanup / recovery duratiom: 28
terrain: Land
delay:
incident year: 2012
site location name: 24' Alakiri - Bonny Pipeline (GPHSL) at Fusokiri / Ilomatoru
estimated quantity spilled: 9.5
estimated spill area: 0.0098
latitude: 4.500333
longitude: 7.11975
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 383
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2014
site location name: Old 24' Nembe Creek Pipeline at Luckyland
estimated quantity spilled: 1
estimated spill area:
latitude: 4.5054444
longitude: 6.6814722
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 195
terrain: Swamp
delay:
incident year: 2011
site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama
estimated quantity spilled: 64.3
estimated spill area:
latitude: 5.141528
longitude: 6.463278
cause: sabotage
cause detail:
cleanup / recovery duratiom: 61
terrain: Land
delay:
incident year: 2011
site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama
estimated quantity spilled: 128.6
estimated spill area: 0.0085
latitude: 5.153389
longitude: 6.453
cause: sabotage
cause detail:
cleanup / recovery duratiom: 101
terrain: Land
delay: community
incident year: 2012
site location name: 10' Ekulama 2 Pipeline at Sanbarth
estimated quantity spilled: 13
estimated spill area: 0.0146
latitude: 4.505472
longitude: 6.687944
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 121
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2011
site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama
estimated quantity spilled: 85.9
estimated spill area:
latitude: 5.135333
longitude: 6.472861
cause: sabotage
cause detail:
cleanup / recovery duratiom: 62
terrain: Land
delay:
incident year: 2011
site location name: 12' Adibawa-Okordia Pipeline at Ikarama
estimated quantity spilled: 120
estimated spill area: 0.0015
latitude: 5.167306
longitude: 6.472556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 43
terrain: Land
delay:
incident year: 2011
site location name: Cawthorne Channel Well 43S Flowline at Cawthorne Channel
estimated quantity spilled: 1.8
estimated spill area: 0.0007
latitude: 4.550833
longitude: 6.975556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 30
terrain: Swamp
delay:
incident year: 2011
site location name: 12' Egbema-Oguta Pipeline at Eziosu
estimated quantity spilled: 0.3
estimated spill area: 0.0001
latitude: 5.644631
longitude: 6.753333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 5
terrain: Land
delay:
incident year: 2011
site location name: Nun River Well 15 Flowline at Onyonma
estimated quantity spilled: 3.5
estimated spill area: 0.006858
latitude: 4.786056
longitude: 6.080656
cause: sabotage
cause detail:
cleanup / recovery duratiom: 101
terrain: Swamp
delay: community
incident year: 2011
site location name: 28'' Trans Forcados Pipeline at Batan axis
estimated quantity spilled: 134.28
estimated spill area:
latitude: 5.544222
longitude: 5.515889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 153
terrain: Swamp
delay:
incident year: 2011
site location name: 6' Obigbo - North Pipeline at Ogale
estimated quantity spilled: 1.73
estimated spill area: 0.0007
latitude: 4.822139
longitude: 7.1545
cause: sabotage
cause detail:
cleanup / recovery duratiom: 51
terrain: Land
delay:
incident year: 2011
site location name: 8' Umuechem - Nkpoku Pipeline at Igwuruta
estimated quantity spilled: 3.26
estimated spill area: 0.0012
latitude: 4.981722
longitude: 7.024097
cause: sabotage
cause detail:
cleanup / recovery duratiom: 104
terrain: Land
delay:
incident year: 2011
site location name: 4' Imo River 1 Well 30 S Flowline at Igiriukwu
estimated quantity spilled: 6.6
estimated spill area: 0.000506
latitude: 4.9845
longitude: 7.178583
cause: sabotage
cause detail:
cleanup / recovery duratiom: 20
terrain: Land
delay:
incident year: 2011
site location name: 20” Buguma–Alakiri Trunk line at Bakana
estimated quantity spilled: 52.5
estimated spill area:
latitude: 4.582889
longitude: 6.956861
cause: sabotage
cause detail:
cleanup / recovery duratiom: 7
terrain: Swamp
delay: community
incident year: 2012
site location name: 10' Ekulama 2 Pipeline at Sanbarth / Luckyland
estimated quantity spilled: 5.5
estimated spill area:
latitude: 4.506306
longitude: 6.687417
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 70
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2011
site location name: 24' Alakiri-Bonny Pipeline at Illomatoru
estimated quantity spilled: 152
estimated spill area: 0.1611
latitude: 4.527389
longitude: 7.094111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 111
terrain: Swamp
delay:
incident year: 2011
site location name: 12' Adibawa-Okordia Pipeline at Ikarama
estimated quantity spilled: 30
estimated spill area:
latitude: 5.157444
longitude: 6.460056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 113
terrain: Land
delay:
incident year: 2011
site location name: 6' Obigbo North - Ogale Pipeline at Ogale
estimated quantity spilled: 24.88
estimated spill area: 0.0009
latitude: 4.828972
longitude: 7.155306
cause: sabotage
cause detail:
cleanup / recovery duratiom: 29
terrain: Land
delay:
incident year: 2011
site location name: 10'' Ogini-Eriemu delivery line at Ovrode
estimated quantity spilled: 1
estimated spill area:
latitude: 5.571583
longitude: 6.299889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 6
terrain: Land
delay:
incident year: 2011
site location name: 10' Ekulama-Sanbarth Pipeline at Sanbarth
estimated quantity spilled: 0.93
estimated spill area: 0.0007
latitude: 4.506333
longitude: 6.68775
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 67
terrain: Swamp
delay: community
incident year: 2011
site location name: 6' Obigbo North - OgalePipeline at Ogale
estimated quantity spilled: 6.8
estimated spill area: 0.0002
latitude: 4.835636
longitude: 7.156089
cause: sabotage
cause detail:
cleanup / recovery duratiom: 17
terrain: Land
delay:
incident year: 2011
site location name: 14' Okordia - Rumuekpe Trunkline at Ikarama
estimated quantity spilled: 84.7
estimated spill area: 0.0117
latitude: 5.153194
longitude: 6.453056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 126
terrain: Land
delay: community
incident year: 2011
site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama
estimated quantity spilled: 91.9
estimated spill area: 0.0125
latitude: 5.138806
longitude: 6.465639
cause: sabotage
cause detail:
cleanup / recovery duratiom: 116
terrain: Land
delay:
incident year: 2013
site location name: 24' Alakiri - Bonny Pipeline (disused GPHSL) at Ilomatoru
estimated quantity spilled: 41
estimated spill area:
latitude: 4.518667
longitude: 7.106111
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 311
terrain: Swamp
delay:
incident year: 2011
site location name: 14' Okordia - Rumuekpe Pipeline at Ikarama
estimated quantity spilled: 67.96
estimated spill area: 0.0009
latitude: 5.135361
longitude: 6.468833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 57
terrain: Land
delay: community
incident year: 2011
site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama
estimated quantity spilled: 68.7
estimated spill area: 0.0013
latitude: 5.136528
longitude: 6.467667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 104
terrain: Land
delay:
incident year: 2014
site location name: 24' Nkpoku - Bomu Trans Niger Pipeline at Freetown
estimated quantity spilled: 2
estimated spill area: 0.0006
latitude: 4.5192778
longitude: 7.2365278
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 291
terrain: Swamp
delay:
incident year: 2012
site location name: 24' Bomu - Bonny Trunkline at Freetown
estimated quantity spilled: 7.7
estimated spill area: 0.0018
latitude: 4.519306
longitude: 7.236472
cause: operational
cause detail: (sabotage)
cleanup / recovery duratiom: 285
terrain: Swamp
delay: community
incident year: 2011
site location name: 12' Adibawa - Okordia Pipeline at Ikarama.
estimated quantity spilled: 345.75
estimated spill area: 0.0006
latitude: 5.16575
longitude: 6.4705
cause: sabotage
cause detail:
cleanup / recovery duratiom: 67
terrain: Land
delay: community
incident year: 2011
site location name: 12' Imo River - Ogale Pipeline at Komkom
estimated quantity spilled: 167.12
estimated spill area:
latitude: 4.878806
longitude: 7.172556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 132
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2011
site location name: Oroni Well 7S Flowline
estimated quantity spilled: 9
estimated spill area:
latitude: 5.355972
longitude: 6.166806
cause: sabotage
cause detail:
cleanup / recovery duratiom: 42
terrain: Land
delay:
incident year: 2011
site location name: 24' Nembe Creek Pipeline at Tora
estimated quantity spilled: 245.2
estimated spill area: 1.0014
latitude: 4.476722
longitude: 6.477083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 128
terrain: Swamp
delay:
incident year: 2012
site location name: 8' Cawthorne Channel II Pipeline at Tigerkiri
estimated quantity spilled: 3.6
estimated spill area: 0.0054
latitude: 4.577278
longitude: 6.984472
cause: sabotage
cause detail:
cleanup / recovery duratiom: 32
terrain: Swamp
delay:
incident year: 2012
site location name: 36' Nkpoku - Bomu Pipeline at Eneka
estimated quantity spilled: 13
estimated spill area: 0.000057
latitude: 4.896639
longitude: 7.053583
cause: sabotage
cause detail:
cleanup / recovery duratiom: 23
terrain: Land
delay:
incident year: 2012
site location name: 8' Umuechem - Nkpoku Pipeline at Omunwei; Igwuruta
estimated quantity spilled: 2.4
estimated spill area: 0.0012
latitude: 4.981694
longitude: 7.024139
cause: sabotage
cause detail:
cleanup / recovery duratiom: 14
terrain: Land
delay:
incident year: 2012
site location name: 16' Egbema-Assa Trunk line at Assa
estimated quantity spilled: 4.7
estimated spill area: 0.0002
latitude: 5.380611
longitude: 6.796083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 41
terrain: Land
delay:
incident year: 2012
site location name: Etelebou Well 11T at Etelebou
estimated quantity spilled: 98.5
estimated spill area: 0.003
latitude: 5.005028
longitude: 6.368306
cause: sabotage
cause detail:
cleanup / recovery duratiom: 34
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2012
site location name: 6'Obigbo North Pipeline at Ogale
estimated quantity spilled: 120
estimated spill area: 0.0017
latitude: 4.820361
longitude: 7.154222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 42
terrain: Land
delay:
incident year: 2011
site location name: Awoba Well 5 L Flowline ROW at Awoba
estimated quantity spilled: 2.6
estimated spill area:
latitude: 4.525556
longitude: 6.826278
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 15
terrain: Swamp
delay:
incident year: 2012
site location name: 10'' Kokori-Eriemu Pipeline at Kokori
estimated quantity spilled: 529.5
estimated spill area:
latitude: 5.628972
longitude: 6.069556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 103
terrain: Land
delay:
incident year: 2012
site location name: 12' Imo River 2 Pipeline at Owaza
estimated quantity spilled: 2.1
estimated spill area: 0.001
latitude: 4.980694
longitude: 7.1745
cause: sabotage
cause detail:
cleanup / recovery duratiom: 33
terrain: Land
delay:
incident year: 2012
site location name: Ubie Well 9S flowline at Idu/Edrass
estimated quantity spilled: 7.3
estimated spill area:
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom: 47
terrain: Land
delay:
incident year: 2012
site location name: 6' Obigbo North - Ogale pipeline at Komkom
estimated quantity spilled: 103.2
estimated spill area:
latitude: 4.84575
longitude: 7.157333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 23
terrain: Land
delay:
incident year: 2011
site location name: 10' Diebu creek Pipeline at Oporoma
estimated quantity spilled: 3.2
estimated spill area: 0.0006
latitude: 4.843333
longitude: 6.128806
cause: sabotage
cause detail:
cleanup / recovery duratiom: 90
terrain: Swamp
delay:
incident year: 2011
site location name: 16' Nun-River - Kolo Creek Pipeline at Aguobiri
estimated quantity spilled: 41.2
estimated spill area: 0.00124
latitude: 4.823806
longitude: 6.062917
cause: sabotage
cause detail:
cleanup / recovery duratiom: 135
terrain: Swamp
delay:
incident year: 2011
site location name: 10' Diebu creek Pipeline at Oporoma
estimated quantity spilled: 103.7
estimated spill area: 0.0118
latitude: 4.800056
longitude: 6.108083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 131
terrain: Swamp
delay:
incident year: 2012
site location name: 12' Oguta - Egbema Pipeline at Obiakpu
estimated quantity spilled: 2025.6
estimated spill area: 0.0349
latitude: 5.573111
longitude: 6.76075
cause: sabotage
cause detail:
cleanup / recovery duratiom: 75
terrain: Land
delay:
incident year: 2014
site location name: 6” Awoba Flowstation - Manifold Pipeline at Awoba
estimated quantity spilled: 2
estimated spill area: 0.0002
latitude: 4.5316389
longitude: 6.8197778
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 292
terrain: Swamp
delay:
incident year: 2012
site location name: 36' Rumuekpe - Nkpoku Pipeline at Omuigwe-Aluu
estimated quantity spilled: 291.3
estimated spill area: 0.0111
latitude: 4.9435
longitude: 6.94075
cause: sabotage
cause detail:
cleanup / recovery duratiom: 65
terrain: Land
delay:
incident year: 2012
site location name: 36' Nkpoku - Bomu Trunkline at Agbonchia
estimated quantity spilled: 156.8
estimated spill area: 0.0032
latitude: 4.83175
longitude: 7.129417
cause: sabotage
cause detail:
cleanup / recovery duratiom: 71
terrain: Land
delay:
incident year: 2012
site location name: 36' Rumuekpe - Nkpoku Trunkline at Mbodo-Aluu
estimated quantity spilled: 52.8
estimated spill area: 0.006
latitude: 4.941442
longitude: 6.948065
cause: sabotage
cause detail:
cleanup / recovery duratiom: 54
terrain: Land
delay:
incident year: 2012
site location name: 8' Nkali pipeline at Odagwa
estimated quantity spilled: 0.67
estimated spill area: 0.00007
latitude: 4.987306
longitude: 7.158944
cause: sabotage
cause detail:
cleanup / recovery duratiom: 41
terrain: Land
delay:
incident year: 2012
site location name: 8' Isimiri - Imo Gate delivery line at Isimiri.
estimated quantity spilled: 14
estimated spill area: 0.001
latitude: 4.885806
longitude: 7.194667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 38
terrain: Land
delay:
incident year: 2012
site location name: 28' Nkpoku -Bomu Pipeline at Aleto-Nchia-Eleme
estimated quantity spilled: 2755
estimated spill area: 0.0041
latitude: 4.812417
longitude: 7.101528
cause: sabotage
cause detail:
cleanup / recovery duratiom: 86
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2012
site location name: 12' Kokori-Eriemu Delivery line at Oteri/Agbarha.
estimated quantity spilled: 306.1
estimated spill area:
latitude: 5.569667
longitude: 6.059972
cause: sabotage
cause detail:
cleanup / recovery duratiom: 39
terrain: Land
delay:
incident year: 2012
site location name: 24' Nkpoku - Bomu Trunkline at Bera
estimated quantity spilled: 2.1
estimated spill area: 0.000003
latitude: 4.686028
longitude: 7.277722
cause: sabotage
cause detail:
cleanup / recovery duratiom: 129
terrain: Land
delay:
incident year: 2012
site location name: 8' Umuechem - Nkpoku delivery line at Umuechem
estimated quantity spilled: 9.1
estimated spill area: 0.0007
latitude: 5.001944
longitude: 7.021194
cause: sabotage
cause detail:
cleanup / recovery duratiom: 36
terrain: Land
delay:
incident year: 2013
site location name: 6'' Awoba Pipeline at Awoba
estimated quantity spilled: 5
estimated spill area: 0.0001
latitude: 4.5316389
longitude: 6.8200833
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 368
terrain: Swamp
delay:
incident year: 2012
site location name: 28' Nkpoku - Bomu Pipeline at B-Dere
estimated quantity spilled: 112.2
estimated spill area: 0.0223
latitude: 4.691028
longitude: 7.254417
cause: sabotage
cause detail:
cleanup / recovery duratiom: 114
terrain: Land
delay:
incident year: 2011
site location name: Awoba Well 2T Flowline Riser at Awoba
estimated quantity spilled: 0.13
estimated spill area:
latitude: 4.531667
longitude: 6.81925
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2012
site location name: 12' Imo-River - Ogale Pipeilne at Owaza.
estimated quantity spilled: 493.2
estimated spill area: 0.003
latitude: 4.95175
longitude: 7.184917
cause: sabotage
cause detail:
cleanup / recovery duratiom: 28
terrain: Land
delay:
incident year: 2012
site location name: KoloCreek Well 3T Flowline at Otuasega
estimated quantity spilled: 3.9
estimated spill area: 0.0003
latitude: 4.89475
longitude: 6.367028
cause: sabotage
cause detail:
cleanup / recovery duratiom: 49
terrain: Land
delay:
incident year: 2012
site location name: 12' Imo-River - Ogale Pipeilne at Owaza.
estimated quantity spilled: 0.52
estimated spill area: 0.0001
latitude: 4.980694
longitude: 7.174472
cause: sabotage
cause detail:
cleanup / recovery duratiom: 21
terrain: Land
delay:
incident year: 2012
site location name: 18' Assa - Rumuekpe Pipeline at Awara.
estimated quantity spilled: 40.1
estimated spill area: 0.0005
latitude: 5.288389
longitude: 6.781278
cause: sabotage
cause detail:
cleanup / recovery duratiom: 14
terrain: Land
delay:
incident year: 2011
site location name: Awoba Well 8 T Flowline at Bille
estimated quantity spilled: 0.5
estimated spill area:
latitude: 4.531667
longitude: 6.819278
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2012
site location name: 16’’ Nun River-Kolocreek Trunkline at Angiama-Gbeni
estimated quantity spilled: 74
estimated spill area: 0.0059
latitude: 4.819417
longitude: 6.133056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 62
terrain: Swamp
delay:
incident year: 2011
site location name: 6' Awoba Pipeline at Awoba
estimated quantity spilled: 0.001
estimated spill area:
latitude: 4.532444
longitude: 6.819917
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2012
site location name: Oroni Well-1 Flowline at Enhwe
estimated quantity spilled: 0.04
estimated spill area:
latitude: 5.363556
longitude: 6.136444
cause: sabotage
cause detail:
cleanup / recovery duratiom: 31
terrain: Land
delay:
incident year: 2012
site location name: 12' Imo River 2 Pipeline at Odagwa
estimated quantity spilled: 0.79
estimated spill area: 0.0002
latitude: 4.980806
longitude: 7.170944
cause: sabotage
cause detail:
cleanup / recovery duratiom: 8
terrain: Land
delay:
incident year: 2012
site location name: 24' Bomu - Bonny Trans Niger Pipeline at Mogho
estimated quantity spilled: 67.9
estimated spill area: 0.0006
latitude: 4.645222
longitude: 7.2775
cause: sabotage
cause detail:
cleanup / recovery duratiom: 122
terrain: Land
delay:
incident year: 2011
site location name: 10' Pipeline at Ekulama
estimated quantity spilled: 229
estimated spill area:
latitude: 4.53335
longitude: 6.683361
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 96
terrain: Swamp
delay:
incident year: 2012
site location name: 4' Agbada II Well 48S Flowline at Omuohia
estimated quantity spilled: 34.7
estimated spill area: 0.0003
latitude: 4.938306
longitude: 7.009444
cause: sabotage
cause detail:
cleanup / recovery duratiom: 82
terrain: Land
delay:
incident year: 2012
site location name: 12” Imo River Pipeline at Uzuaku
estimated quantity spilled: 5.8
estimated spill area: 0.000066
latitude: 4.905861
longitude: 7.178889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 44
terrain: Land
delay:
incident year: 2012
site location name: 12” Imo River Pipeline at Uzuaku
estimated quantity spilled: 0.89
estimated spill area: 0.000012
latitude: 4.922611
longitude: 7.219194
cause: sabotage
cause detail:
cleanup / recovery duratiom: 43
terrain: Land
delay:
incident year: 2012
site location name: 10' Ekulama Pipeline at Ekulama
estimated quantity spilled: 49.4
estimated spill area: 0.0839
latitude: 4.55575
longitude: 6.706861
cause: sabotage
cause detail:
cleanup / recovery duratiom: 12
terrain: Swamp
delay:
incident year: 2012
site location name: 16'' Eriemu - UPS Pipeline at Ekrejebor
estimated quantity spilled: 1251.7
estimated spill area:
latitude: 5.522611
longitude: 6.031972
cause: sabotage
cause detail:
cleanup / recovery duratiom: 22
terrain: Land
delay:
incident year: 2012
site location name: 16' Egbema - Assa Trunkline at Obile
estimated quantity spilled: 2.4
estimated spill area:
latitude: 5.404111
longitude: 6.786083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 7
terrain: Land
delay:
incident year: 2012
site location name: 24' Nembe Creek - Cawthorne Channel Pipeline behind Sego manifold
estimated quantity spilled: 86.7
estimated spill area: 0.0726
latitude: 4.499417
longitude: 6.613917
cause: sabotage
cause detail:
cleanup / recovery duratiom: 149
terrain: Swamp
delay:
incident year: 2012
site location name: 16'' Uzere - Eriemu Pipeline at Iyede
estimated quantity spilled: 0.83
estimated spill area:
latitude: 5.493944
longitude: 6.090111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 44
terrain: Land
delay:
incident year: 2012
site location name: 18' Assa - Rumuekpe Pipeline at Egbeda
estimated quantity spilled: 1.3
estimated spill area: 0.0002
latitude: 5.225917
longitude: 6.766667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 12
terrain: Land
delay:
incident year: 2012
site location name: 24' Nembecreek - Cawthorne channel Pipeline near Tora Manifold
estimated quantity spilled: 118.5
estimated spill area: 0.0024
latitude: 4.476611
longitude: 6.482333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 124
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2012
site location name: Agbada Well 34S Flowline At Omuohia / Omueke
estimated quantity spilled: 7.7
estimated spill area: 0.0021
latitude: 4.928583
longitude: 7.025222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 108
terrain: Swamp
delay:
incident year: 2012
site location name: 18' Assa - Rumuekpe Trunkline at Omudioga.
estimated quantity spilled: 2
estimated spill area:
latitude: 5.156972
longitude: 6.749528
cause: sabotage
cause detail:
cleanup / recovery duratiom: 75
terrain: Land
delay:
incident year: 2012
site location name: 24” Nkpoku-Bomu Pipeline at Bera.
estimated quantity spilled: 34.3
estimated spill area: 0.0004
latitude: 4.686
longitude: 7.277722
cause: sabotage
cause detail:
cleanup / recovery duratiom: 78
terrain: Land
delay:
incident year: 2012
site location name: Benisede Well 11S
estimated quantity spilled: 15.3
estimated spill area:
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom: 35
terrain: Swamp
delay:
incident year: 2012
site location name: 24' Nembe Creek - Cawthorne Channel Pipeline at Sego manifold
estimated quantity spilled: 561.2
estimated spill area: 0.1322
latitude: 4.500333
longitude: 6.605333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 80
terrain: Swamp
delay:
incident year: 2012
site location name: Agbada 2 Well 69S Flowline at Umuokwa
estimated quantity spilled: 1.3
estimated spill area: 0.0002
latitude: 4.9335
longitude: 7.053139
cause: sabotage
cause detail:
cleanup / recovery duratiom: 95
terrain: Land
delay:
incident year: 2012
site location name: 14' Okordia - Rumuekpe Trunkline at Ikarama
estimated quantity spilled: 13.1
estimated spill area: 0.0039
latitude: 5.134556
longitude: 6.4695
cause: sabotage
cause detail:
cleanup / recovery duratiom: 109
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2012
site location name: Oroni Well 7L ;3L & 3S Flowline
estimated quantity spilled: 2.1
estimated spill area:
latitude: 5.360333
longitude: 6.152611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 67
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2012
site location name: 24' Nkpoku - Bomu Pipeline at Nonwa
estimated quantity spilled: 326.5
estimated spill area: 0.0016
latitude: 4.743917
longitude: 7.244917
cause: sabotage
cause detail:
cleanup / recovery duratiom: 74
terrain: Land
delay:
incident year: 2012
site location name: 24' Nkpoku - Bomu Pipeline at Botem
estimated quantity spilled: 0.64
estimated spill area: 0.0001
latitude: 4.722
longitude: 7.274222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 2
terrain: Land
delay:
incident year: 2012
site location name: 28' Nkpoku -Bomu Pipeline at Gio
estimated quantity spilled: 158.2
estimated spill area: 0.039484
latitude: 4.694056
longitude: 7.243861
cause: sabotage
cause detail:
cleanup / recovery duratiom: 301
terrain: Land
delay:
incident year: 2012
site location name: 10' Diebu Creek Pipeline at Onyoma
estimated quantity spilled: 55.4
estimated spill area: 0.0168
latitude: 4.757111
longitude: 6.103306
cause: sabotage
cause detail:
cleanup / recovery duratiom: 189
terrain: Swamp
delay: community
incident year: 2011
site location name: 10' Ekulama 1 Pipeline at Free Town
estimated quantity spilled: 150
estimated spill area: 0.7077
latitude: 4.533528
longitude: 6.683611
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 173
terrain: Swamp / Water
delay: community
incident year: 2012
site location name: 28' Nkpoku - Bomu Pipeline at Gio
estimated quantity spilled: 9.8
estimated spill area: 0.00076
latitude: 4.69975
longitude: 7.246472
cause: sabotage
cause detail:
cleanup / recovery duratiom: 289
terrain: Land
delay:
incident year: 2012
site location name: 18' Assa - Rumuekpe Trunkline at Egbeda
estimated quantity spilled: 4.2
estimated spill area: 0.000889
latitude: 5.256972
longitude: 6.773972
cause: sabotage
cause detail:
cleanup / recovery duratiom: 78
terrain: Land
delay:
incident year: 2012
site location name: 36' Rumuekpe - Nkpoku Pipeline at Mgbodo Aluu
estimated quantity spilled: 379.1
estimated spill area: 0.0447
latitude: 4.926917
longitude: 6.974667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 81
terrain: Land
delay:
incident year: 2012
site location name: 8' Umuechem - Nkpoku delivery line at Umuechem
estimated quantity spilled: 10.9
estimated spill area: 0.0006
latitude: 5.001972
longitude: 7.021194
cause: sabotage
cause detail:
cleanup / recovery duratiom: 59
terrain: Land
delay:
incident year: 2012
site location name: Cawthorne Channel 2 Well 51 T at Mbiama
estimated quantity spilled: 1.8
estimated spill area: 0.0009
latitude: 4.554556
longitude: 7.005611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 64
terrain: Swamp
delay:
incident year: 2012
site location name: Ekulama 2 Well 38L Flowline at Freetown
estimated quantity spilled: 9
estimated spill area: 0.0273
latitude: 4.536889
longitude: 6.663528
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 131
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2012
site location name: 8' Umuechem - Nkpoku Pipeline at Omusele
estimated quantity spilled: 5.6
estimated spill area: 0.0013
latitude: 4.971028
longitude: 7.025667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 55
terrain: Land
delay:
incident year: 2012
site location name: 36' Nkpoku - Bomu Trunkline at Eneka.
estimated quantity spilled: 88
estimated spill area: 0.0031
latitude: 4.896389
longitude: 7.053889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 100
terrain: Land
delay:
incident year: 2012
site location name: 36' Nkpoku-Bomu Trunkline at Atali
estimated quantity spilled: 60
estimated spill area: 0.009
latitude: 4.887
longitude: 7.064778
cause: sabotage
cause detail:
cleanup / recovery duratiom: 96
terrain: Land
delay:
incident year: 2012
site location name: 20' Rumuekpe – Nkpoku Trunkline at Ibaa
estimated quantity spilled: 200.2
estimated spill area: 0.0223
latitude: 4.95375
longitude: 6.832972
cause: sabotage
cause detail:
cleanup / recovery duratiom: 81
terrain: Land
delay:
incident year: 2014
site location name: 28'' Nembe Creek Pipeline at Boro (Kula)
estimated quantity spilled: 75
estimated spill area: 0.022
latitude: 4.5370556
longitude: 6.7549861
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 248
terrain: Swamp
delay:
incident year: 2014
site location name: Santa Barbara Mobile Production Facility at Nembe-Bassambiri
estimated quantity spilled: 0.2
estimated spill area: 0.000001
latitude: 4.5386389
longitude: 6.5031667
cause: operational
cause detail: (operational and maintenance error )
cleanup / recovery duratiom: 177
terrain: Swamp
delay:
incident year: 2012
site location name: 8' Umuechem - Nkpoku Delivery Line at Umusele
estimated quantity spilled: 22.4
estimated spill area: 0.00343
latitude: 4.970528
longitude: 7.02625
cause: sabotage
cause detail:
cleanup / recovery duratiom: 41
terrain: Land
delay:
incident year: 2012
site location name: 8' Umuechem - Nkpoku Delivery Line at Umuechem
estimated quantity spilled: 33.5
estimated spill area: 0.000861
latitude: 5.002889
longitude: 7.021056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 33
terrain: Land
delay:
incident year: 2012
site location name: 24' Alakiri - Bonny Trunkline at Kalaibiama
estimated quantity spilled: 24.3
estimated spill area: 0.0001
latitude: 4.49675
longitude: 7.140444
cause: sabotage
cause detail:
cleanup / recovery duratiom: 140
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2012
site location name: 28' Nkpoku - Bomu Trunkline at Ejamah
estimated quantity spilled: 1076
estimated spill area: 0.047
latitude: 4.758528
longitude: 7.163167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 15
terrain: Land
delay:
incident year: 2012
site location name: 24' Nkpoku - Bomu Trunkline at Kira
estimated quantity spilled: 45
estimated spill area: 0.001046
latitude: 4.644889
longitude: 7.277528
cause: sabotage
cause detail:
cleanup / recovery duratiom: 343
terrain: Land
delay:
incident year: 2012
site location name: 8' Isimiri - Imo Gate delivery line at Obiakpu
estimated quantity spilled: 55.5
estimated spill area: 0.001145
latitude: 4.887028
longitude: 7.188472
cause: sabotage
cause detail:
cleanup / recovery duratiom: 31
terrain: Land
delay:
incident year: 2012
site location name: Imo River Well 48L Flowline at Imo River
estimated quantity spilled: 32
estimated spill area:
latitude: 4.995056
longitude: 7.176083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 246
terrain: Land
delay:
incident year: 2012
site location name: 12' Imo River-Ogale Trunk line at Owaza
estimated quantity spilled: 87.7
estimated spill area: 0.0026
latitude: 4.980083
longitude: 7.175722
cause: sabotage
cause detail:
cleanup / recovery duratiom: 239
terrain: Land
delay:
incident year: 2012
site location name: 28' Nkpoku - Bomu Pipeline at Gio
estimated quantity spilled: 35.8
estimated spill area: 0.0013
latitude: 4.699833
longitude: 7.246389
cause: sabotage
cause detail:
cleanup / recovery duratiom: 5
terrain: Land
delay:
incident year: 2012
site location name: 24'/28' Bomu - Bonny Terminal Right of Way at Mogho
estimated quantity spilled: 398
estimated spill area: 0.011767
latitude: 4.640861
longitude: 7.27775
cause: sabotage
cause detail:
cleanup / recovery duratiom: 440
terrain: Land
delay: community
incident year: 2011
site location name: Krakama Well 13 at Bille
estimated quantity spilled: 22.7
estimated spill area:
latitude: 4.538639
longitude: 6.917028
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 78
terrain: Swamp
delay: community
incident year: 2012
site location name: Nembe 1 Well 19S at Nembe
estimated quantity spilled: 4.9
estimated spill area:
latitude: 4.436944
longitude: 6.317972
cause: sabotage
cause detail:
cleanup / recovery duratiom: 32
terrain: Swamp
delay: cause of spill dispute
incident year: 2012
site location name: 28' Nkpoku - Bomu Pipeline at Gio.
estimated quantity spilled: 67
estimated spill area: 0.0006
latitude: 4.700083
longitude: 7.246167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 5
terrain: Land
delay:
incident year: 2012
site location name: Imo River Well 44S Flow line Right of Way (ROW) behind Imo River Well 5 at Igiriukwu / Owaza
estimated quantity spilled: 76
estimated spill area: 0.0054
latitude: 4.984472
longitude: 7.178194
cause: sabotage
cause detail:
cleanup / recovery duratiom: 43
terrain: Land
delay:
incident year: 2012
site location name: 4' Obelle - Ibaa Delivery Line at Ibaa
estimated quantity spilled: 95.7
estimated spill area: 0.00812
latitude: 4.971806
longitude: 6.804306
cause: sabotage
cause detail:
cleanup / recovery duratiom: 29
terrain: Land
delay:
incident year: 2012
site location name: Agbada 2 Well 41/42/43 Wellheads at Umuohia
estimated quantity spilled: 15.05
estimated spill area: 0.0008
latitude: 4.931139
longitude: 7.021694
cause: sabotage
cause detail:
cleanup / recovery duratiom: 81
terrain: Land
delay:
incident year: 2012
site location name: Cawthorne Channel 1 Well 49L at Cawthorne Channel
estimated quantity spilled: 16.89
estimated spill area: 0.0008
latitude: 4.557167
longitude: 7.036306
cause: sabotage
cause detail:
cleanup / recovery duratiom: 82
terrain: Swamp
delay:
incident year: 2013
site location name: 10' Ekulama Pipeline at Ekulama
estimated quantity spilled: 194
estimated spill area: 0.0883
latitude: 4.5405278
longitude: 6.6906389
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 369
terrain: Swamp
delay:
incident year: 2012
site location name: 28' Trans Niger Pipeline at Okolo
estimated quantity spilled: 88.4
estimated spill area: 0.10626
latitude: 4.504694
longitude: 7.223
cause: sabotage
cause detail:
cleanup / recovery duratiom: 252
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2012
site location name: 28' Nkpoku - Bomu Trans Niger Pipeline at Aleto
estimated quantity spilled: 4
estimated spill area: 0.000066
latitude: 4.808722
longitude: 7.104056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 59
terrain: Land
delay:
incident year: 2012
site location name: 8'' Obigbo North - Elelenwa Pipeline at Umusia
estimated quantity spilled: 511.6
estimated spill area: 0.0015
latitude: 4.859806
longitude: 7.135667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 271
terrain: Land
delay:
incident year: 2012
site location name: 12” Imo River 2 Pipeline at Odagwa
estimated quantity spilled: 26
estimated spill area: 0.001589
latitude: 4.981944
longitude: 7.169139
cause: sabotage
cause detail:
cleanup / recovery duratiom: 13
terrain: Land
delay:
incident year: 2012
site location name: 10' Diebu - Nun-River Delivery line at Ekowe
estimated quantity spilled: 26
estimated spill area: 0.0483
latitude: 4.740528
longitude: 6.101444
cause: sabotage
cause detail:
cleanup / recovery duratiom: 91
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2012
site location name: 8' Obigbo North - Komkom Pipeline at Umuokolobo
estimated quantity spilled: 20
estimated spill area: 0.0004
latitude: 4.869417
longitude: 7.135472
cause: sabotage
cause detail:
cleanup / recovery duratiom: 133
terrain: Land
delay:
incident year: 2012
site location name: 28' Nkpoku - Bomu Pipeline at Gio
estimated quantity spilled: 111
estimated spill area: 0.001188
latitude: 4.703778
longitude: 7.243222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 366
terrain: Land
delay: community
incident year: 2012
site location name: 24' Bomu-Bonny Pipeline at Mogho
estimated quantity spilled: 14
estimated spill area: 0.000379
latitude: 4.644889
longitude: 7.277528
cause: sabotage
cause detail:
cleanup / recovery duratiom: 6
terrain: Land
delay:
incident year: 2012
site location name: 12'' Imo River - Oghale Pipeline at Uzuaku
estimated quantity spilled: 33
estimated spill area: 0.002
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom: 33
terrain: Land
delay:
incident year: 2012
site location name: Imo River 1 Well 25S Flowline at Owaza
estimated quantity spilled: 7
estimated spill area: 0.000033
latitude: 4.979917
longitude: 7.175694
cause: sabotage
cause detail:
cleanup / recovery duratiom: 35
terrain: Land
delay:
incident year: 2013
site location name: 10' Ekulama-1 Delivery Line at Ekulama
estimated quantity spilled: 92
estimated spill area: 0.1329
latitude: 4.543722
longitude: 6.693806
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 436
terrain: Swamp
delay:
incident year: 2014
site location name: 10' Ekulama 1 - Sanbarth Pipeline at SanBarth / Ekulama
estimated quantity spilled: 143
estimated spill area: 0.098
latitude: 4.5439444
longitude: 6.6941111
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 235
terrain: Swamp
delay:
incident year: 2012
site location name: Imo River 1 Well 18 Flow Line at Owaza
estimated quantity spilled: 366
estimated spill area: 0.0028
latitude: 4.981167
longitude: 7.17325
cause: sabotage
cause detail:
cleanup / recovery duratiom: 36
terrain: Land
delay:
incident year: 2012
site location name: 6' Obigbo North - New Elelenwo Pipeline at Umusonya
estimated quantity spilled: 721
estimated spill area: 0.0011
latitude: 4.854694
longitude: 7.140528
cause: sabotage
cause detail:
cleanup / recovery duratiom: 222
terrain: Land
delay:
incident year: 2012
site location name: 12' Imo River 1 and 2 - Ogale Pipeline at komkom
estimated quantity spilled: 4689
estimated spill area: 0.4651
latitude: 4.876833
longitude: 7.172583
cause: sabotage
cause detail:
cleanup / recovery duratiom: 210
terrain: Land
delay:
incident year: 2012
site location name: 4' Otamiri Well 8L Flowline at Umuechem
estimated quantity spilled: 23
estimated spill area: 0.000467
latitude: 5.023056
longitude: 7.006333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 202
terrain: Land
delay:
incident year: 2012
site location name: 24' Nkpoku - Bomu Trunkline at Kira
estimated quantity spilled: 242
estimated spill area: 0.02385
latitude: 4.730917
longitude: 7.262111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 142
terrain: Land
delay:
incident year: 2012
site location name: 8' Ubie Pipeline at Ukpeliede Manifold
estimated quantity spilled: 170.6
estimated spill area: 0.002623
latitude: 5.085222
longitude: 6.53925
cause: sabotage
cause detail:
cleanup / recovery duratiom: 104
terrain: Land
delay: cause of spill dispute
incident year: 2011
site location name: 10' Ekulama 2 Pipeline at Ekulama
estimated quantity spilled: 15
estimated spill area: 0.086839
latitude: 4.549472
longitude: 6.667889
cause: operational
cause detail: (sabotage)
cleanup / recovery duratiom: 142
terrain: Swamp / Water
delay: other (terrain, floods, ...)
incident year: 2012
site location name: Santa Barbara Well 11 T at Santa Barbara
estimated quantity spilled: 1
estimated spill area:
latitude: 4.549611
longitude: 6.534083
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 81
terrain: Swamp
delay:
incident year: 2011
site location name: Awoba North West Well1 L/S Flowline at Awoba
estimated quantity spilled: 10
estimated spill area: 0.01
latitude: 4.550056
longitude: 6.770528
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 68
terrain: Swamp
delay:
incident year: 2014
site location name: Ekulama 2 Well 36L Flowline at FreeTown (Kula)
estimated quantity spilled: 8
estimated spill area:
latitude: 4.5500833
longitude: 6.6727778
cause: operational
cause detail:
cleanup / recovery duratiom: 281
terrain: Swamp
delay: community
incident year: 2012
site location name: 8' Isimiri Pipeline at Obiakpu
estimated quantity spilled: 312
estimated spill area: 0.0011
latitude: 4.887028
longitude: 7.188611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 178
terrain: Land
delay:
incident year: 2012
site location name: Imo River Well 64S Flowline at Imo River
estimated quantity spilled: 603
estimated spill area: 0.0258
latitude: 4.980056
longitude: 7.179306
cause: sabotage
cause detail:
cleanup / recovery duratiom: 38
terrain: Land
delay:
incident year: 2013
site location name: 24' Nkpoku - Bomu Pipeline at Sime
estimated quantity spilled: 5
estimated spill area: 0.0002
latitude: 4.773778
longitude: 7.207389
cause: sabotage
cause detail:
cleanup / recovery duratiom: 5
terrain: Swamp
delay:
incident year: 2013
site location name: 8' Isimiri Pipeline at Uzuakwu
estimated quantity spilled: 201
estimated spill area: 0.001
latitude: 4.889861
longitude: 7.175611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 686
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2011
site location name: 12” Cawthorne channel I Pipeline at Cawthorne Channel
estimated quantity spilled: 3.1
estimated spill area: 0.0031
latitude: 4.550614
longitude: 7.060639
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 180
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2013
site location name: 10' Diebu Creek - Nun River Pipeline at Onyoma
estimated quantity spilled: 65
estimated spill area: 0.0079
latitude: 4.767694
longitude: 6.104528
cause: sabotage
cause detail:
cleanup / recovery duratiom: 127
terrain: Swamp
delay:
incident year: 2013
site location name: 24' Bomu - Bonny Pipeline at Mogho
estimated quantity spilled: 18
estimated spill area: 0.0014
latitude: 4.648861
longitude: 7.277222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 28
terrain: Land
delay:
incident year: 2013
site location name: 10' Santa Barbara Pipeline at Santa Barbara
estimated quantity spilled: 22
estimated spill area: 0.0215
latitude: 4.52925
longitude: 6.499194
cause: sabotage
cause detail:
cleanup / recovery duratiom: 118
terrain: Land
delay:
incident year: 2013
site location name: 8' Umuechem - Nkpoku Pipeline at Omunwei near Igwuruta
estimated quantity spilled: 5
estimated spill area: 0.000251
latitude: 4.982667
longitude: 7.023944
cause: sabotage
cause detail:
cleanup / recovery duratiom: 237
terrain: Land
delay:
incident year: 2013
site location name: 10' Ekulama-Sanbarth Pipeline at New Town
estimated quantity spilled: 20
estimated spill area: 0.0855
latitude: 4.558722
longitude: 6.708889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 166
terrain: Swamp
delay: cause of spill dispute
incident year: 2013
site location name: 12' Imo River - Ogale Pipeline at Uzuaku
estimated quantity spilled: 105
estimated spill area: 0.0002
latitude: 4.894667
longitude: 7.177056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 99
terrain: Land
delay:
incident year: 2011
site location name: Cawthorne Channel 2 F/S Well 51T Flowline RoW
estimated quantity spilled: 2.6
estimated spill area: 0.0011
latitude: 4.553333
longitude: 7.005556
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 40
terrain: Swamp
delay:
incident year: 2013
site location name: 8' Umuechem - Nkpoku Delivery Line at Umuwenye
estimated quantity spilled: 47
estimated spill area: 0.00157
latitude: 4.98075
longitude: 7.024222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 215
terrain: Land
delay:
incident year: 2013
site location name: 12' Imo River 2 Pipeline at Odagwa
estimated quantity spilled: 7
estimated spill area: 0.0002
latitude: 4.982083
longitude: 7.169028
cause: sabotage
cause detail:
cleanup / recovery duratiom: 162
terrain: Land
delay:
incident year: 2013
site location name: 2' Imo River 1 Well 13 Gas Lift Line at Igiriukwu / Isi-Etitioha
estimated quantity spilled: 6
estimated spill area: 0.00021
latitude: 4.979139
longitude: 7.179778
cause: sabotage
cause detail:
cleanup / recovery duratiom: 170
terrain: Land
delay:
incident year: 2011
site location name: Cawthorne Channel Well 29T Flowline at Cawthorne Channel
estimated quantity spilled: 6.97
estimated spill area:
latitude: 4.553917
longitude: 7.005611
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2011
site location name: Well 29T flowline at Cawthorne Channel
estimated quantity spilled: 0.7
estimated spill area: 0.0011
latitude: 4.554056
longitude: 7.005611
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 78
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2013
site location name: 30' Nembe Creek Trunkline near Awoba
estimated quantity spilled: 634
estimated spill area: 0.1099
latitude: 4.567889
longitude: 6.861417
cause: sabotage
cause detail:
cleanup / recovery duratiom: 173
terrain: Swamp
delay:
incident year: 2013
site location name: 12” Oguta - Egbema Pipeline at Obiakpu
estimated quantity spilled: 310
estimated spill area: 0.006017
latitude: 5.573028
longitude: 6.76075
cause: sabotage
cause detail:
cleanup / recovery duratiom: 8
terrain: Land
delay:
incident year: 2013
site location name: 4' Imo River Well 64L Flow line at Igiriukwu
estimated quantity spilled: 38
estimated spill area:
latitude: 4.980694
longitude: 7.178556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 579
terrain: Land
delay:
incident year: 2013
site location name: 12' Oguta - Egbema Pipeline at Opuoma Oguta
estimated quantity spilled: 33
estimated spill area: 0.0008
latitude: 5.592333
longitude: 6.759694
cause: sabotage
cause detail:
cleanup / recovery duratiom: 144
terrain: Land
delay:
incident year: 2013
site location name: 8' Nkali Pipeline at Umuedeokwara (Odagwa)
estimated quantity spilled: 52
estimated spill area: 0.0003
latitude: 4.98725
longitude: 7.160972
cause: sabotage
cause detail:
cleanup / recovery duratiom: 97
terrain: Land
delay:
incident year: 2013
site location name: 4' Adibawa Well 8S Flowline at Edagberi
estimated quantity spilled: 2
estimated spill area:
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom: 171
terrain: Land
delay:
incident year: 2013
site location name: 4' Adibawa Well 8S Flowline at Edagberi
estimated quantity spilled: 7
estimated spill area: 0.0001
latitude: 5.1978333
longitude: 6.5436944
cause: sabotage
cause detail:
cleanup / recovery duratiom: 599
terrain: Land
delay:
incident year: 2011
site location name: Cawthorne Channel Well 29T Flowline at Cawthorne Channel
estimated quantity spilled: 2.4
estimated spill area: 0.0035
latitude: 4.554083
longitude: 7.005583
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 58
terrain: Swamp
delay:
incident year: 2013
site location name: 24” Nembe Creek Pipeline at Aberedo-a Owuangai
estimated quantity spilled: 38
estimated spill area: 0.01123
latitude: 4.488722
longitude: 6.589167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 162
terrain: Swamp
delay:
incident year: 2013
site location name: 12' Imo River 2 - Ogale Pipeline at Kom Kom
estimated quantity spilled: 658
estimated spill area: 0.0165
latitude: 4.876667
longitude: 7.172611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 31
terrain: Land
delay:
incident year: 2013
site location name: 30' Nembe Creek Pipeline at Bille
estimated quantity spilled: 5
estimated spill area:
latitude: 4.561278
longitude: 6.845611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 86
terrain: Swamp
delay:
incident year: 2013
site location name: 24'' Nkpoku - Bomu Pipeline at Elelenwa
estimated quantity spilled: 442
estimated spill area: 0.0005
latitude: 4.857083
longitude: 7.099722
cause: sabotage
cause detail:
cleanup / recovery duratiom: 121
terrain: Land
delay:
incident year: 2013
site location name: 6' Adibawa North East 6 Bulk line at Biseni
estimated quantity spilled: 2
estimated spill area:
latitude: 5.212917
longitude: 6.517611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 149
terrain: Land
delay:
incident year: 2013
site location name: 24' Nembe Creek Pipeline at Kalibiama
estimated quantity spilled: 62
estimated spill area:
latitude: 4.498917
longitude: 7.135778
cause: sabotage
cause detail:
cleanup / recovery duratiom: 99
terrain: Swamp
delay:
incident year: 2013
site location name: 30' Nembe Creek Pipeline at Bille
estimated quantity spilled: 124
estimated spill area: 0.000172
latitude: 4.56475
longitude: 6.845611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 318
terrain: Swamp
delay:
incident year: 2013
site location name: 4' Adibawa Well 2S Flowline at Adibawa
estimated quantity spilled: 7
estimated spill area:
latitude: 5.193694
longitude: 6.493083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 15
terrain: Land
delay:
incident year: 2013
site location name: 30' Nembe Creek Pipeline (Awoba North-East) @ Boro (Kula)
estimated quantity spilled: 17
estimated spill area: 0.0023
latitude: 4.551333
longitude: 6.780861
cause: sabotage
cause detail:
cleanup / recovery duratiom: 172
terrain: Swamp
delay:
incident year: 2013
site location name: 4' Adibawa North East Well 1L Flowline at Biseni
estimated quantity spilled: 11
estimated spill area:
latitude: 5.256583
longitude: 6.523222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 147
terrain: Land
delay:
incident year: 2013
site location name: 8' Ubie-Ukpeliede Pipeline at Idu-Ekpeye
estimated quantity spilled: 49
estimated spill area: 0.0021
latitude: 5.095472
longitude: 6.546083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 421
terrain: Land
delay:
incident year: 2013
site location name: 12' Oguta - Egbema Pipeline at Obiakpu
estimated quantity spilled: 2
estimated spill area: 0.0003
latitude: 5.573111
longitude: 6.76075
cause: sabotage
cause detail:
cleanup / recovery duratiom: 86
terrain: Land
delay:
incident year: 2013
site location name: 12' Imo River II Pipeline at Umuedeokwara Odagwa
estimated quantity spilled: 8
estimated spill area:
latitude: 4.981889
longitude: 7.169139
cause: sabotage
cause detail:
cleanup / recovery duratiom: 88
terrain: Land
delay: cause of spill dispute
incident year: 2013
site location name: 24' Nkpoku - Bomu Pipeline at Egbalor
estimated quantity spilled: 0.2
estimated spill area: 0.00001
latitude: 4.784278
longitude: 7.189389
cause: sabotage
cause detail:
cleanup / recovery duratiom: 1
terrain: Land
delay:
incident year: 2013
site location name: 6' Obigbo North - Komkom Pipeline at Komkom
estimated quantity spilled: 46
estimated spill area: 0.00071
latitude: 4.856639
longitude: 7.15125
cause: sabotage
cause detail:
cleanup / recovery duratiom: 7
terrain: Land
delay:
incident year: 2013
site location name: 24' Nkpoku - Bomu Pipeline at Egbalor
estimated quantity spilled: 13
estimated spill area:
latitude: 4.782194
longitude: 7.192944
cause: sabotage
cause detail:
cleanup / recovery duratiom: 6
terrain: Land
delay:
incident year: 2013
site location name: 28' Bomu - Bonny Trans Niger Pipeline at Bodo West
estimated quantity spilled: 24
estimated spill area: 0.0026
latitude: 4.579861
longitude: 7.252889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 564
terrain: Swamp
delay: community
incident year: 2013
site location name: 12' Adibawa-Okordia Pipeline at Ikarama
estimated quantity spilled: 10
estimated spill area: 0.0001
latitude: 5.154972
longitude: 6.457
cause: sabotage
cause detail:
cleanup / recovery duratiom: 117
terrain: Land
delay:
incident year: 2013
site location name: 24' Nembe Creek Pipeline at Adamakiri
estimated quantity spilled: 38
estimated spill area: 0.000559
latitude: 4.517333
longitude: 7.10675
cause: sabotage
cause detail:
cleanup / recovery duratiom: 545
terrain: Swamp
delay:
incident year: 2013
site location name: 12' Imo River II - Ogale TNP at Odagwa
estimated quantity spilled: 35
estimated spill area: 0.0004
latitude: 4.980778
longitude: 7.170417
cause: sabotage
cause detail:
cleanup / recovery duratiom: 132
terrain: Land
delay:
incident year: 2013
site location name: 24' Bomu - Bonny Pipeline at Bodo West
estimated quantity spilled: 27
estimated spill area: 0.005
latitude: 4.564417
longitude: 7.252778
cause: sabotage
cause detail:
cleanup / recovery duratiom: 762
terrain: Swamp
delay: community
incident year: 2013
site location name: 24' Nembe Creek Pipeline at Adamakiri
estimated quantity spilled: 16
estimated spill area: 0.000024
latitude: 4.527778
longitude: 7.09325
cause: sabotage
cause detail:
cleanup / recovery duratiom: 329
terrain: Swamp
delay:
incident year: 2013
site location name: 8' Ubie-Ukpeliede Pipeline at Idu-Ekpeye
estimated quantity spilled: 54
estimated spill area: 0.002372
latitude: 5.092222
longitude: 6.543917
cause: sabotage
cause detail:
cleanup / recovery duratiom: 287
terrain: Land
delay:
incident year: 2011
site location name: Cawthorne Channel Well 24T FL ROW at Cawthorne Channel
estimated quantity spilled: 0.9
estimated spill area:
latitude: 4.554111
longitude: 7.005583
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2013
site location name: 20’’ Opukushi – Brass Creek Pipeline at Tamogbene
estimated quantity spilled: 102
estimated spill area:
latitude: 4.949139
longitude: 5.669186
cause: sabotage
cause detail:
cleanup / recovery duratiom: 71
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2013
site location name: 20'' Otumara-Saghara Pipeline at Otumara
estimated quantity spilled: 135
estimated spill area:
latitude: 5.615472
longitude: 5.172833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 33
terrain: Swamp
delay:
incident year: 2013
site location name: 28' Bomu - Bonny Trans Niger Pipeline at Bodo West
estimated quantity spilled: 508
estimated spill area:
latitude: 4.584778
longitude: 7.256222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 751
terrain: Swamp
delay:
incident year: 2013
site location name: 28' Bomu - Bonny Trans Niger Pipeline at Bodo City
estimated quantity spilled: 2699
estimated spill area:
latitude: 4.574694
longitude: 7.254139
cause: sabotage
cause detail:
cleanup / recovery duratiom: 741
terrain: Swamp
delay:
incident year: 2013
site location name: 28' Bomu - Bonny Trans Niger Pipeline at Bodo City
estimated quantity spilled: 166
estimated spill area: 0.0008
latitude: 4.587028
longitude: 7.256472
cause: sabotage
cause detail:
cleanup / recovery duratiom: 732
terrain: Land
delay:
incident year: 2013
site location name: 6' Obigbo North _Ogale Pipeline at Ogale
estimated quantity spilled: 3
estimated spill area: 0.0003
latitude: 4.830722
longitude: 7.155472
cause: sabotage
cause detail:
cleanup / recovery duratiom: 103
terrain: Land
delay:
incident year: 2013
site location name: 12' Oguta - Egbema Pipeline at Obiakpu
estimated quantity spilled: 63
estimated spill area: 0.0007
latitude: 5.558639
longitude: 6.761583
cause: sabotage
cause detail:
cleanup / recovery duratiom: 8
terrain: Land
delay:
incident year: 2013
site location name: 36' Rumuekpe - Nkpoku Pipeline at Ibaa
estimated quantity spilled: 17
estimated spill area: 0.000568
latitude: 4.9548056
longitude: 6.7934167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 15
terrain: Land
delay:
incident year: 2013
site location name: 4' Cawthorne Channel 2 well 29T at Mbiama
estimated quantity spilled: 7.8
estimated spill area: 0.0003
latitude: 4.554222
longitude: 7.005583
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 255
terrain: Swamp
delay:
incident year: 2013
site location name: 10' Diebu Creek - Nun River Pipeline at Onyoma /Eniwari
estimated quantity spilled: 110
estimated spill area: 0.0078
latitude: 4.767972
longitude: 6.104556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 45
terrain: Swamp
delay:
incident year: 2013
site location name: 6' Imo River Pipeline at Ogale
estimated quantity spilled: 71
estimated spill area:
latitude: 4.820278
longitude: 7.154222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 126
terrain: Land
delay:
incident year: 2013
site location name: 20' Otumara - Escravos Pipeline at Ajudaibo
estimated quantity spilled: 10
estimated spill area:
latitude: 5.566806
longitude: 5.204389
cause: sabotage
cause detail:
cleanup / recovery duratiom: 286
terrain: Swamp
delay:
incident year: 2013
site location name: 20' Otumara-Escravos Pipeline at Otumara axis
estimated quantity spilled: 3
estimated spill area:
latitude: 5.633306
longitude: 5.158083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 252
terrain: Swamp
delay:
incident year: 2013
site location name: 12' Imo River 2 - Ogale Pipeline at Umuedeokwara Odagwa
estimated quantity spilled: 47
estimated spill area: 0.0009
latitude: 4.980806
longitude: 7.170278
cause: sabotage
cause detail:
cleanup / recovery duratiom: 75
terrain: Land
delay:
incident year: 2013
site location name: 6' Cawthorne Channel 3 Well 4S Flowline at Krakrama
estimated quantity spilled: 3
estimated spill area: 0.0006
latitude: 4.52725
longitude: 6.958361
cause: sabotage
cause detail:
cleanup / recovery duratiom: 191
terrain: Swamp
delay:
incident year: 2013
site location name: 14' Okordia-Rumuekpe Pipeline at Akaramini
estimated quantity spilled: 9
estimated spill area: 0.00064
latitude: 5.119
longitude: 6.487167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 284
terrain: Land
delay:
incident year: 2013
site location name: 24' Nkpoku-Bomu Trans Niger Pipeline at Biara
estimated quantity spilled: 8
estimated spill area: 0.0001
latitude: 4.686917
longitude: 7.277833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 5
terrain: Land
delay:
incident year: 2013
site location name: 8' Isimiri - Imo Gate Delivery line at Obiakpu
estimated quantity spilled: 47
estimated spill area:
latitude: 4.88575
longitude: 7.194889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 154
terrain: Land
delay:
incident year: 2013
site location name: 28' Bomu Bonny Pipeline at Freetown
estimated quantity spilled: 196
estimated spill area: 0.1092
latitude: 4.513389
longitude: 7.231056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 250
terrain: Swamp
delay:
incident year: 2013
site location name: 4' Imo River Well 55S Flowline at Igiriukwu
estimated quantity spilled: 5
estimated spill area: 0.00063
latitude: 4.994972
longitude: 7.176139
cause: sabotage
cause detail:
cleanup / recovery duratiom: 233
terrain: Land
delay:
incident year: 2013
site location name: 12'' Imo River - Ogale Pipeline at Umuedeokwara (Odagwa)
estimated quantity spilled: 54
estimated spill area:
latitude: 4.980806
longitude: 7.170333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 63
terrain: Land
delay:
incident year: 2013
site location name: 14' Adibawa-Okordia Pipeline at Ikarama
estimated quantity spilled: 447
estimated spill area: 0.0098
latitude: 5.1531947
longitude: 6.4531669
cause: sabotage
cause detail:
cleanup / recovery duratiom: 286
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2013
site location name: 24' Nkpoku - Bomu Pipeline at Bera
estimated quantity spilled: 9
estimated spill area: 0.00003
latitude: 4.68075
longitude: 7.276889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 296
terrain: Land
delay:
incident year: 2013
site location name: Imo River Well 22S Flowline at Igiriukwu
estimated quantity spilled: 112
estimated spill area:
latitude: 4.980139
longitude: 7.183444
cause: sabotage
cause detail:
cleanup / recovery duratiom: 295
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2013
site location name: 6'' Obigbo North - Ogale Pipeline at Ogale
estimated quantity spilled: 52
estimated spill area:
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2013
site location name: 12' Imo River - Ogale Pipeline at Owaza
estimated quantity spilled: 734
estimated spill area: 0.0023
latitude: 4.945056
longitude: 7.184806
cause: sabotage
cause detail:
cleanup / recovery duratiom: 181
terrain: Land
delay:
incident year: 2013
site location name: 20' Rumuekpe - Nkpoku Pipeline at Ibaa
estimated quantity spilled: 1070
estimated spill area:
latitude: 4.95375
longitude: 6.833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 235
terrain: Land
delay:
incident year: 2011
site location name: Cawthorne Channel Well 21L ROW at Mbiama
estimated quantity spilled: 0.93
estimated spill area:
latitude: 4.55425
longitude: 7.010806
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 91
terrain: Swamp
delay: community
incident year: 2013
site location name: 36' Nkpoku-Bomu Pipeline at Rumuolukwu Eneka
estimated quantity spilled: 2058
estimated spill area: 0.00318
latitude: 4.898833
longitude: 7.051028
cause: sabotage
cause detail:
cleanup / recovery duratiom: 582
terrain: Land
delay:
incident year: 2013
site location name: Etelebou Wells 1 & 2 Wellheads at Ogboloma
estimated quantity spilled: 386
estimated spill area: 0.0041
latitude: ND
longitude: ND
cause: other
cause detail:
cleanup / recovery duratiom: 481
terrain: Land
delay: community
incident year: 2013
site location name: 20” Otumara - Escravos Pipeline at Ajudaibo
estimated quantity spilled: 6
estimated spill area:
latitude: 5.567417
longitude: 5.204611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 206
terrain: Swamp
delay:
incident year: 2012
site location name: Cawthorne Channel 3 Well 41S Flowline at Cawthorne Channel
estimated quantity spilled: 3
estimated spill area:
latitude: 4.556
longitude: 6.97575
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 94
terrain: Swamp
delay: community
incident year: 2014
site location name: 28'' Cawthorne Channel II - Nembe Creek Trunkline at Akiele-Ama / Kengama-kiri
estimated quantity spilled: 61
estimated spill area: 0.0053
latitude: 4.5560833
longitude: 7.0439444
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 219
terrain: Swamp
delay:
incident year: 2013
site location name: 6' Imo River Well 1 30L Flow line
estimated quantity spilled: 9
estimated spill area: 0.0008
latitude: 4.9866944
longitude: 7.1766111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 247
terrain: Land
delay:
incident year: 2013
site location name: 30' Nembe Creek Pipeline at Krakama
estimated quantity spilled: 9
estimated spill area: 0.000052
latitude: 4.566222
longitude: 6.902889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 324
terrain: Swamp
delay:
incident year: 2013
site location name: 28' Bomu-Bonny Pipeline at Oloma
estimated quantity spilled: 648
estimated spill area: 0.0179
latitude: 4.481889
longitude: 7.198889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 188
terrain: Swamp
delay:
incident year: 2013
site location name: 28' Bomu - Bonny Pipeline at Bodo West
estimated quantity spilled: 1330
estimated spill area: 0.0005
latitude: 4.592417
longitude: 7.257194
cause: sabotage
cause detail:
cleanup / recovery duratiom: 658
terrain: Swamp
delay: community
incident year: 2013
site location name: 24' Nkpoku - Bomu Pipeline at B-Dere
estimated quantity spilled: 19
estimated spill area: 0.0005
latitude: 4.692194
longitude: 7.276639
cause: sabotage
cause detail:
cleanup / recovery duratiom: 1
terrain: Land
delay:
incident year: 2011
site location name: Ekulama 1 Well 35 ROW at Ekulama
estimated quantity spilled: 5.9
estimated spill area:
latitude: 4.556167
longitude: 6.706889
cause: operational
cause detail:
cleanup / recovery duratiom: 120
terrain: Swamp
delay: community
incident year: 2013
site location name: 28” Trans Niger Pipeline near Patrick Waterside Manifold at Bodocity
estimated quantity spilled: 23
estimated spill area: 0.0004
latitude: 4.609694
longitude: 7.263333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 625
terrain: Land
delay:
incident year: 2013
site location name: 20' Otumara - Escravos Pipeline at Ajudaibo
estimated quantity spilled: 64
estimated spill area:
latitude: 5.5607333
longitude: 5.2026833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 189
terrain: Swamp
delay:
incident year: 2014
site location name: 4'' Ekulama Well 35S Flowline at Sanbath / Ekulama
estimated quantity spilled: 121
estimated spill area: 0.09
latitude: 4.557
longitude: 6.706
cause: operational
cause detail: (operational and maintenance error )
cleanup / recovery duratiom: 232
terrain: Swamp
delay:
incident year: 2013
site location name: 12' Imo River 2 - Ogale Pipeline at Umuololo Owaza
estimated quantity spilled: 235
estimated spill area: 0.00273
latitude: 4.9464444
longitude: 7.1848333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 120
terrain: Land
delay:
incident year: 2013
site location name: 24' Nkpoku - Bomu Trans Niger Pipeline at Biara / Kpite
estimated quantity spilled: 7
estimated spill area: 0.00045
latitude: 4.713306
longitude: 7.2805
cause: sabotage
cause detail:
cleanup / recovery duratiom: 179
terrain: Land
delay:
incident year: 2013
site location name: 4' Imo River Well 53L and 56L Flowlines at Etitioha-Ipu
estimated quantity spilled: 7
estimated spill area: 0.001
latitude: 4.969611
longitude: 7.177361
cause: sabotage
cause detail:
cleanup / recovery duratiom: 182
terrain: Land
delay:
incident year: 2013
site location name: 20'' Otumara - Escravos Pipeline at Ogidigben
estimated quantity spilled: 11
estimated spill area:
latitude: 5.5484722
longitude: 5.1996667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 172
terrain: Swamp
delay:
incident year: 2013
site location name: 20' Otumara - Escravos Pipeline at Ugboegungun
estimated quantity spilled: 76
estimated spill area:
latitude: 5.6278333
longitude: 5.1624722
cause: sabotage
cause detail:
cleanup / recovery duratiom: 149
terrain: Swamp
delay:
incident year: 2013
site location name: Cawthorne Channel Mani Fold at Adamakiri
estimated quantity spilled: 8
estimated spill area: 0.007
latitude: 4.557056
longitude: 7.061556
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 414
terrain: Swamp
delay:
incident year: 2011
site location name: Cawthorne Channel 2 Well 45T Flowline at Cawthorne Channel
estimated quantity spilled: 4
estimated spill area: 0.0024
latitude: 4.557278
longitude: 7.118833
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 100
terrain: Swamp
delay:
incident year: 2013
site location name: 14'Okordia - Rumuekpe Akinima Riser at Akinima
estimated quantity spilled: 96
estimated spill area:
latitude: 5.120194
longitude: 6.483056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 159
terrain: Land
delay:
incident year: 2013
site location name: 12' Imo River - Ogale Pipeline at Okohia
estimated quantity spilled: 18
estimated spill area: 0.0012
latitude: 4.930028
longitude: 7.184583
cause: sabotage
cause detail:
cleanup / recovery duratiom: 125
terrain: Land
delay:
incident year: 2013
site location name: 36' Rumuekpe - Nkpoku Trans Niger Pipeline @ Omuigwe-Aluu
estimated quantity spilled: 6
estimated spill area: 0.0045
latitude: 4.944778
longitude: 6.939667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 264
terrain: Land
delay:
incident year: 2013
site location name: 24' Nkpoku - Bomu Pipeline at Kpite
estimated quantity spilled: 10
estimated spill area: 0.0006
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom: 5
terrain: Land
delay:
incident year: 2013
site location name: 28' Bomu-Bonny Trans Niger Pipeline at Bodo City
estimated quantity spilled: 48
estimated spill area:
latitude: 4.629306
longitude: 7.276806
cause: sabotage
cause detail:
cleanup / recovery duratiom: 602
terrain: Swamp
delay: community
incident year: 2013
site location name: 28' Bomu-Bonny Pipeline at B-Dere
estimated quantity spilled: 12
estimated spill area: 0.00003
latitude: 4.688472
longitude: 7.257167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 136
terrain: Land
delay:
incident year: 2013
site location name: 6' Obigbo North - Ogale Pipeline at Ogale
estimated quantity spilled: 55
estimated spill area: 0.0004
latitude: 4.845806
longitude: 7.157333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 14
terrain: Land
delay:
incident year: 2013
site location name: 28' Nkpoku - Bomu Pipeline at Gio
estimated quantity spilled: 67
estimated spill area: 0.00054
latitude: 4.71
longitude: 7.234417
cause: sabotage
cause detail:
cleanup / recovery duratiom: 174
terrain: Land
delay:
incident year: 2013
site location name: 24' Nkpoku - Bomu Trans Niger Pipeline at Egbalor
estimated quantity spilled: 15
estimated spill area: 0.0004
latitude: 4.785056
longitude: 7.188083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 8
terrain: Land
delay:
incident year: 2013
site location name: 14' Okordia - Rumuekpe Pipeline at Akaramini
estimated quantity spilled: 169
estimated spill area: 0.0056
latitude: 5.119
longitude: 6.487167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 149
terrain: Land
delay:
incident year: 2013
site location name: 16' Nun River - Kolo Creek Pipeline at Igeibiri
estimated quantity spilled: 82
estimated spill area: 0.0018
latitude: 4.831639
longitude: 6.189167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 99
terrain: Swamp
delay:
incident year: 2013
site location name: 6' Obigbo North - Ogale Pipeline at Ogale
estimated quantity spilled: 315
estimated spill area: 0.0042
latitude: 4.838389
longitude: 7.156389
cause: sabotage
cause detail:
cleanup / recovery duratiom: 16
terrain: Land
delay:
incident year: 2013
site location name: 24' Bomu-Bonny Pipeline at Kpor / K-Dere
estimated quantity spilled: 399
estimated spill area: 0.0115
latitude: 4.655639
longitude: 7.276833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 360
terrain: Land
delay:
incident year: 2013
site location name: 20'' Otumara - Escravos Pipeline at Ajudaibo
estimated quantity spilled: 13
estimated spill area:
latitude: 5.576667
longitude: 5.206944
cause: sabotage
cause detail:
cleanup / recovery duratiom: 347
terrain: Swamp
delay:
incident year: 2013
site location name: 28' Bomu - Bonny Pipeline at Kpor; K-Dere
estimated quantity spilled: 332
estimated spill area:
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom: 347
terrain: Land
delay:
incident year: 2013
site location name: 14' Okordia - Rumuekpe Pipeline at Akaramini
estimated quantity spilled: 16
estimated spill area:
latitude: 5.1184444
longitude: 6.6683056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 174
terrain: Land
delay:
incident year: 2013
site location name: 8'' Obigbo North-Ogale Pipeline at Umusoanya
estimated quantity spilled: 6
estimated spill area: 0.00004
latitude: 4.8545
longitude: 7.1358333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 154
terrain: Land
delay:
incident year: 2013
site location name: 28' Nkpoku - Bomu TNP at Gio
estimated quantity spilled: 97
estimated spill area: 0.0072
latitude: 4.709972
longitude: 7.234333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 148
terrain: Land
delay:
incident year: 2013
site location name: 14' Okordia - Rumuekpe Pipeline at Ikarama
estimated quantity spilled: 101
estimated spill area: 0.0064
latitude: 5.153694
longitude: 6.452722
cause: sabotage
cause detail:
cleanup / recovery duratiom: 116
terrain: Land
delay:
incident year: 2013
site location name: 6'' Awoba -Manifold Pipeline at Awoba
estimated quantity spilled: 163
estimated spill area: 0.0186
latitude: 4.5502778
longitude: 6.8141667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 216
terrain: Land
delay:
incident year: 2012
site location name: Cawthorne Channel 2 Well 28T Flowline at Owame-ama / Okpoama
estimated quantity spilled: 25
estimated spill area: 0.0033
latitude: 4.560333
longitude: 7.001778
cause: operational
cause detail: (operational and maintenance error )
cleanup / recovery duratiom: 174
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2013
site location name: Cawthorne Channel 2 Well 45T flowline
estimated quantity spilled: 22
estimated spill area: 0.009
latitude: 4.5625833
longitude: 7.0007778
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 372
terrain: Swamp
delay:
incident year: 2011
site location name: Cawthorne Channel Well 45T flowline at Mbiama
estimated quantity spilled: 6.71
estimated spill area: 0.0015
latitude: 4.563611
longitude: 6.998889
cause: operational
cause detail: (operational and maintenance error )
cleanup / recovery duratiom: 51
terrain: Swamp
delay: community
incident year: 2013
site location name: Seibou Bulkline3 at Azargbene
estimated quantity spilled: 59
estimated spill area: 0.11146304
latitude: 4.88425
longitude: 5.8514167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 156
terrain: Swamp
delay:
incident year: 2013
site location name: Ubie Well4S Wellhead
estimated quantity spilled: 7
estimated spill area: 0
latitude: 5.0986111
longitude: 6.5461111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 144
terrain: Land
delay:
incident year: 2013
site location name: 20'' Opukushi - Brass Creek Trunkline at Tamogbene
estimated quantity spilled: 72
estimated spill area:
latitude: 4.943056
longitude: 5.682194
cause: sabotage
cause detail:
cleanup / recovery duratiom: 338
terrain: Swamp
delay:
incident year: 2013
site location name: 20''Otumara-Escravos Pipeline at Adjudaibo
estimated quantity spilled: 53
estimated spill area:
latitude: 5.5748611
longitude: 5.2073333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 320
terrain: Swamp
delay:
incident year: 2013
site location name: 24' Nkpoku - Bomu Pipeline at Kpite
estimated quantity spilled: 14
estimated spill area: 0.0009
latitude: 4.714
longitude: 7.2808056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 111
terrain: Land
delay:
incident year: 2013
site location name: 20''Otumara-Escravos Pipeline at Ugboegungun
estimated quantity spilled: 87
estimated spill area:
latitude: 5.6298333
longitude: 5.1611667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 318
terrain: Swamp
delay:
incident year: 2013
site location name: 24' Bomu – Bonny Pipeline at Mogho
estimated quantity spilled: 12
estimated spill area: 0.0001
latitude: 4.6413056
longitude: 7.2776667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 335
terrain: Land
delay:
incident year: 2011
site location name: Agbada 2 Flowstation Well 2T ROW
estimated quantity spilled: 2
estimated spill area: 0.0008
latitude: 4.591639
longitude: 7.031111
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 86
terrain: Land
delay:
incident year: 2014
site location name: 24' Nkpoku - Bomu Pipeline at B-Dere
estimated quantity spilled: 14
estimated spill area: 0.0002
latitude: 4.6755
longitude: 7.2766111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 2
terrain: Land
delay:
incident year: 2013
site location name: 16' Nun-River - Kolo Creek TNP @ Oporoma
estimated quantity spilled: 313
estimated spill area: 0.0088
latitude: 4.8063611
longitude: 6.1019444
cause: sabotage
cause detail:
cleanup / recovery duratiom: 134
terrain: Swamp
delay:
incident year: 2014
site location name: 28' Nkpoku - Bomu Pipeline at Kporghor
estimated quantity spilled: 11
estimated spill area: 0
latitude: 4.7189444
longitude: 7.2248333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 173
terrain: Land
delay:
incident year: 2014
site location name: 28' Nkpoku - Bomu Pipeline at Ekporo
estimated quantity spilled: 276
estimated spill area: 0.0005
latitude: 4.7234722
longitude: 7.2197778
cause: sabotage
cause detail:
cleanup / recovery duratiom: 318
terrain: Land
delay:
incident year: 2014
site location name: 28' Nkpoku - Bomu Pipeline at Ekporo
estimated quantity spilled: 234
estimated spill area: 0.0004
latitude: 4.7218056
longitude: 7.2216667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 316
terrain: Land
delay:
incident year: 2014
site location name: Otumara Well 34 L/S Flowline at Ugboegungun
estimated quantity spilled: 2
estimated spill area:
latitude: 5.7094444
longitude: 5.3197222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 55
terrain: Swamp
delay:
incident year: 2014
site location name: 20' Buguma - Alakiri GPHSL Pipeline at Abbiama
estimated quantity spilled: 59
estimated spill area: 0.0004
latitude: 4.7458333
longitude: 6.8676667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 104
terrain: Swamp
delay:
incident year: 2014
site location name: 8' Cawthorne Channel 2 Pipeline at New Calabar River Tigerkiri
estimated quantity spilled: 29
estimated spill area: 0.005
latitude: 4.5773056
longitude: 6.9983889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 169
terrain: Swamp
delay:
incident year: 2014
site location name: 30' Nembe Creek Pipeline at Elem-Kalabari
estimated quantity spilled: 236
estimated spill area: 0.0228
latitude: 4.5770833
longitude: 6.9745556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 154
terrain: Swamp
delay:
incident year: 2014
site location name: 20' Otumara - Escravos Pipeline at Ajudaibo
estimated quantity spilled: 5
estimated spill area:
latitude: 5.56
longitude: 5.2026389
cause: sabotage
cause detail:
cleanup / recovery duratiom: 59
terrain: Swamp
delay:
incident year: 2014
site location name: 20'' Otumara - Escravos Pipeline at Ugboegungun.
estimated quantity spilled: 10
estimated spill area:
latitude: 5.6143889
longitude: 5.1738056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 264
terrain: Swamp
delay:
incident year: 2014
site location name: Santa Barbara Well 4L/S Flowline at Nembe Bassambiri
estimated quantity spilled: 11
estimated spill area: 0.0098
latitude: 4.5401667
longitude: 6.5158889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 123
terrain: Swamp
delay:
incident year: 2014
site location name: 20'' Otumara - Escravos Pipeline at Ajudiabo.
estimated quantity spilled: 26
estimated spill area:
latitude: 5.57675
longitude: 5.2069444
cause: sabotage
cause detail:
cleanup / recovery duratiom: 52
terrain: Swamp
delay:
incident year: 2014
site location name: 28' Nkpoku - Bomu Pipeline at B-Dere
estimated quantity spilled: 88
estimated spill area:
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom: 160
terrain: Land
delay:
incident year: 2014
site location name: Okordia Manifold at Okordia-Ikarama
estimated quantity spilled: 302
estimated spill area: 0.0074
latitude: 5.1541944
longitude: 6.4522778
cause: sabotage
cause detail:
cleanup / recovery duratiom: 25
terrain: Land
delay:
incident year: 2014
site location name: 12' Imo River II - Ogale Pipeline at Umuedokwara Odagwa.
estimated quantity spilled: 8
estimated spill area: 0.0003
latitude: 4.9818056
longitude: 7.1693333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 95
terrain: Land
delay:
incident year: 2014
site location name: 18' Assa - Rumuekpe Pipeline at Elele Alimini / Ihuaba
estimated quantity spilled: 210
estimated spill area: 0.0057
latitude: 5.0535833
longitude: 6.7029167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 155
terrain: Land
delay:
incident year: 2014
site location name: Diebu Creek Flow Station at Peremabiri
estimated quantity spilled: 0.3
estimated spill area: 0.000014
latitude: 4.6599167
longitude: 6.0787778
cause: operational
cause detail: (operational and maintenance error )
cleanup / recovery duratiom: 286
terrain: Water
delay: other (terrain, floods, ...)
incident year: 2014
site location name: 24' Nkpoku - Bomu Pipeline at Biara
estimated quantity spilled: 16
estimated spill area: 0.0003
latitude: 4.6951667
longitude: 7.2786667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 171
terrain: Land
delay:
incident year: 2014
site location name: 24' Nkpoku - Bomu Pipeline at Biara
estimated quantity spilled: 10
estimated spill area: 0.0004
latitude: 4.6951111
longitude: 7.2781389
cause: sabotage
cause detail:
cleanup / recovery duratiom: 173
terrain: Land
delay:
incident year: 2014
site location name: Imo River 2 well 28L Well Head Umuedokwara Odagwa
estimated quantity spilled: 30
estimated spill area: 0.0018
latitude: 4.9924167
longitude: 7.1636111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 161
terrain: Land
delay:
incident year: 2012
site location name: 28' Bomu - Bonny Trunklines at K-Dere
estimated quantity spilled: 10.1
estimated spill area: 0.0009
latitude: 4.660417
longitude: 7.276833
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 937
terrain: Land
delay: community
incident year: 2014
site location name: 24' Bomu - Bonny Pipeline at Bodo West
estimated quantity spilled: 2
estimated spill area: 0
latitude: 4.6065556
longitude: 7.2613056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 269
terrain: Swamp
delay: community
incident year: 2014
site location name: 20' Otumara - Escravos Pipeline at Adjudiabo
estimated quantity spilled: 29
estimated spill area:
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom: 36
terrain: Swamp
delay:
incident year: 2014
site location name: 28' Nkpoku - Bomu Trans Niger Pipeline at B-Dere
estimated quantity spilled: 646
estimated spill area:
latitude: 4.6943611
longitude: 7.2529167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 261
terrain: Land
delay:
incident year: 2014
site location name: 12' Imo River 2 - Ogale Pipeline at Kom-Kom
estimated quantity spilled: 32
estimated spill area: 0.001
latitude: 4.85425
longitude: 7.1611389
cause: sabotage
cause detail:
cleanup / recovery duratiom: 255
terrain: Land
delay:
incident year: 2014
site location name: 28' Nkpoku - Bomu Trans Niger Pipeline at Kpoghor
estimated quantity spilled: 14
estimated spill area: 0.0001
latitude: 4.7185
longitude: 7.2252222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 109
terrain: Land
delay:
incident year: 2014
site location name: 10' Diebu Creek - Nun River DL at Peremabiri
estimated quantity spilled: 275
estimated spill area: 0.3897
latitude: 4.6612222
longitude: 6.0784722
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 352
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2014
site location name: 8' Obigbo North - Komkom Pipeline at Oyigbo
estimated quantity spilled: 2
estimated spill area: 0
latitude: 4.8694167
longitude: 7.1354167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 97
terrain: Land
delay:
incident year: 2014
site location name: 10' Diebu Creek Manifold - Nun River Manifold Pipeline at Premabiri
estimated quantity spilled: 106
estimated spill area: 0.0155
latitude: 4.6613611
longitude: 6.0786111
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 339
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2014
site location name: 4' Obelle - Ibaa Pipeline at Omueze - Ibaa
estimated quantity spilled: 20
estimated spill area:
latitude: 4.9708889
longitude: 6.8042222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 131
terrain: Land
delay:
incident year: 2014
site location name: 20'' Rumuekpe-Nkpoku Pipeline at Omusunu-Ibaa.
estimated quantity spilled: 17
estimated spill area:
latitude: 4.9535556
longitude: 6.8373611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 257
terrain: Land
delay:
incident year: 2014
site location name: Old 24'' Nembe Creek Pipeline at Twoni
estimated quantity spilled: 2
estimated spill area: 0.0015
latitude: 4.4811944
longitude: 6.5813333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 229
terrain: Swamp
delay:
incident year: 2014
site location name: KoloCreek Well 3T Flowline at Otuasega
estimated quantity spilled: 18
estimated spill area:
latitude: 4.8934167
longitude: 6.3703611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 240
terrain: Swamp
delay:
incident year: 2012
site location name: Bomu Manifold at K-dere
estimated quantity spilled: 5.8
estimated spill area: 0.002
latitude: 4.662889
longitude: 7.277278
cause: operational
cause detail: (operational and maintenance error )
cleanup / recovery duratiom: 197
terrain: Land
delay: community
incident year: 2014
site location name: 36' Nkpoku - Bomu Pipeline at Atali
estimated quantity spilled: 54
estimated spill area: 0.0014
latitude: 4.8821944
longitude: 7.0704444
cause: sabotage
cause detail:
cleanup / recovery duratiom: 96
terrain: Land
delay:
incident year: 2013
site location name: 14' Okordia - Rumuekpe Pipeline at Imogu
estimated quantity spilled: 210
estimated spill area: 0.0143
latitude: 4.9943611
longitude: 6.6683056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 226
terrain: Swamp
delay:
incident year: 2013
site location name: 24' Nkpoku - Bomu Pipeline at Nonwa / Bunu
estimated quantity spilled: 2249
estimated spill area: 0.0981
latitude: 4.744722
longitude: 7.244
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 223
terrain: Land
delay:
incident year: 2012
site location name: Ebubu Ejema Well 5/9 Flow Line at Ejama
estimated quantity spilled: 0.001
estimated spill area: 0
latitude: 4.778444
longitude: 7.152194
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2013
site location name: 6' Ogale -Ebubu Pipeline at Obolo
estimated quantity spilled: 5
estimated spill area:
latitude: 4.783861
longitude: 7.146778
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 2
terrain: Land
delay:
incident year: 2014
site location name: 4'' NunRiver Well 10T Flowline at Oporoma
estimated quantity spilled: 5
estimated spill area: 0.0004
latitude: 4.7967222
longitude: 6.0995556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 222
terrain: Land
delay:
incident year: 2014
site location name: 28' Nkpoku - Bomu Pipeline at B-Dere
estimated quantity spilled: 221
estimated spill area:
latitude: 4.6943611
longitude: 7.2528889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 216
terrain: Land
delay:
incident year: 2014
site location name: 28' Nkpoku - Bomu Trans Niger Pipeline at B-Dere.
estimated quantity spilled: 29
estimated spill area: 0
latitude: 4.6903056
longitude: 7.2550556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 3
terrain: Land
delay:
incident year: 2013
site location name: 6'' Obigbo North - Ebubu Pipeline at Obolo
estimated quantity spilled: 9
estimated spill area: 0.0002
latitude: 4.783889
longitude: 7.146778
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 306
terrain: Land
delay:
incident year: 2014
site location name: 30'' Nembe Creek Pipeline at Bille
estimated quantity spilled: 5605
estimated spill area: 0.0914
latitude: 4.5678056
longitude: 6.8721111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 221
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2014
site location name: 28' Nkpoku - Bomu TNP at Ekporo
estimated quantity spilled: 157
estimated spill area: 0.0001
latitude: 4.7220278
longitude: 7.2213889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 164
terrain: Land
delay:
incident year: 2014
site location name: Yokri Well head-79 at Sokebolou
estimated quantity spilled: 607
estimated spill area:
latitude: 5.42975
longitude: 5.2707222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 178
terrain: Swamp
delay:
incident year: 2014
site location name: 28' Nkpoku - Bomu TNP at Ekporo
estimated quantity spilled: 657
estimated spill area:
latitude: 4.7206667
longitude: 7.2228611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 194
terrain: Land
delay:
incident year: 2014
site location name: 10' Santa Barbara Pipeline at Nembe Bassambiri
estimated quantity spilled: 13
estimated spill area: 0.0023
latitude: 4.5044167
longitude: 6.49
cause: sabotage
cause detail:
cleanup / recovery duratiom: 158
terrain: Swamp
delay:
incident year: 2013
site location name: 6'' Obigbo North - Ebubu pipeline at Obolo
estimated quantity spilled: 90
estimated spill area: 0.0039
latitude: 4.7840556
longitude: 7.1474444
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 263
terrain: Land
delay:
incident year: 2014
site location name: Imo River Well1T Flowline at Igiriukwu (Owaza)
estimated quantity spilled: 3
estimated spill area:
latitude: 4.9808611
longitude: 7.1940833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 139
terrain: Land
delay:
incident year: 2014
site location name: 10' Diebu Creek Pipeline at Oporoma
estimated quantity spilled: 251
estimated spill area:
latitude: 4.7956389
longitude: 6.1075278
cause: sabotage
cause detail:
cleanup / recovery duratiom: 162
terrain: Land
delay:
incident year: 2014
site location name: 28' Bomu - Bonny Pipeline at Owokiri
estimated quantity spilled: 166
estimated spill area: 0.003
latitude: 4.5510833
longitude: 7.2486111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 160
terrain: Land
delay:
incident year: 2014
site location name: 24' CAWC Loop Line at Adamakiri
estimated quantity spilled: 43
estimated spill area: 0.02
latitude: 4.541
longitude: 7.0716111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 164
terrain: Swamp
delay:
incident year: 2014
site location name: 16' Nun River - Kolo Creek Pipeline at Angiama
estimated quantity spilled: 296
estimated spill area: 0.0079
latitude: 4.8216944
longitude: 6.1397778
cause: sabotage
cause detail:
cleanup / recovery duratiom: 269
terrain: Land
delay:
incident year: 2014
site location name: 12”Adibawa-Okordia (Okordia Manifold)
estimated quantity spilled: 629
estimated spill area:
latitude: 5.1544167
longitude: 6.4521111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 172
terrain: Land
delay:
incident year: 2011
site location name: 24'' Trans Ramos Pipeline Right of Way at Odimodi
estimated quantity spilled: 0
estimated spill area:
latitude: 5.217861
longitude: 5.388444
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2011
site location name: Nun River Well 15S Flowline ROW at Onyoma
estimated quantity spilled: 2.5
estimated spill area: 0.0006
latitude: 4.786028
longitude: 6.080639
cause: operational
cause detail: (operational and maintenance error )
cleanup / recovery duratiom: 65
terrain: Swamp
delay:
incident year: 2011
site location name: Bonny Flow Station at Oloma
estimated quantity spilled: 3
estimated spill area:
latitude: 4.786056
longitude: 6.080639
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 30
terrain: Water
delay: other (terrain, floods, ...)
incident year: 2012
site location name: 10” Diebu Creek delivery line at Oporoma
estimated quantity spilled: 176
estimated spill area: 0.0151
latitude: 4.791333
longitude: 6.107083
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 79
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2012
site location name: Bukuma Well 8 at Bukuma
estimated quantity spilled: 0.03
estimated spill area:
latitude: 4.736278
longitude: 6.883278
cause: sabotage
cause detail:
cleanup / recovery duratiom: 304
terrain: Water
delay: community
incident year: 2012
site location name: 24' Nkpoku - Bomu Pipeline at Ogale
estimated quantity spilled: 0.92
estimated spill area: 0.00136
latitude: 4.822056
longitude: 7.140639
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 900
terrain: Land
delay: community
incident year: 2012
site location name: 36' Nkpoku-Ogale Pipeline at Akpajo
estimated quantity spilled: 136
estimated spill area: 0.0004
latitude: 4.842639
longitude: 7.116583
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 5
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2011
site location name: 24' Alakiri-Bonny GPHSL at Creek 6 and Kalibiama
estimated quantity spilled: 0.1
estimated spill area: 0.0003
latitude: 4.50025
longitude: 7.120528
cause: sabotage
cause detail:
cleanup / recovery duratiom: 66
terrain: Swamp
delay:
incident year: 2011
site location name: Oguta Well 17L at Oguta
estimated quantity spilled: 0.1
estimated spill area: 0.000004
latitude: 5.641583
longitude: 6.820667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 24
terrain: Land
delay:
incident year: 2012
site location name: 28'' Trans Forcados Pipeline at Ugbokodo
estimated quantity spilled: 0.1
estimated spill area:
latitude: 5.57475
longitude: 5.648667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 31
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2012
site location name: Obigbo Well 28 L/S Flowline at Umuebulu
estimated quantity spilled: 0.1
estimated spill area: 0.000006
latitude: 4.910306
longitude: 7.090944
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: 24' Nkpoku - Bomu Pipeline at Akpajo
estimated quantity spilled: 862.6
estimated spill area: 0.0173
latitude: 4.843194
longitude: 7.115889
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 132
terrain: Land
delay:
incident year: 2011
site location name: 8' Obigbo - New Elelenwo Delivery line at Akpajo
estimated quantity spilled: 28
estimated spill area: 0.001254
latitude: 4.849806
longitude: 7.113028
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 59
terrain: Land
delay: community
incident year: 2013
site location name: 8' Umuechem - Nkpoku Pipeline at Omusele (Omunwei)
estimated quantity spilled: 0.1
estimated spill area: 0.0002
latitude: 4.971167
longitude: 7.025667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 407
terrain: Land
delay:
incident year: 2013
site location name: 4' Adibawa North East (ADNE) Well 2L Flowline at Biseni
estimated quantity spilled: 0.1
estimated spill area: 0.0013
latitude: 5.257194
longitude: 6.5225
cause: sabotage
cause detail:
cleanup / recovery duratiom: 237
terrain: Land
delay:
incident year: 2013
site location name: Elelenwo Well 9LS wellhead at Elelenwo
estimated quantity spilled: 7
estimated spill area: 0.0004
latitude: 4.8563889
longitude: 7.0987222
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 374
terrain: Land
delay:
incident year: 2013
site location name: 20''Otumara-Escravos Pipeline at Ugboegungun
estimated quantity spilled: 0.1
estimated spill area:
latitude: 5.6136667
longitude: 5.1746389
cause: sabotage
cause detail:
cleanup / recovery duratiom: 327
terrain: Swamp
delay:
incident year: 2014
site location name: 20'' Otumara - Escravos Pipeline at Ugboegungun
estimated quantity spilled: 0.1
estimated spill area:
latitude: 5.6148667
longitude: 5.17345
cause: sabotage
cause detail:
cleanup / recovery duratiom: 43
terrain: Swamp
delay:
incident year: 2014
site location name: 20” Opukushi – Brass Creek Pipeline at Tamogbene
estimated quantity spilled: 0.1
estimated spill area:
latitude: 4.9410278
longitude: 5.6907222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 168
terrain: Swamp
delay:
incident year: 2014
site location name: Belema Well 7L Wellhead at Belema
estimated quantity spilled: 0.1
estimated spill area: 0.0002
latitude: 4.3933333
longitude: 6.6610833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 158
terrain: Swamp
delay:
incident year: 2011
site location name: 28' Bomu-Bonny Pipeline at Mogho
estimated quantity spilled: 2
estimated spill area: 0.0002
latitude: 4.639778
longitude: 7.277889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 34
terrain: Land
delay:
incident year: 2011
site location name: Kolo Creek 3T Flowline at Kolo Creek
estimated quantity spilled: 0.16
estimated spill area: 0.003
latitude: 4.894944
longitude: 6.361778
cause: sabotage
cause detail:
cleanup / recovery duratiom: 19
terrain: Land
delay:
incident year: 2012
site location name: 24' Nkpoku - Bomu Trunkline at Egballor
estimated quantity spilled: 0.2
estimated spill area:
latitude: 4.790583
longitude: 7.178528
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2014
site location name: 28' Nkpoku-Bomu Pipeline at Akpajo
estimated quantity spilled: 0.2
estimated spill area: 0.000001
latitude: 4.8313333
longitude: 7.0894167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 211
terrain: Land
delay:
incident year: 2013
site location name: Kanbo Well 7S Flowline at Egbemodangarabiri / Agbidiama
estimated quantity spilled: 4
estimated spill area:
latitude: 4.885417
longitude: 5.629
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 228
terrain: Swamp
delay:
incident year: 2011
site location name: Imo River1 Well 59T Flowline at ImoRiver 1
estimated quantity spilled: 0.22
estimated spill area: 0
latitude: 4.99075
longitude: 7.198444
cause: sabotage
cause detail:
cleanup / recovery duratiom: 3
terrain: Land
delay:
incident year: 2011
site location name: 18” Assa–Rumuekpe Trunkline at Awara
estimated quantity spilled: 0.72
estimated spill area: 0.0025
latitude: 5.348611
longitude: 6.795222
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: Cawthorne Channel 2 Well 32S Flowline at Cawthorne Channel
estimated quantity spilled: 3
estimated spill area:
latitude: 4.549944
longitude: 7.012083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 69
terrain: Swamp
delay:
incident year: 2011
site location name: Imo River Well 28L Flowline at Umuedeokware.
estimated quantity spilled: 1.05
estimated spill area:
latitude: 4.991792
longitude: 7.163333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 125
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2011
site location name: Ubie Well 4S Flowline at Ubie
estimated quantity spilled: 1
estimated spill area:
latitude: 5.103778
longitude: 6.555083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 58
terrain: Land
delay:
incident year: 2011
site location name: Nun River Well 15 Flowline at Nun River
estimated quantity spilled: 2.95
estimated spill area:
latitude: 4.790333
longitude: 6.083583
cause: sabotage
cause detail:
cleanup / recovery duratiom: 68
terrain: Swamp / Land
delay:
incident year: 2011
site location name: Obigbo Well 20T Flowline at Umuebule
estimated quantity spilled: 1.3
estimated spill area:
latitude: 4.886833
longitude: 7.129333
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 25
terrain: Land
delay:
incident year: 2011
site location name: 10'' Ogini-Eriemu delivery line at Ogini
estimated quantity spilled: 0.14
estimated spill area:
latitude: 5.569944
longitude: 6.750972
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2012
site location name: Obigbo Flowline Gathering Manifold at Umuwalia
estimated quantity spilled: 1
estimated spill area: 0.00002
latitude: 4.89225
longitude: 7.121361
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 95
terrain: Land
delay: community
incident year: 2012
site location name: Obigbo Well 3L Flowline at Umuebulu
estimated quantity spilled: 0.11
estimated spill area: 0.00002
latitude: 4.892583
longitude: 7.121472
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: Imo River Well 59T Flowline at Igiriukwu
estimated quantity spilled: 4.62
estimated spill area: 0.0077
latitude: 4.991556
longitude: 7.195
cause: sabotage
cause detail:
cleanup / recovery duratiom: 86
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2011
site location name: 4' Obele pipeline at Ibaa
estimated quantity spilled: 2.5
estimated spill area: 0.000415
latitude: 4.966722
longitude: 6.803778
cause: sabotage
cause detail:
cleanup / recovery duratiom: 8
terrain: Land
delay: community
incident year: 2011
site location name: Kanbo Well 5L Right of Way
estimated quantity spilled: 17.93
estimated spill area:
latitude: 4.904028
longitude: 5.651472
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 175
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2013
site location name: Kanbo Well 5L Flowline Right of Way
estimated quantity spilled: 4
estimated spill area:
latitude: 4.908778
longitude: 5.663667
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 163
terrain: Swamp
delay:
incident year: 2012
site location name: Opukushi Well 24T Flowline ROW
estimated quantity spilled: 106.3
estimated spill area: 0.007167
latitude: 4.908833
longitude: 5.804139
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 111
terrain: Swamp
delay:
incident year: 2011
site location name: Imo River Well 37L Flowline at Igiriukwu Owaza
estimated quantity spilled: 0.7
estimated spill area: 0.0012
latitude: 4.987306
longitude: 7.204056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 43
terrain: Land
delay:
incident year: 2013
site location name: Opukushi Well 24T Flowline
estimated quantity spilled: 11
estimated spill area:
latitude: 4.919889
longitude: 5.743556
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 115
terrain: Swamp
delay:
incident year: 2011
site location name: Akaso Well 10L Flowline at Cawthorne Channel
estimated quantity spilled: 0.4
estimated spill area: 0.0001
latitude: 4.548611
longitude: 7.047056
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2013
site location name: 4' Abada 69 S Flowline at Umuokwa
estimated quantity spilled: 5
estimated spill area: 0.0001
latitude: 4.9335278
longitude: 7.0531389
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 366
terrain: Land
delay:
incident year: 2011
site location name: 20' Buguma-Alakiri trunkline at Abiama
estimated quantity spilled: 0.84
estimated spill area: 0.000046
latitude: 4.746722
longitude: 6.874528
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2013
site location name: Agbada II Well 66L Flowline at Umuokwa
estimated quantity spilled: 8
estimated spill area: 0.000075
latitude: 4.936583
longitude: 7.054167
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 447
terrain: Land
delay:
incident year: 2011
site location name: 16' Egbema-Assa Pipeline at Assa
estimated quantity spilled: 0.75
estimated spill area: 0.000024
latitude: 5.380667
longitude: 6.796028
cause: sabotage
cause detail:
cleanup / recovery duratiom: 2
terrain: Land
delay:
incident year: 2012
site location name: 8' Etelebou - Kolo-Creek Pipeline at Biogbolo.
estimated quantity spilled: 5.7
estimated spill area: 0.0003
latitude: 4.941222
longitude: 6.357361
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 48
terrain: Swamp
delay: community
incident year: 2011
site location name: 8' Obigbo North Pipeline at Obigbo
estimated quantity spilled: 0.8
estimated spill area: 0.00003
latitude: 4.851806
longitude: 7.124194
cause: sabotage
cause detail:
cleanup / recovery duratiom: 36
terrain: Land
delay:
incident year: 2011
site location name: 20' Kolocreek-Rumuekpe Pipeline at Ogbogolo
estimated quantity spilled: 36
estimated spill area: 0.00203
latitude: 4.946783
longitude: 6.555292
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 57
terrain: Land
delay:
incident year: 2011
site location name: Adibawa Well 10 S Flowline at Edagberi
estimated quantity spilled: 1
estimated spill area: 0.00015
latitude: 5.198111
longitude: 6.503139
cause: sabotage
cause detail:
cleanup / recovery duratiom: 66
terrain: Land
delay:
incident year: 2011
site location name: Akaso Well 10S Flowline at Mbiama
estimated quantity spilled: 0.81
estimated spill area: 0.0003
latitude: 4.529222
longitude: 7.033028
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2011
site location name: 6' Obigbo North - Ogale Pipeline at Ogale
estimated quantity spilled: 0.95
estimated spill area: 0.000001
latitude: 4.8345
longitude: 7.155917
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: 6' Obigbo North Pipeline at Ogale
estimated quantity spilled: 0.41
estimated spill area: 0.000001
latitude: 4.834417
longitude: 7.155917
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: 6' Obigbo North Pipeline at Ogale
estimated quantity spilled: 0.87
estimated spill area: 0.000047
latitude: 4.834556
longitude: 7.156
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: 6' Obigbo - Ogale Condensate line at Komkom
estimated quantity spilled: 0.22
estimated spill area: 0
latitude: 4.845722
longitude: 7.157306
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: 6' Obigbo - North Pipeline at Ogale
estimated quantity spilled: 0.6
estimated spill area: 0.0001
latitude: 4.831222
longitude: 7.155583
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: 6' Obigbo North - Ogale Pipeline at Komkom
estimated quantity spilled: 0.8
estimated spill area: 0.0002
latitude: 4.842694
longitude: 7.157
cause: sabotage
cause detail:
cleanup / recovery duratiom: 41
terrain: Land
delay:
incident year: 2011
site location name: 20' Kolocreek-Rumuekpe Pipeline at Ogbogolo
estimated quantity spilled: 82.6
estimated spill area:
latitude: 4.946806
longitude: 6.555278
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 77
terrain: Land
delay:
incident year: 2011
site location name: Rumuekpe Flow Station at Rumuekpe
estimated quantity spilled: 1
estimated spill area: 0.0001
latitude: 4.980194
longitude: 6.687389
cause: operational
cause detail: (operational and maintenance error )
cleanup / recovery duratiom: 2
terrain: Land
delay:
incident year: 2011
site location name: Akaso Well 13L Flowline at Akaso
estimated quantity spilled: 1
estimated spill area:
latitude: 4.54975
longitude: 7.046861
cause: sabotage
cause detail:
cleanup / recovery duratiom: 34
terrain: Swamp
delay:
incident year: 2011
site location name: Bonny Well 12S Flowline
estimated quantity spilled: 1
estimated spill area:
latitude: 4.466306
longitude: 7.186333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 63
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2011
site location name: Imo River Well 56 L Flowline at Isietitioha
estimated quantity spilled: 1
estimated spill area: 0.0002
latitude: 4.972972
longitude: 7.181306
cause: sabotage
cause detail:
cleanup / recovery duratiom: 46
terrain: Land
delay:
incident year: 2011
site location name: 24' Nkpoku - Bomu Pipeline at Biara
estimated quantity spilled: 0.23
estimated spill area: 0.000014
latitude: 4.703556
longitude: 7.279528
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: 16' Egbema-Assa Pipeline at Assa
estimated quantity spilled: 0.8
estimated spill area: 0.0008
latitude: 5.380694
longitude: 6.796083
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: 8” Nkali – Imo River Pipeline Odagwa
estimated quantity spilled: 2.5
estimated spill area: 0.000193
latitude: 4.98725
longitude: 7.160917
cause: sabotage
cause detail:
cleanup / recovery duratiom: 67
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2011
site location name: 12' Imo River 2 - Ebubu Pipeline at Odagwa
estimated quantity spilled: 0.26
estimated spill area: 0
latitude: 4.980861
longitude: 7.170278
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2012
site location name: Imo River 3 Well 5 W/h Location at Igrukwu
estimated quantity spilled: 21.5
estimated spill area:
latitude: 4.983806
longitude: 7.178583
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 294
terrain: Land
delay:
incident year: 2011
site location name: 12' Imo River 1 - Ogale Pipeline at Owaza
estimated quantity spilled: 1.94
estimated spill area: 0.00003
latitude: 4.926528
longitude: 7.184472
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: Saver Pit Oveflow (Obelle FS)
estimated quantity spilled: 3.26
estimated spill area: 0.0001
latitude: 5.007639
longitude: 6.809583
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 86
terrain: Land
delay: community
incident year: 2011
site location name: 12' Imo River1 - Ogale Pipeline @ Komkom
estimated quantity spilled: 2.2
estimated spill area: 0.000049
latitude: 4.868333
longitude: 7.212861
cause: sabotage
cause detail:
cleanup / recovery duratiom: 32
terrain: Swamp
delay:
incident year: 2013
site location name: Benisede Well 17S Flowline at Ojobo
estimated quantity spilled: 0.1
estimated spill area:
latitude: 5.0079167
longitude: 5.6916111
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 195
terrain: Swamp
delay:
incident year: 2011
site location name: Ubefan Well 2
estimated quantity spilled: 85
estimated spill area: 13
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2011
site location name: Akaso Well 3S FL at Cawthorne Channel
estimated quantity spilled: 1.5
estimated spill area: 0.0001
latitude: 4.546528
longitude: 7.046694
cause: sabotage
cause detail:
cleanup / recovery duratiom: 74
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2011
site location name: Umuechem Well 22T Flowline located at Umuechem
estimated quantity spilled: 5.1
estimated spill area: 0.000142
latitude: 5.011806
longitude: 7.017333
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 8
terrain: Land
delay:
incident year: 2011
site location name: 18' Assa-Rumuekpe Pipeline at Awara
estimated quantity spilled: 1.4
estimated spill area: 0.0004
latitude: 5.287889
longitude: 6.781222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 57
terrain: Land
delay:
incident year: 2011
site location name: 24' Nembe Creek Trunkline (old NCTL) Pipeline at Tora-Twenikiri
estimated quantity spilled: 1.08
estimated spill area: 0.0146
latitude: 4.482389
longitude: 6.535167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 20
terrain: Swamp
delay:
incident year: 2012
site location name: 16' Egbema - Assa Trunk line at Obille
estimated quantity spilled: 1.3
estimated spill area: 0.0001
latitude: 5.395667
longitude: 6.789667
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: 18' Soku-Ekulama Pipeline at Kirikakiri
estimated quantity spilled: 1.3
estimated spill area: 0.004495
latitude: 4.570306
longitude: 6.672278
cause: sabotage
cause detail:
cleanup / recovery duratiom: 11
terrain: Swamp
delay:
incident year: 2012
site location name: 28' Nkpoku - Bomu Pipelline at B-Dere
estimated quantity spilled: 0.22
estimated spill area: 0.000017
latitude: 4.697611
longitude: 7.249083
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2012
site location name: 6' Obigbo North - Ogale delivery line at Ogale
estimated quantity spilled: 1.2
estimated spill area: 0.0004
latitude: 4.828917
longitude: 7.156083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 33
terrain: Land
delay:
incident year: 2012
site location name: Diebu Creek Well 15T Flow Line at Diebu Creek
estimated quantity spilled: 2
estimated spill area:
latitude: 4.655167
longitude: 6.071806
cause: sabotage
cause detail:
cleanup / recovery duratiom: 36
terrain: Swamp
delay:
incident year: 2011
site location name: Etelebou Well 8T Flowline at Ogboloma
estimated quantity spilled: 4.05
estimated spill area:
latitude: 5.022111
longitude: 6.34725
cause: operational
cause detail:
cleanup / recovery duratiom: 20
terrain: Land
delay:
incident year: 2013
site location name: 14' Okordia - Rumuekpe Pipeline at Ikarama
estimated quantity spilled: 6
estimated spill area: 0.000271
latitude: 5.136333
longitude: 6.467833
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 370
terrain: Land
delay:
incident year: 2013
site location name: 14' Okordia-Rumuekpe Pipeline at Ikarama
estimated quantity spilled: 3
estimated spill area: 0.000258
latitude: 5.146889
longitude: 6.458611
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 449
terrain: Land
delay:
incident year: 2011
site location name: 12' Adibawa - Okordia Pipeline at Ikarama
estimated quantity spilled: 62.2
estimated spill area: 0.0028
latitude: 5.154056
longitude: 6.455889
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 104
terrain: Land
delay:
incident year: 2012
site location name: 24' Bomu - Bonny Pipeline at Mogho
estimated quantity spilled: 1.3
estimated spill area: 0.000043
latitude: 4.647167
longitude: 7.277361
cause: sabotage
cause detail:
cleanup / recovery duratiom: 2
terrain: Land
delay:
incident year: 2011
site location name: Akaso Well 3L Flowline at Akaso
estimated quantity spilled: 1.9
estimated spill area: 0.0001
latitude: 4.542611
longitude: 7.045306
cause: sabotage
cause detail:
cleanup / recovery duratiom: 4
terrain: Swamp
delay:
incident year: 2012
site location name: Ubie Well 9S Flowline at Ubie
estimated quantity spilled: 1
estimated spill area: 0.000042
latitude: 5.112472
longitude: 6.541167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 58
terrain: Land
delay:
incident year: 2012
site location name: 4' Nkali Well 10L Flowline at Odagwa 2
estimated quantity spilled: 3.9
estimated spill area: 0.0047
latitude: 4.978306
longitude: 7.10025
cause: sabotage
cause detail:
cleanup / recovery duratiom: 214
terrain: Land
delay:
incident year: 2012
site location name: Ahia Well 3S Flowline at Ahia at Umudioga
estimated quantity spilled: 0.3
estimated spill area: 0.000009
latitude: 5.195556
longitude: 6.759472
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2012
site location name: 12' Adibawa - Okordia delivery line at Edegbari
estimated quantity spilled: 0.3
estimated spill area: 0.0003
latitude: 5.169417
longitude: 6.475444
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 30
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2012
site location name: Imo River 1 Well 26L Flowline at Owaza
estimated quantity spilled: 1.3
estimated spill area: 0.00008
latitude: 4.979833
longitude: 7.178639
cause: sabotage
cause detail:
cleanup / recovery duratiom: 14
terrain: Land
delay:
incident year: 2012
site location name: ImoR-2 Well 28L FLV (Flow line valve)
estimated quantity spilled: 0.053
estimated spill area:
latitude: 5.404111
longitude: 6.786083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 68
terrain: Land
delay:
incident year: 2013
site location name: Forcados Crude Loading Platform
estimated quantity spilled: 1
estimated spill area:
latitude: 5.1706944
longitude: 5.1640833
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom:
terrain: Water
delay:
incident year: 2012
site location name: Obigbo Well 28L/S Flowline at Obigbo
estimated quantity spilled: 0.4
estimated spill area: 0.00005
latitude: 4.920278
longitude: 7.076778
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2013
site location name: Adibawa North East Flowline at Biseni
estimated quantity spilled: 8
estimated spill area: 0.0015
latitude: 5.21325
longitude: 6.517583
cause: operational
cause detail: (sabotage)
cleanup / recovery duratiom: 528
terrain: Land
delay: cause of spill dispute
incident year: 2012
site location name: Imo River 1 Well 59T Flowline at Igiriukwu
estimated quantity spilled: 1.4
estimated spill area: 0.000045
latitude: 4.987167
longitude: 7.204194
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2012
site location name: Imo River 1 Well 59T Flowline RoW at Owaza
estimated quantity spilled: 4.3
estimated spill area: 0.0001
latitude: 4.987472
longitude: 7.203833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 89
terrain: Land
delay:
incident year: 2013
site location name: Biseni Remote Manifold
estimated quantity spilled: 49
estimated spill area: 0.00022
latitude: 5.257111
longitude: 6.52275
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 474
terrain: Land
delay: community
incident year: 2012
site location name: 18' Assa - Rumuekpe Trunkline at Awara
estimated quantity spilled: 48
estimated spill area: 0.0015
latitude: 5.287917
longitude: 6.781167
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 10
terrain: Land
delay:
incident year: 2012
site location name: Umuechem Well 12L Flowline at Umuechem
estimated quantity spilled: 1
estimated spill area: 0.0001
latitude: 5.109278
longitude: 7.016472
cause: sabotage
cause detail:
cleanup / recovery duratiom: 231
terrain: Swamp
delay:
incident year: 2012
site location name: 24' Bomu - Bonny Pipeline at Bodo West
estimated quantity spilled:
estimated spill area:
latitude: 4.577278
longitude: 7.255417
cause: yet to be determined
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2012
site location name: 4' Obele - Ibaa Pipeline at Ibaa.
estimated quantity spilled: 6.1
estimated spill area: 0.002
latitude: 4.974389
longitude: 6.804722
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: 6' Imo River Well 59T Flowline at Igiriukwa
estimated quantity spilled: 2.7
estimated spill area: 0.000227
latitude: 4.992
longitude: 7.195639
cause: sabotage
cause detail:
cleanup / recovery duratiom: 49
terrain: Land
delay:
incident year: 2012
site location name: 8” Umuechem – Nkpoku Delivery Line at Umuwenye
estimated quantity spilled: 3
estimated spill area: 0.0006
latitude: 4.980361
longitude: 7.024972
cause: sabotage
cause detail:
cleanup / recovery duratiom: 63
terrain: Land
delay:
incident year: 2012
site location name: 18' Assa - Rumuekpe Trunkline at Awara
estimated quantity spilled: 2
estimated spill area: 0.0001
latitude: 5.349528
longitude: 6.795417
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 8
terrain: Land
delay:
incident year: 2012
site location name: 12' Imo River II - Ogale Pipeline at Owaza.
estimated quantity spilled: 1
estimated spill area: 0
latitude: 4.936583
longitude: 7.184694
cause: sabotage
cause detail:
cleanup / recovery duratiom: 52
terrain: Land
delay:
incident year: 2012
site location name: 12' Imo River II - Ogale Pipeline at Owaza.
estimated quantity spilled: 1
estimated spill area: 0
latitude: 4.933889
longitude: 7.184639
cause: sabotage
cause detail:
cleanup / recovery duratiom: 50
terrain: Land
delay:
incident year: 2012
site location name: 8' Cawthorne Channel II Pipeline at Tigerkiri
estimated quantity spilled: 7
estimated spill area: 0.2279
latitude: 4.577167
longitude: 6.998389
cause: sabotage
cause detail:
cleanup / recovery duratiom: 405
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2012
site location name: 24' Alakiri-Bonny GPHSL at Fusokiri
estimated quantity spilled: 7
estimated spill area: 0.0059
latitude: 4.500222
longitude: 7.120889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 70
terrain: Swamp
delay:
incident year: 2012
site location name: Awoba Well 8T at Awoba
estimated quantity spilled:
estimated spill area:
latitude: ND
longitude: ND
cause: yet to be determined
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2012
site location name: 24' Bomu - Bonny Trans Niger Pipeline at Mogho
estimated quantity spilled: 16
estimated spill area: 0.003219
latitude: 4.644889
longitude: 7.277528
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2012
site location name: 36' Nkpoku - Bomu Trunkline at Eneka.
estimated quantity spilled: 1
estimated spill area: 0.00003
latitude: 4.917639
longitude: 7.028306
cause: sabotage
cause detail:
cleanup / recovery duratiom: 72
terrain: Land
delay:
incident year: 2012
site location name: 36' Nkpoku - Bomu Trans Niger Pipeline at Agbonchia
estimated quantity spilled: 3.5
estimated spill area: 0.000068
latitude: 4.837056
longitude: 7.123139
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2013
site location name: Assa Manifold
estimated quantity spilled: 1.24
estimated spill area: 0.000359
latitude: 5.369194
longitude: 6.800028
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 1
terrain: Land
delay:
incident year: 2012
site location name: Nkali Well 10L flow line Right of Way
estimated quantity spilled: 4.1
estimated spill area: 0.0003
latitude: 4.978444
longitude: 7.10025
cause: sabotage
cause detail:
cleanup / recovery duratiom: 111
terrain: Land
delay:
incident year: 2012
site location name: Imo River 3 Well 33 L Wellhead at Owaza
estimated quantity spilled: 0.5
estimated spill area: 0.000088
latitude: 4.979028
longitude: 7.200083
cause: sabotage
cause detail:
cleanup / recovery duratiom: 41
terrain: Land
delay:
incident year: 2014
site location name: Forcados Estuary Well 15L (JB Well Cluster) at Ogulagha
estimated quantity spilled: 5
estimated spill area:
latitude: 5.3831944
longitude: 5.29425
cause: operational
cause detail: (operational and maintenance error )
cleanup / recovery duratiom: 71
terrain: Water
delay:
incident year: 2011
site location name: 10'' Kokori Pipeline at Idjerhe
estimated quantity spilled: 3.5
estimated spill area:
latitude: 5.583571
longitude: 6.066698
cause: sabotage
cause detail:
cleanup / recovery duratiom: 32
terrain: Land
delay:
incident year: 2012
site location name: 20' Buguma - Alakiri TL at Daily Bread (Bukuma)
estimated quantity spilled: 2.4
estimated spill area: 0.001
latitude: 4.743056
longitude: 6.90825
cause: sabotage
cause detail:
cleanup / recovery duratiom: 58
terrain: Swamp
delay:
incident year: 2012
site location name: Ubie Well 5L Flow line at Ubie
estimated quantity spilled: 3.8
estimated spill area:
latitude: 5.113194
longitude: 6.553472
cause: sabotage
cause detail:
cleanup / recovery duratiom: 54
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2012
site location name: 16' Egbema - Assa Trunkline at Assa
estimated quantity spilled: 0.5
estimated spill area: 0.0001
latitude: 5.39
longitude: 6.792583
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 22
terrain: Land
delay:
incident year: 2012
site location name: 20’’ Otumara – Escravos Trunkline at Adjudaibo
estimated quantity spilled: 574
estimated spill area:
latitude: 5.568611
longitude: 5.205361
cause: sabotage
cause detail:
cleanup / recovery duratiom: 137
terrain: Swamp
delay:
incident year: 2011
site location name: 8'' Northbank - Northbank tie-in Manifold
estimated quantity spilled: 77.1
estimated spill area:
latitude: 5.410361
longitude: 5.322778
cause: operational
cause detail: (operational and maintenance error )
cleanup / recovery duratiom: 151
terrain: Swamp
delay:
incident year: 2012
site location name: 24' Nkpoku-Bonny Pipeline at Biara
estimated quantity spilled: 3
estimated spill area: 0.00005
latitude: 4.703806
longitude: 7.279639
cause: sabotage
cause detail:
cleanup / recovery duratiom: 347
terrain: Land
delay:
incident year: 2013
site location name: Awoba Well 3S Flowline at Bille
estimated quantity spilled: 2
estimated spill area:
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom: 98
terrain: Swamp
delay:
incident year: 2013
site location name: 4' Ubie Well 4S Flowline at Idu Ekpeye
estimated quantity spilled: 2
estimated spill area: 0.00345
latitude: 5.104194
longitude: 6.555167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 105
terrain: Land
delay:
incident year: 2013
site location name: 4' Adibawa North East (ADNE) Well 10S Flowline at Edagberi/Betterland
estimated quantity spilled: 0.2
estimated spill area: 0.0002
latitude: 5.203306
longitude: 6.516694
cause: sabotage
cause detail:
cleanup / recovery duratiom: 125
terrain: Land
delay:
incident year: 2011
site location name: 10'' Utorogu-Ughelli Pumping Station Pipeline at Otu-Jeremi
estimated quantity spilled: 0.05
estimated spill area:
latitude: 5.438639
longitude: 5.88375
cause: operational
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2013
site location name: 6' Imo River Well 59T Flowline at Igiriukwu
estimated quantity spilled: 3
estimated spill area: 0.0002
latitude: 4.99175
longitude: 7.1952222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 170
terrain: Land
delay:
incident year: 2013
site location name: 4' Ubie Well 5L Flowline at Idu Ekpeye
estimated quantity spilled: 3
estimated spill area: 0
latitude: 5.111028
longitude: 6.557417
cause: sabotage
cause detail:
cleanup / recovery duratiom: 111
terrain: Land
delay:
incident year: 2012
site location name: 28' Nkpoku -Bomu Pipeline at Kpoghor
estimated quantity spilled: 4
estimated spill area: 0.0001
latitude: 4.72
longitude: 7.223583
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2013
site location name: 4' Adibawa Well 10S Flowline at Edagberi
estimated quantity spilled: 4
estimated spill area:
latitude: 5.2045
longitude: 6.549917
cause: sabotage
cause detail:
cleanup / recovery duratiom: 100
terrain: Land
delay:
incident year: 2011
site location name: 6' Utorogu - Ughelli West Gasline at Iwhrekan
estimated quantity spilled: 6.65
estimated spill area:
latitude: 5.443889
longitude: 5.885917
cause: operational
cause detail:
cleanup / recovery duratiom: 99
terrain: Land
delay:
incident year: 2011
site location name: Ogini Well 9T Flowline at Ovrode/Ellu
estimated quantity spilled: 4.4
estimated spill area:
latitude: 5.572194
longitude: 6.318917
cause: sabotage
cause detail:
cleanup / recovery duratiom: 27
terrain: Land
delay:
incident year: 2013
site location name: Diebu Creek Well 15T Flowline at Peremabiri
estimated quantity spilled: 0.7
estimated spill area: 0.0003
latitude: 4.655167
longitude: 6.071833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 189
terrain: Land
delay:
incident year: 2013
site location name: Obigbo Well 9L Flow line at Umuebulu
estimated quantity spilled: 2
estimated spill area: 0.00001
latitude: 4.890222
longitude: 7.124861
cause: sabotage
cause detail:
cleanup / recovery duratiom: 166
terrain: Land
delay:
incident year: 2013
site location name: 18' Assa - Rumuekpe Pipeline at Elele-Alimini
estimated quantity spilled: 1
estimated spill area: 0.00002
latitude: 5.102139
longitude: 6.724528
cause: sabotage
cause detail:
cleanup / recovery duratiom: 216
terrain: Land
delay:
incident year: 2013
site location name: 4' Awoba North West Well 1L and 1S Flowlines at Boro
estimated quantity spilled: 21
estimated spill area:
latitude: 4.561056
longitude: 6.751611
cause: sabotage
cause detail:
cleanup / recovery duratiom: 117
terrain: Swamp
delay:
incident year: 2013
site location name: 18' Assa - Rumuekpe Trunkline at Awara
estimated quantity spilled: 1
estimated spill area: 0.000057
latitude: 5.316278
longitude: 6.78775
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2013
site location name: Ubie Well 4S Flowline at Iduekpeye
estimated quantity spilled: 0.4
estimated spill area: 0.000052
latitude: 5.098833
longitude: 6.546778
cause: sabotage
cause detail:
cleanup / recovery duratiom: 309
terrain: Land
delay:
incident year: 2013
site location name: 36'' Nkpoku-Bomu Pipeline at Agbonchia
estimated quantity spilled: 3
estimated spill area: 0.00011
latitude: 4.839444
longitude: 7.120361
cause: sabotage
cause detail:
cleanup / recovery duratiom: 4
terrain: Land
delay:
incident year: 2013
site location name: 18' Assa - Rumuekpe Trunkline at Egbeda
estimated quantity spilled: 0.9
estimated spill area: 0.000002
latitude: 5.240556
longitude: 6.770056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 139
terrain: Land
delay:
incident year: 2013
site location name: 4' Cawthorne Channel 1 Well 49L Flowline at Mbiama.
estimated quantity spilled: 2
estimated spill area: 0.001
latitude: 4.590472
longitude: 7.039333
cause: sabotage
cause detail:
cleanup / recovery duratiom: 120
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2013
site location name: 24' Nkpoku - Bomu Pipeline at Bera
estimated quantity spilled: 2
estimated spill area: 0.000052
latitude: 4.685972
longitude: 7.27775
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2013
site location name: 4' Nembe 1 Well 23T Flowline at Ewesuo
estimated quantity spilled: 14
estimated spill area:
latitude: 4.456472
longitude: 6.308528
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2013
site location name: 24' Bomu - Bonny Trans Niger Pipeline at Bodo City.
estimated quantity spilled: 11
estimated spill area: 0.0016
latitude: 4.570233
longitude: 7.255072
cause: sabotage
cause detail:
cleanup / recovery duratiom: 804
terrain: Swamp
delay:
incident year: 2013
site location name: 6' Yokri Manifold 7 Low Pressure 1 Line
estimated quantity spilled: 1
estimated spill area:
latitude: 5.448889
longitude: 5.224556
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2013
site location name: 36' Nkpoku - Bomu Pipeline at Elelenwo
estimated quantity spilled: 8
estimated spill area: 0.000013
latitude: 4.857139
longitude: 7.099667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 75
terrain: Land
delay:
incident year: 2013
site location name: 36' Nkpoku - Bomu Pipeline at Akpajo
estimated quantity spilled: 8
estimated spill area:
latitude: 4.851472
longitude: 7.106194
cause: sabotage
cause detail:
cleanup / recovery duratiom: 302
terrain: Land
delay:
incident year: 2013
site location name: 6' Kolo Creek Well 20T Flowline at Otuasega
estimated quantity spilled: 2
estimated spill area:
latitude: 4.892167
longitude: 6.370389
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: 36' Rumuekpe-Nkpoku Pipeline @ Aluu
estimated quantity spilled: 6.6
estimated spill area: 0.004
latitude: 4.944778
longitude: 6.939694
cause: sabotage
cause detail:
cleanup / recovery duratiom: 34
terrain: Land
delay:
incident year: 2013
site location name: 24' Nkpoku - Bomu Pipeline at Biara
estimated quantity spilled: 4
estimated spill area: 0.0002
latitude: 4.690139
longitude: 7.278139
cause: sabotage
cause detail:
cleanup / recovery duratiom: 311
terrain: Land
delay:
incident year: 2013
site location name: 18' Assa - Rumuekpe Pipeline at Awara
estimated quantity spilled: 0.4
estimated spill area: 0.000001
latitude: 5.318889
longitude: 6.788361
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2013
site location name: 36' Rumuekpe-Nkpoku pipeline at Aluu
estimated quantity spilled: 4
estimated spill area: 0.0003
latitude: 4.945667
longitude: 6.937389
cause: sabotage
cause detail:
cleanup / recovery duratiom: 177
terrain: Land
delay:
incident year: 2013
site location name: 24'' Nkpoku - Bomu TNP at Rumuowegwu-Eneka
estimated quantity spilled: 6
estimated spill area: 0.000213
latitude: 4.895722
longitude: 7.054806
cause: sabotage
cause detail:
cleanup / recovery duratiom: 115
terrain: Land
delay:
incident year: 2013
site location name: 24' Bomu - Bonny TNP at Owokiri
estimated quantity spilled: 16
estimated spill area:
latitude: 4.561083
longitude: 7.252
cause: sabotage
cause detail:
cleanup / recovery duratiom: 508
terrain: Swamp
delay:
incident year: 2013
site location name: 24' Bomu - Bonny Trans Niger Pipeline at Otokomabie / Oloma
estimated quantity spilled: 12
estimated spill area: 0.0154
latitude: 4.478333
longitude: 7.206194
cause: sabotage
cause detail:
cleanup / recovery duratiom: 133
terrain: Swamp
delay:
incident year: 2013
site location name: 12' Adibawa - Okordia DL at Ikarama (old line)
estimated quantity spilled: 1.8
estimated spill area:
latitude: 5.16575
longitude: 6.470528
cause: sabotage
cause detail:
cleanup / recovery duratiom: 71
terrain: Land
delay:
incident year: 2013
site location name: 12' Imo River - Ogale Pipeline at Owaza
estimated quantity spilled: 0.8
estimated spill area: 0.00003
latitude: 4.9690833
longitude: 7.1851389
cause: sabotage
cause detail:
cleanup / recovery duratiom: 168
terrain: Land
delay:
incident year: 2013
site location name: 3' Imo River Well 5L Flowline at Igiriukwu
estimated quantity spilled: 10
estimated spill area: 0.00048
latitude: 4.982222
longitude: 7.178556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 374
terrain: Land
delay:
incident year: 2012
site location name: 16' Egbema - Assa Trunkline at Umudike
estimated quantity spilled: 155
estimated spill area: 0.0039
latitude: 5.449778
longitude: 6.766667
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 32
terrain: Land
delay: community
incident year: 2011
site location name: Yokri Well 114S flowline
estimated quantity spilled: 3
estimated spill area:
latitude: 5.454722
longitude: 5.233278
cause: operational
cause detail:
cleanup / recovery duratiom: 172
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2012
site location name: 24' Nkpoku - Bomu Pipeline at Egbalor
estimated quantity spilled: 5
estimated spill area: 0.001041
latitude: 4.788
longitude: 7.183222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 184
terrain: Land
delay:
incident year: 2013
site location name: 4' Nun River Well 13T Flowline at Oporoma
estimated quantity spilled: 0.7
estimated spill area: 0
latitude: 4.806583
longitude: 6.101694
cause: sabotage
cause detail:
cleanup / recovery duratiom: 98
terrain: Land
delay:
incident year: 2013
site location name: 24' Nkpoku- Bomu Pipeline at B-Dere
estimated quantity spilled: 2
estimated spill area:
latitude: 4.675472
longitude: 7.276639
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2013
site location name: 24' Nkpoku - Bomu Trans Niger Pipeline at Eteo
estimated quantity spilled: 5
estimated spill area: 0.0003
latitude: 4.779056
longitude: 7.198361
cause: sabotage
cause detail:
cleanup / recovery duratiom: 102
terrain: Land
delay:
incident year: 2011
site location name: 16'' UPS - Utorogu T/L at Iwhrekan
estimated quantity spilled: 9.03
estimated spill area:
latitude: 5.454917
longitude: 5.89
cause: operational
cause detail: (sabotage)
cleanup / recovery duratiom: 176
terrain: Land
delay:
incident year: 2013
site location name: 6' Cawthorne Channel Well 45T Flowline at Mbikiri
estimated quantity spilled: 0.7
estimated spill area: 0.0005
latitude: 4.5641944
longitude: 7.0005
cause: sabotage
cause detail:
cleanup / recovery duratiom: 94
terrain: Swamp
delay:
incident year: 2011
site location name: Well 4T Flowline at Batan
estimated quantity spilled: 1.22
estimated spill area:
latitude: 5.528417
longitude: 5.534028
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2013
site location name: 28' Old Nembe Creek Pipeline Riser at Ido
estimated quantity spilled: 9
estimated spill area: 0.0141
latitude: 4.575972
longitude: 6.975417
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2011
site location name: Batan Well 4T Flowline at Batan
estimated quantity spilled: 0
estimated spill area:
latitude: 5.532472
longitude: 5.53825
cause: operational
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2013
site location name: Imo River Well 21L Flowline at Igiriukwu / Esi-Etitioha
estimated quantity spilled: 7
estimated spill area: 0.000018
latitude: 4.9799444
longitude: 7.1756667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 177
terrain: Land
delay:
incident year: 2013
site location name: 8'' Cawthorne Channel 2 Pipeline at Mbiama Elem-Kalabari
estimated quantity spilled: 0.9
estimated spill area:
latitude: 4.5687222
longitude: 7.0002222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 244
terrain: Swamp
delay:
incident year: 2011
site location name: Ughelli West Well 2L 3'' Flowline
estimated quantity spilled: 19.5
estimated spill area:
latitude: 5.534694
longitude: 5.896667
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 332
terrain: Land
delay: community
incident year: 2012
site location name: 8'' Ughelli West - UPS Delivery line at Ekakpamre
estimated quantity spilled: 150
estimated spill area:
latitude: 5.536722
longitude: 5.879944
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 84
terrain: Land
delay:
incident year: 2013
site location name: 20''Otumara-Escravos Pipeline at Ogidigben
estimated quantity spilled: 4
estimated spill area:
latitude: 5.551972
longitude: 5.202528
cause: sabotage
cause detail:
cleanup / recovery duratiom: 327
terrain: Swamp
delay:
incident year: 2013
site location name: 36' Nkpoku - Bomu Pipeline at Agbonchia
estimated quantity spilled: 3
estimated spill area: 0.0001
latitude: 4.8399444
longitude: 7.1196667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 201
terrain: Land
delay:
incident year: 2013
site location name: 12” Oguta-Egbema Pipeline at Obiakpu
estimated quantity spilled: 12
estimated spill area: 0.0002
latitude: 5.55425
longitude: 6.7617778
cause: sabotage
cause detail:
cleanup / recovery duratiom: 167
terrain: Land
delay:
incident year: 2013
site location name: 28' Nkpoku - Bomu Pipeline at B-Dere
estimated quantity spilled: 4
estimated spill area: 0.0002
latitude: 4.6884722
longitude: 7.2571111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 83
terrain: Land
delay:
incident year: 2014
site location name: Santa Barbara Well 6T Flowline at Ikegimakiri
estimated quantity spilled: 5
estimated spill area: 0.0001
latitude: 4.5523056
longitude: 6.5120556
cause: sabotage
cause detail:
cleanup / recovery duratiom: 179
terrain: Swamp
delay:
incident year: 2011
site location name: 24' Ughelli Pumping Station -Rapele Pipeline at Uvwiamuge
estimated quantity spilled: 4.76
estimated spill area:
latitude: 5.543083
longitude: 5.8835
cause: operational
cause detail:
cleanup / recovery duratiom: 178
terrain: Land
delay:
incident year: 2014
site location name: 20' Opukushi - Brass Creek Pipeline at Tamogbene
estimated quantity spilled: 7
estimated spill area: 0.0006
latitude: 4.93735
longitude: 5.7065167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 155
terrain: Swamp
delay:
incident year: 2012
site location name: 24' UPS-Rapele Pipeline ROW at Ugbokodo
estimated quantity spilled: 14.7
estimated spill area:
latitude: 5.572694
longitude: 5.675806
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 318
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2014
site location name: 28' Nkpoku - Bomu Pipeline at Aleto
estimated quantity spilled: 0.4
estimated spill area:
latitude: 4.8086464
longitude: 7.1042147
cause: sabotage
cause detail:
cleanup / recovery duratiom: 203
terrain: Land
delay:
incident year: 2011
site location name: Well 4T at Ogini
estimated quantity spilled: 0.02
estimated spill area:
latitude: 5.574194
longitude: 6.311833
cause: operational
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2014
site location name: 28' Nkpoku - Bomu Pipeline at B-Dere
estimated quantity spilled: 0.7
estimated spill area:
latitude: 4.6943556
longitude: 7.2862417
cause: sabotage
cause detail:
cleanup / recovery duratiom: 131
terrain: Swamp
delay:
incident year: 2014
site location name: Otumara Well - 22L Flowline at Ugboegungun
estimated quantity spilled: 2
estimated spill area:
latitude: 5.633
longitude: 5.1583611
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 236
terrain: Swamp
delay:
incident year: 2011
site location name: Otumara Well 22L Flowline at Otumara
estimated quantity spilled: 21.99
estimated spill area:
latitude: 5.633
longitude: 5.158389
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 99
terrain: Swamp
delay: community
incident year: 2014
site location name: 6'' Obigbo North - Ogale Pipeline at Ogale
estimated quantity spilled: 0.8
estimated spill area: 0
latitude: 4.8220278
longitude: 7.1544167
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2014
site location name: 48” Forcados Export line (circa 8km from the Coastline)
estimated quantity spilled: 17
estimated spill area:
latitude: ND
longitude: ND
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2012
site location name: Imo River 1 Well 57L Flowline at Igiriukwu
estimated quantity spilled: 18.7
estimated spill area:
latitude: 4.995056
longitude: 7.176056
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2014
site location name: 20' Otumara -Escravos pipelines at Ugboegungun
estimated quantity spilled: 0.7
estimated spill area:
latitude: 5.6135
longitude: 5.1745833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 164
terrain: Swamp
delay:
incident year: 2011
site location name: Otumara Well 44S Wellhead flowline riser at Otumara
estimated quantity spilled: 1.8
estimated spill area:
latitude: 5.659278
longitude: 5.148167
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 11
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2013
site location name: 24' Trans Niger Pipeline at Okolo Launch
estimated quantity spilled: 20
estimated spill area: 0.0053
latitude: 4.501917
longitude: 7.221278
cause: sabotage
cause detail:
cleanup / recovery duratiom: 184
terrain: Swamp
delay:
incident year: 2013
site location name: 4' Oguta Well 6S Flowline at Umuashichi
estimated quantity spilled: 0.1
estimated spill area: 0.00000055
latitude: 5.6645
longitude: 6.7040278
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom:
terrain: Land
delay:
incident year: 2011
site location name: Agbada Well 58L Wellhead at Agbada
estimated quantity spilled: 1
estimated spill area:
latitude: ND
longitude: ND
cause: operational
cause detail:
cleanup / recovery duratiom: 17
terrain: Land
delay:
incident year: 2013
site location name: 24' Bomu - Bonny Trans Niger Pipeline at Bodo West
estimated quantity spilled: 24
estimated spill area: 0.0034
latitude: 4.579444
longitude: 7.256028
cause: sabotage
cause detail:
cleanup / recovery duratiom: 716
terrain: Swamp
delay:
incident year: 2011
site location name: Otamiri Well 7L Flowline at Umuechem
estimated quantity spilled: 1
estimated spill area:
latitude: ND
longitude: ND
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 26
terrain: Land
delay: community
incident year: 2013
site location name: Cawthorne Channel 1 Well 50S Flowline at Cawthorne Channel.
estimated quantity spilled: 26
estimated spill area: 0.0115
latitude: 4.556889
longitude: 7.034361
cause: sabotage
cause detail:
cleanup / recovery duratiom: 186
terrain: Swamp
delay:
incident year: 2013
site location name: Nembe 2 Well17S Flowline at Nembe
estimated quantity spilled: 33
estimated spill area:
latitude: 4.439639
longitude: 6.320778
cause: sabotage
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2011
site location name: 16'' Uzere-Eriemu Pipeline at Iyede
estimated quantity spilled: 36.5
estimated spill area:
latitude: 5.492556
longitude: 6.091806
cause: sabotage
cause detail:
cleanup / recovery duratiom: 70
terrain: Land
delay: community
incident year: 2013
site location name: 4' Cawthorne Channel Well 51T flowline at Mbiama
estimated quantity spilled: 1
estimated spill area: 0.0009
latitude: ND
longitude: ND
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 267
terrain: Swamp
delay:
incident year: 2011
site location name: 24” Cawthorne Channel – Bonny Block Valve Staion at Kalibiama & 24” Cawthorne Channel – Bonny pipeline at kalibiama
estimated quantity spilled: 64.4
estimated spill area: 0.0397
latitude: 4.492444
longitude: 7.149111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 100
terrain: Swamp
delay:
incident year: 2011
site location name: Belema well 3 at Belema
estimated quantity spilled: 69
estimated spill area: 0.007927
latitude: 4.390444
longitude: 6.656167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 21
terrain: Swamp / Water
delay:
incident year: 2014
site location name: 4'' Adibawa Well 10S Flowline at Adibawa
estimated quantity spilled: 1
estimated spill area:
latitude: 5.2032778
longitude: 6.5166111
cause: sabotage
cause detail:
cleanup / recovery duratiom: 206
terrain: Land
delay:
incident year: 2014
site location name: Nembe 1 Well 35L Flowline at Nembe Creek
estimated quantity spilled: 2
estimated spill area:
latitude: 4.4358056
longitude: 6.324
cause: sabotage
cause detail:
cleanup / recovery duratiom: 203
terrain: Swamp
delay:
incident year: 2013
site location name: Cawthorne Channel 3 Well 41S Flowline at Sand-Sand
estimated quantity spilled: 2
estimated spill area: 0.0008
latitude: ND
longitude: ND
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 365
terrain: Swamp
delay:
incident year: 2012
site location name: Bonny Well 2L Right Of Way Flowline at Bonny
estimated quantity spilled: 4
estimated spill area:
latitude: ND
longitude: ND
cause: operational
cause detail:
cleanup / recovery duratiom:
terrain: Swamp
delay:
incident year: 2011
site location name: 14' Okordia - Rumuekpe Pipeline at Ikarama
estimated quantity spilled: 83.3
estimated spill area: 0.00645
latitude: 5.153361
longitude: 6.453028
cause: sabotage
cause detail:
cleanup / recovery duratiom: 77
terrain: Land
delay:
incident year: 2014
site location name: Yokri manifold - 8 LP2 bulk line at Yokri
estimated quantity spilled: 7
estimated spill area:
latitude: ND
longitude: ND
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 165
terrain: Swamp
delay:
incident year: 2014
site location name: Opukushi Well 9 Flowline Egbemo-Angalabiri
estimated quantity spilled: 23
estimated spill area:
latitude: ND
longitude: ND
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 253
terrain: Swamp
delay:
incident year: 2014
site location name: 24' Nkpoku - Bomu Trans Niger Pipeline at Biara
estimated quantity spilled: 1
estimated spill area: 0.0002
latitude: 4.6951389
longitude: 7.2786667
cause: sabotage
cause detail:
cleanup / recovery duratiom: 97
terrain: Land
delay:
incident year: 2014
site location name: Opukushi Well 24T Flowline at Egbemo-Angalabiri
estimated quantity spilled: 114
estimated spill area:
latitude: ND
longitude: ND
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 346
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2014
site location name: 28' Nkpoku - Bomu Pipeline at B-Dere
estimated quantity spilled: 4
estimated spill area:
latitude: 4.6823611
longitude: 7.2635
cause: sabotage
cause detail:
cleanup / recovery duratiom: 82
terrain: Land
delay:
incident year: 2014
site location name: 28'' Bomu-Bonny Pipeline at Bodo-City
estimated quantity spilled: 3
estimated spill area:
latitude: 4.5637222
longitude: 7.25175
cause: sabotage
cause detail:
cleanup / recovery duratiom: 396
terrain: Land
delay:
incident year: 2011
site location name: 12' Imo River 2 Pipeline at Owaza
estimated quantity spilled: 138.5
estimated spill area: 0.0009
latitude: 4.980694
longitude: 7.174528
cause: sabotage
cause detail:
cleanup / recovery duratiom: 36
terrain: Land
delay: other (terrain, floods, ...)
incident year: 2013
site location name: Cawthorne Channel Loop line Tie-in Manifold at Ilomaturu
estimated quantity spilled: 166
estimated spill area:
latitude: 4.550611
longitude: 7.060583
cause: sabotage
cause detail:
cleanup / recovery duratiom: 268
terrain: Swamp
delay:
incident year: 2014
site location name: Opukushi Well 24T Flowline at Egbemo-Angalabiri
estimated quantity spilled: 116
estimated spill area:
latitude: ND
longitude: ND
cause: operational
cause detail: (corrosion)
cleanup / recovery duratiom: 358
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2011
site location name: 8' Isimiri Pipeline at Umuaghala
estimated quantity spilled: 204
estimated spill area: 0.0084
latitude: 4.876333
longitude: 7.238889
cause: sabotage
cause detail:
cleanup / recovery duratiom: 79
terrain: Land
delay:
incident year: 2014
site location name: 36'' Nkpoku-Bomu Pipeline at Atali
estimated quantity spilled: 4
estimated spill area:
latitude: 4.88225
longitude: 7.0704167
cause: sabotage
cause detail:
cleanup / recovery duratiom: 41
terrain: Land
delay:
incident year: 2012
site location name: 16' Nun-River - Kolo Creek Trunkline at Oporoma
estimated quantity spilled: 344.8
estimated spill area: 0.0146
latitude: 4.807694
longitude: 6.101944
cause: sabotage
cause detail:
cleanup / recovery duratiom: 63
terrain: Swamp
delay: other (terrain, floods, ...)
incident year: 2014
site location name: 10” Diebu Creek-Nun River Pipeline at Onyoma
estimated quantity spilled: 367
estimated spill area:
latitude: 4.7526944
longitude: 6.1028056
cause: sabotage
cause detail:
cleanup / recovery duratiom: 190
terrain: Land
delay:
incident year: 2011
site location name: Opukushi Well 34T flowline at Agbidiama / Egbemor-Angalabiri
estimated quantity spilled: 134.4
estimated spill area:
latitude: ND
longitude: ND
cause: operational
cause detail: (equipment failure)
cleanup / recovery duratiom: 49
terrain: Swamp
delay:
incident year: 2014
site location name: 28' Bomu - Bonny Trans Niger Pipeline at Bodo West
estimated quantity spilled: 12
estimated spill area:
latitude: 4.5749167
longitude: 7.2542222
cause: sabotage
cause detail:
cleanup / recovery duratiom: 173
terrain: Land
delay:
incident year: 2012
site location name: 20'' Otumara - Escravos Pipeline at Escravos
estimated quantity spilled: 611
estimated spill area:
latitude: 5.574028
longitude: 5.206306
cause: sabotage
cause detail:
cleanup / recovery duratiom: 107
terrain: Swamp
delay:
incident year: 2014
site location name: Belema Well 9T Well Head at Belema
estimated quantity spilled: 10
estimated spill area: 0.0311
latitude: 4.4154444
longitude: 6.6441389
cause: sabotage
cause detail:
cleanup / recovery duratiom: 175
terrain: Swamp
delay:
incident year: 2012
site location name: 16' Nun-River - Kolo Creek Pipeline at Aguobiri
estimated quantity spilled: 937.3
estimated spill area: 0.224
latitude: 4.822583
longitude: 6.1425
cause: sabotage
cause detail:
cleanup / recovery duratiom: 106
terrain: Swamp
delay:
incident year: 2014
site location name: Belema Well 2T Well Head at Belema
estimated quantity spilled: 15
estimated spill area: 0.0536
latitude: 4.4029722
longitude: 6.6335833
cause: sabotage
cause detail:
cleanup / recovery duratiom: 174
terrain: Swamp
delay: